Skip to content

Infra CC2: OpenWiz CI fails new disallowed comments, and every Rust allow states its reason #1817

Closed

Description

@jparker2006

Parent

Ticket CC2 of spec #1815 (Infra). Size: S.

What to build

OpenWiz's CI runs the checker's diff mode on every pull request, and OpenWiz's whole-repository BEFORE count is recorded. The Rust allow-reason lint moved to CC13, which waits for cleanup wave 3 to finish trimming the test folders those attributes live in.

Owned paths

Relies on: contracts/comments.v1.md

Links

Acceptance criteria

  • The repository carries a byte-identical copy of the checker and the contract, and CI runs the checker's diff mode on every pull request
  • A red-first test shows CI failing a pull request that adds a disallowed comment, and passing one with a reasoned escape tag
  • OpenWiz's whole-repository BEFORE count is recorded
  • Off limits: never edit a file in an open pull request of a 0.1.0 must-list ticket before RL1 (0.1.0 RL1: OpenWiz 0.1.0 ships before Demo Day: branch, changelog, gates and publish #1671) records the release branch cut, a file owned by an open cleanup wave 3 ticket (Infra spec: Cleanup wave 3: the kernel, drivers, CLI and app, nothing else #1774), or the private repository's frozen copy. Read the lists at start and at each merge of main; the pull request lists what it skipped.
  • Test rule (The test rule: what earns a test, and what never does #687): every new test protects a supported behaviour, a contract others rely on or a safety invariant, and the pull request says per test catches: <the bug>, or no new test: <why>. No mock-returns-stub, source mirroring, compiler re-checks, quota tests or unreachable cases; a bug gets a failing test first.
  • Every test the pull request deletes names its keeper (a test that still catches its bug) or says the behaviour it protected is gone.

Proof

P2 for OpenWiz: a red-first CI test and one deliberately failing run linked in the pull request.

Activity

  1. added this to the Infra milestone on Nov 20, 2026
  2. added
    held
    on Nov 20, 2026
  3. added
    ready-for-agent
    and removed
    held
    on Nov 20, 2026
  4. jparker2006 commented on Nov 20, 2026

    @jparker2006
    MemberAuthor

    launch-fleet: start checked, branch room/1817-ci-comment-check

    F6 prepare: CC1 #1816 approved at 2334ca0 (PR #1842), not merged; merges main after CC1 merges

  5. jparker2006 commented on Nov 20, 2026

    @jparker2006
    MemberAuthor

    agent: builder
    state: done
    harness: Claude Code
    model: Opus 5.5
    skills: build-ticket@0.2.0
    step: Fixed R1 by merging CC14's checker fix and handed back the green head for re-check.
    time: 2026-11-20T17:52:26Z
    pr: #1955

  6. jparker2006 commented on Nov 20, 2026

    @jparker2006
    MemberAuthor

    Builder question (needs-info): two of CC2's owned paths are held by open cleanup wave 3 tickets.

    Checkpoint pushed: room/1817-ci-comment-check at bcbf840f. It is built on CC1's approved head 2334ca05 (merged in), and holds the BEFORE count at main ea148ded: 417 files, 13,224 comment lines, 13,065 disallowed (docs/evidence/comment-cut/openwiz-before.txt).

    What I found at start (15:50Z):

    1. .github/workflows/ci.yml is owned outright by Infra CW3-T3: CI runs only what guards the kept parts; old CI machinery goes #1777 (CW3-T3), which is open and doesn't mark it shared. Infra CW3-T4: the test-value kit, fleet-load, open-import, roadmap and CI-overload tools go #1778 and Infra CW3-T10: the installer and kept tools keep only the tests that guard a user path #1782 mark it shared; Infra CW3-T3: CI runs only what guards the kept parts; old CI machinery goes #1777 doesn't. My launch says to stop and ask before I edit it. Without it there is no comment-check step, no CC1 proofs in CI, no red-first CI test and no deliberately failing run (criteria 1 and 2).

    2. The lint line can't go green from my paths. All 33 allow attributes without a reason are #[allow(dead_code)], and every one is outside what I may edit:

      Every workspace member uses [lints] workspace = true, and CI runs clippy -D warnings. So adding clippy::allow_attributes_without_reason to Cargo.toml turns all 33 into errors. The ticket's bullet assumed these attributes were in crates/; except for those 2 test files, they aren't.

    Options:

    My pick: (b). The diff check is the part that stops new comments. The lint can only be fixed after #1781 settles which test files survive. With (b), (a)'s path addition still applies to the follow-up.

  7. added
    needs-info
    on Nov 20, 2026
  8. jparker2006 commented on Nov 20, 2026

    @jparker2006
    MemberAuthor

    launch-fleet: asked the orchestrator

    The ci.yml ownership (#1777) and the tests/ allow sites (#1781) question in the comment above went to the orchestrator.

  9. jparker2006 commented on Nov 20, 2026

    @jparker2006
    MemberAuthor

    Orchestrator ruling (CC2): option (b).

  10. added
    held
    ready-for-agent
    and removed
    ready-for-agent
    on Nov 20, 2026
  11. 6 remaining items

  12. removed
    needs-info
    on Nov 20, 2026
  13. jparker2006 commented on Nov 20, 2026

    @jparker2006
    MemberAuthor

    launch-fleet: review started a8a60d2

    PR #1955 at its green hand-back head; other-family reviewer. Hand check under the J87 planner's ruling on #1958.

  14. jparker2006 commented on Nov 20, 2026

    @jparker2006
    MemberAuthor

    launch-fleet: findings sent a8a60d2

    R1 (verdict 7045098402 on PR #1955) sent to the CC2 builder. The checker's quoting fix belongs to CC14 #1953; the builder merges main in after #1953 merges and hands back a new green head for the same reviewer's re-check.

  15. added 2 commits that reference this issue on Nov 20, 2026
  16. jparker2006 commented on Nov 20, 2026

    @jparker2006
    MemberAuthor

    launch-fleet: merge queued d201e97: the APPROVE 7046848884 (same reviewer's re-check, re-check sent 7046809936) and the plan approval 7044657060

    PR #1955 at queue position 1. Checked before queueing: APPROVE names the exact head; required ci and privacy green at it (all checks green); mergeable, clean, no native blocker; no open CHANGES or pending orchestrator decision; CC14 #1953 closed; no merge gate applies to CC2 (not a carried copy, not CC5/CC6/CC7/WizSite). ci.yml shared-file rule (ruling 7044190217): #1777 is still open, so it merges second and merges main in with a re-check.

  17. jparker2006 commented on Nov 20, 2026

    @jparker2006
    MemberAuthor

    launch-fleet: cost unknown (PR #1955): no cost command

  18. jparker2006 commented on Nov 20, 2026

    @jparker2006
    MemberAuthor

    launch-fleet: archived

  19. added 6 commits that reference this issue on Nov 21, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    ready-for-agent

    Type

    No type

    Projects

    No projects

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions