Skip to content

Track B: start the cumulative attempt ledger (B2 attempt 1, FAIL) - #548

Merged
MaxGhenis merged 2 commits into
masterfrom
trackb-attempt-ledger-20261018
Oct 18, 2026
Merged

MaxGhenis merged 2 commits into
masterfrom
trackb-attempt-ledger-20261018

Conversation

@MaxGhenis

Copy link
Copy Markdown
Contributor

What

This PR starts docs/design/track_b_attempt_ledger.md, the cumulative attempt ledger that the Track B design's §7 requires ("by mechanism and gate family; renaming a module or registration does not reset the counter"). Its first gate family is B2.

It records two rows:

It is a separate PR from #547, B2's run record, which by registration adds only the run's files. The two PRs are independent.

It is docs only: no code, test or tier-count change.

axiom: n/a (Track B process record)

🤖 Generated with Claude Code

…(FAIL)

Design §7 requires a cumulative attempt ledger by mechanism and gate
family. This records B2: the first registration's floor stop (not an
attempt) and the rescoped registration's scored run, attempt 1, FAIL
(#42 comments 6200099988 and 6252752628).

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
@vercel

vercel Bot commented Oct 18, 2026 •

Copy link
Copy Markdown

The latest updates on your projects. Learn more about Vercel for GitHub.

Project Deployment Actions Updated
social-security-model Ready Ready Preview Oct 18, 2026 5:30pm UTC

Request Review

…ords sentence

Review round 1 of #548: the registration also counts ABORTED_AFTER_GAPS,
a second interruption and an incomplete score file as attempts; and the
claim that every earlier gate's attempts sit in its #42 registration was
not shown.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
@MaxGhenis
MaxGhenis merged commit ad42ecc into master Oct 18, 2026
12 checks passed
@MaxGhenis

Copy link
Copy Markdown
Contributor Author

Merged at head 164c7b9e as merge commit ad42ecc0 (2026-10-18 18:24Z).

Gates: gh pr checks exited 0 on the latest run, and the PR was MERGEABLE and not a draft, with no changes requested.

Reviews:

  • Round 1 (job 20261018-131505-trackb-b2-results-prs-r1, Astra) requested two changes: count spent attempts, and drop an unverified sentence about earlier records. Both are fixed in 164c7b9e.
  • Round 2 (job 20261018-132923-trackb-ledger-548-r2, Astra): APPROVE, with no findings.

This branch was successfully deployed

1 active deployment
Preview — 164c7b9e Deployed Oct 18, 2026 by vercel[bot]
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant