Skip to content

Infra spec: The comment cut: only comments that earn their place, in every repo #1815

Closed
14 of 14 issues completed

Description

@jparker2006

Problem Statement

Our repositories are full of comments that no check enforces. Agents copy whatever they find, and a comment is often an agent's justification for a workaround, or one old correction turned into a rule forever. Comments go stale, nobody reads them, and they make every file longer for the next agent. Across OpenWiz, WizSkills, WizSite, WizRoom, WizLoops and the private repository's live tools there are roughly 18,000 comment lines today, and nothing stops new ones arriving with every pull request.

Solution

Cut comments to only the ones that earn their place, in every repository, and keep it that way:

  • What stays (C2): licence and notice headers; a constraint from outside the code that can't be changed (an API quirk, a platform bug), with a link; public API docs that a published documentation build renders; security or data-loss warnings; and private-record pointers. Every other comment goes. Tool directives the code needs to run or build (a shebang, an encoding line, a lint or formatter switch that states its reason) are code, not comments.
  • Meaning first: a comment that carried real meaning becomes a check, a test or a clearer name before it is deleted. A surprise in our own code is a rename, an extracted function, a type or a test, never a comment. If unsure, the comment goes.
  • Keeping it that way (C3): a small CI check per repository fails a pull request that adds a comment outside the allowed kinds, with a reasoned escape tag for the rare real exception. The reviewer's comment pass in review-ticket and the skill text ship in WizSkills 0.2.1.
  • Measured: each repository's comment lines are counted BEFORE and AFTER the same way, and the war room tracks them per repository going down.

Changelog headline

none

User Stories

  1. As an agent starting a ticket, I want code with no stale or justifying comments, so that I copy good patterns instead of old workarounds.
  2. As a reviewer, I want a pull request that adds a disallowed comment to fail CI, so that I don't have to read for it.
  3. As a builder, I want a reasoned escape tag for the rare real exception, so that a true external constraint can still be written down.
  4. As a builder, I want one written list of what stays, so that every repository cuts the same way.
  5. As the owner, I want each repository's comment lines counted before and after, so that I can see the cut happened.
  6. As the owner, I want the war room to show comment lines per repository over time, so that I see them stay down.
  7. As a builder cutting comments, I want a comment that carried meaning turned into a check, a test or a clearer name first, so that no knowledge is lost.
  8. As the release agent, I want the cut to stay off the 0.1.0 must-list files until the release branch is cut, so that the release is never put at risk.
  9. As the cleanup lead, I want the cut never to edit files cleanup wave 3 is deleting or moving, so that the two never collide.
  10. As a reviewer in WizSkills 0.2.1, I want review-ticket to treat a justification comment, a workaround comment or an unjustified suppression as a finding that says what to fix, so that comments don't creep back.
  11. As a user of the private records, I want private-record pointers and privacy warnings kept, so that the open-development contract still holds.

Implementation Decisions

  • One contract and one checker, first. A comments contract (v1, with fixtures) pins the allowed kinds above, the meaning-first rule, the escape tag (one form, with a required reason), what counts as a comment per language in our repositories (Rust, Python, shell, YAML, TOML, JavaScript, CSS, HTML), what is excluded from counts (vendored, generated and licence files), and the BEFORE and AFTER count report. A small standard-library checker implements it: a diff mode for CI (added lines only, so old comments never fail a pull request) and a count mode. Each repository carries a byte-identical copy.
  • Lauren Tan's rules, in our words. From pstack's /no-comments (Lauren Tan, MIT): if unsure, delete; a surprise in our own code is a refactor, not a comment; "important" and "do not remove" comments are leads to check, not proof; a lint suppression on a correctness rule is removed and the cause fixed; constraint comments become checks. No persona. Private-record pointers are our added exception. Credit the source; copy no text word for word.
  • One ticket per repository, each cutting its comments, carrying the checker and wiring it into CI, and recording its BEFORE and AFTER counts. OpenWiz is split by area to fit one builder each, and its last ticket sweeps what the others skipped, after the 0.1.0 release branch is cut and after cleanup wave 3 has deleted or moved its files.
  • OpenWiz's Rust gets a lint: every allow attribute must state its reason, so CI, not a reviewer, enforces it.
  • Off limits until their time: files in open pull requests of 0.1.0 must-list tickets (until RL1, 0.1.0 RL1: OpenWiz 0.1.0 ships before Demo Day: branch, changelog, gates and publish #1671, records the release branch cut), files owned by open cleanup wave 3 tickets (Infra spec: Cleanup wave 3: the kernel, drivers, CLI and app, nothing else #1774), and the private repository's frozen copy (never). Each ticket reads these lists when it starts and again when it merges main, and records what it skipped.
  • WizSkills pull requests merge only after WizSkills v0.2.0 is tagged, and ship in 0.2.1. WizSite merges deploy to openwiz.dev; the cut changes no visible behaviour.
  • The war room gains comment lines per repository from the count mode, once its collector lives in WizRoom (cleanup wave 3's T2, Infra CW3-T2: WizRoom carries its own collector and publishes without OpenWiz's tools #1776).

Testing Decisions

A good test here checks behaviour from the outside: a diff in, a pass or a named failure out; a tree in, a count out. The seams:

  • The checker's fixtures: each allowed kind passes, each disallowed kind fails with its line, the escape tag passes only with a reason, and the counts match a known tree. Every repository's CI runs the same checker.
  • Each repository's existing tests and CI, which must stay green after its cut: deleting comments changes no behaviour, and any check or test that replaces a comment is red first.
  • The war room's existing collector tests, extended with the count.

Prior art: the owned-paths and privacy checks (diff-scoped CI checks with fixtures), cleanup wave 3's count.sh BEFORE and AFTER counts.

Proof

Claim Evidence
P1 One written list of what stays, with an escape tag that needs a reason The checker's fixtures, red first
P2 Every repository's CI fails a pull request that adds a disallowed comment A red-first test per repository, and one deliberately failing run linked in each pull request
P3 Each repository's comments are cut to the allowed kinds, and nothing that carried meaning is lost BEFORE and AFTER counts per repository; the reviewer's sweep; every check or test that replaced a comment is red first
P4 The cut never touched a must-list file before the cut, a wave 3 file or the frozen copy Each pull request's skip list and the owned-paths check
P5 review-ticket's comment pass finds justification comments Its eval cases, red first
P6 The war room shows comment lines per repository The collector's test, and a screenshot

Out of Scope

  • Markdown and other prose files: they are documents, not comments (cleanup waves cut prose).
  • A whole-repository sweep by review-ticket: its comment pass reads pull request diffs only.
  • The review checkpoints grill (R1 to R3), still open.

Further Notes

  • From the confirmed grill J238, C1 to C3 (2026-11-19 and 2026-11-20; private record linked on this issue), and J237 (checks over prose).
  • Source: Lauren Tan, "All Code Is Slop (Except Mine)" (AI Engineer, 2026-11-14), and pstack's /no-comments (github.com/cursor/plugins, pstack/skills/no-comments/, MIT).
  • WS14 (WizSkills 0.2.0) and its pin stay first.

Sub-issues

Sub-issues

14 of 14 Issues completed
Loading 14 sub-issues

Activity

  1. added this to the Infra milestone on Nov 20, 2026
  2. jparker2006 commented on Nov 20, 2026

    @jparker2006
    MemberAuthor

    Plan graph written, for the agents' approval the J203 way. Approving starts every ticket as soon as its blockers have merged. OpenWiz tickets stay off the 0.1.0 must-list files until the release branch is cut and never touch cleanup wave 3's files; WizSkills tickets merge only after v0.2.0 is tagged.

    flowchart LR
      CC1["#1816 CC1: comments contract and checker, first (M)"]
      CC1 -->|real: the checker| CC2["#1817 CC2: OpenWiz CI check and Rust allow reasons (S)"]
      CC1 -->|real: the allowed kinds| CC3["#1818 CC3: OpenWiz core and command (M)"]
      CC1 -->|real: the allowed kinds| CC4["#1819 CC4: OpenWiz adapters crate (M)"]
      CC3 -->|real: its skip list| CC5["#1820 CC5: OpenWiz everything else, after the cut, AFTER count (M)"]
      CC4 -->|real: its skip list| CC5
      W3["wave 3: #1775 #1777 #1778 #1781 #1782 #1784"] -.->|file: the files wave 3 deletes first| CC5
      CC1 -->|real: the checker| CC6["#1821 CC6: WizSkills (L)"]
      CC1 -->|real: the allowed kinds| CC7["#1822 CC7: review-ticket comment pass (S)"]
      CC1 -->|real: the checker| CC8["#1823 CC8: WizSite (M)"]
      CC1 -->|real: the checker| CC9["#1824 CC9: WizRoom (M)"]
      T2["wave 3: #1776 collector to WizRoom"] -.->|file: tools/collector| CC9
      CC1 -->|real: the count mode| CC10["#1825 CC10: war room comment lines (S)"]
      T2 -->|real: the collector in WizRoom| CC10
      CC1 -->|real: the checker| CC11["#1826 CC11: WizLoops (S)"]
      CC1 -->|real: the checker| CC12["#1827 CC12: private repository's live tools (S)"]
    
    Loading
    Ticket Title Blocked by Labels
    #1816 Infra CC1: the comments contract and its checker, first none held
    #1817 Infra CC2: OpenWiz CI fails new disallowed comments, and every Rust allow states its reason #1816 held
    #1818 Infra CC3: OpenWiz comment cut: the core library and the command #1816 held
    #1819 Infra CC4: OpenWiz comment cut: the adapters crate #1816 held
    #1820 Infra CC5: OpenWiz comment cut: everything else, after the 0.1.0 cut and wave 3, and the AFTER count #1775 #1777 #1778 #1781 #1782 #1784 #1818 #1819 held
    #1821 Infra CC6: WizSkills comment cut and its CI check (0.2.1) #1816 held
    #1822 Infra CC7: review-ticket's comment pass (WizSkills 0.2.1) #1816 held
    #1823 Infra CC8: WizSite comment cut and its CI check #1816 held
    #1824 Infra CC9: WizRoom comment cut and its CI check #1776 #1816 held
    #1825 Infra CC10: the war room tracks comment lines per repository #1776 #1816 held
    #1826 Infra CC11: WizLoops comment cut and its CI check #1816 held
    #1827 Infra CC12: the private repository's live tools: comment cut and its CI check #1816 held

    Longest chain: 2 links (CC1, CC3, CC5). Can start at approval: 1 of 12 (CC1), then 10 at once when it merges.

    File links: CC5 on six cleanup wave 3 tickets, and CC9 on #1776: those tickets delete or move the files first, so cutting their comments earlier would be wasted work and a merge conflict. They keep the two efforts from ever colliding.

    Link check:

    pass spec #1815: tickets 12, links 20, real 13, file 7, unlabelled 0, refusals 0
    file link: #1820 blocked by #1775: tools/war-room/, tools/collector/, .github/workflows/
    file link: #1820 blocked by #1777: ci/, .github/workflows/ci.yml
    file link: #1820 blocked by #1778: tools/test-value/, tools/fleet-load/, tools/open-import/, tools/roadmap/, tools/ci-overload/
    file link: #1820 blocked by #1781: tests/
    file link: #1820 blocked by #1782: tools/install/
    file link: #1820 blocked by #1784: tests/fixtures/
    file link: #1824 blocked by #1776: tools/collector/, .github/workflows/
    
  3. jparker2006 commented on Nov 20, 2026

    @jparker2006
    MemberAuthor

    Plan graph approved by Jake, 2026-11-20, revision 1: Jake settled the comment cut (J238: every repository, only comments that earn their place, a CI check per repository with a reasoned escape tag, and the review pass in WizSkills 0.2.1), and the orchestrator asked for it planned and started the J203 way tonight, behind WizSkills 0.2.0 and its pin, off the 0.1.0 must-list files until the release branch is cut, and never colliding with cleanup wave 3; the plan passed its own checks (links, relies, owned paths).
    Private record: https://github.com/jparker2006/ClosedWiz/issues/3065#issuecomment-7034782715

    Ticket Title Blocked by Label
    #1816 Infra CC1: the comments contract and its checker, first none ready-for-agent
    #1817 Infra CC2: OpenWiz CI fails new disallowed comments, and every Rust allow states its reason #1816 ready-for-agent
    #1818 Infra CC3: OpenWiz comment cut: the core library and the command #1816 ready-for-agent
    #1819 Infra CC4: OpenWiz comment cut: the adapters crate #1816 ready-for-agent
    #1820 Infra CC5: OpenWiz comment cut: everything else, after the 0.1.0 cut and wave 3, and the AFTER count #1775 #1777 #1778 #1781 #1782 #1784 #1818 #1819 ready-for-agent
    #1821 Infra CC6: WizSkills comment cut and its CI check (0.2.1) #1816 ready-for-agent
    #1822 Infra CC7: review-ticket's comment pass (WizSkills 0.2.1) #1816 ready-for-agent
    #1823 Infra CC8: WizSite comment cut and its CI check #1816 ready-for-agent
    #1824 Infra CC9: WizRoom comment cut and its CI check #1776 #1816 ready-for-agent
    #1825 Infra CC10: the war room tracks comment lines per repository #1776 #1816 ready-for-agent
    #1826 Infra CC11: WizLoops comment cut and its CI check #1816 ready-for-agent
    #1827 Infra CC12: the private repository's live tools: comment cut and its CI check #1816 ready-for-agent

    Fingerprint: 326a68beabdef1b246c827cff776a22457cc4c0a7b901f6c1498dd1e5035aebc

    Revision text
    plan-graph revision v2
    spec #1815 body sha256 58e41130dd2475548e0e2930e3d4d7be099945c97742d1764c3a19327f937828
    ticket #1816 blocked-by none body sha256 94872601fc10f3c0a0a07df83e1518ff5a885cd4669c41cc604d66388ff5fa4d title Infra CC1: the comments contract and its checker, first
    ticket #1817 blocked-by #1816 body sha256 0455089f764b7c69d1bba63b915c704953d6a07ce1d4a08b8b56663021e0769c title Infra CC2: OpenWiz CI fails new disallowed comments, and every Rust allow states its reason
    ticket #1818 blocked-by #1816 body sha256 725257917bae08750cf08161cd0ca8d748fa319553a321eb9c53a0b74d41ef0f title Infra CC3: OpenWiz comment cut: the core library and the command
    ticket #1819 blocked-by #1816 body sha256 d656efa895e88f4fcb3b24d504e74c2400f14d6a36afe212e5767dd30172ab77 title Infra CC4: OpenWiz comment cut: the adapters crate
    ticket #1820 blocked-by #1775 #1777 #1778 #1781 #1782 #1784 #1818 #1819 body sha256 ee9f7324ff6786da8cd6ec237b8b6ee0603aa9a05cf6b0bde021d4a8f0e2f522 title Infra CC5: OpenWiz comment cut: everything else, after the 0.1.0 cut and wave 3, and the AFTER count
    ticket #1821 blocked-by #1816 body sha256 09b16d90965056b1a5b5369fc57c1787472f810d714f29ceb38c81e49bc28ec6 title Infra CC6: WizSkills comment cut and its CI check (0.2.1)
    ticket #1822 blocked-by #1816 body sha256 92c1b2130db209389abfecf81d869f610aaa316c81507ca995b6a1fc4ed6dd2f title Infra CC7: review-ticket's comment pass (WizSkills 0.2.1)
    ticket #1823 blocked-by #1816 body sha256 88cc42cd7ca8b8fcd6a7068f00578c92bbfac87e6860d2f135f130a988e35394 title Infra CC8: WizSite comment cut and its CI check
    ticket #1824 blocked-by #1776 #1816 body sha256 a66eee7265d7274ea8dcfb93e05f31e223fc7553abafa4b143f5261c2c4b1622 title Infra CC9: WizRoom comment cut and its CI check
    ticket #1825 blocked-by #1776 #1816 body sha256 c54bb9b8aee5fbac03486b3d368e810e02dff95a1ac87456f7cda46964a55fa0 title Infra CC10: the war room tracks comment lines per repository
    ticket #1826 blocked-by #1816 body sha256 ab7537abe3d3ee6373823c66b5f4a7cbfecc88e37106c63d47e47ec5ef375b42 title Infra CC11: WizLoops comment cut and its CI check
    ticket #1827 blocked-by #1816 body sha256 0e4b78c1763f946ac7138f6212b4db908625496456b253206d8f10af76f3ad0f title Infra CC12: the private repository's live tools: comment cut and its CI check
    
  4. 2 remaining items

  5. jparker2006 commented on Nov 20, 2026

    @jparker2006
    MemberAuthor

    Plan graph approved by Jake, 2026-11-20, revision 3: the planner split CC2 so its CI step and BEFORE count land now while the Rust allow-reason lint waits for cleanup wave 3 to finish trimming the test folders those attributes live in (new CC13), and changed CC7's proof to deterministic tests plus a recorded hand run, because the skills eval it relied on was removed and a paid model run needs Jake's yes. CC2's CI step shares ci.yml with wave 3's #1777 on different lines (the shared-file rule). The plan passed its own checks (links, relies, owned paths).
    Private record: https://github.com/jparker2006/ClosedWiz/issues/3065#issuecomment-7034782715

    Changed since revision 2: CC2 #1817 drops the workspace lint line and the allow fixes (now CC13) and keeps its CI step and BEFORE count; CC7 #1822's proof is deterministic tests on fixture diffs plus the reviewer's recorded hand run, with no model spend, and its owned paths name a real folder; CC13 #1948 added (blocked by #1781, a file link on tests/, and by CC1 #1816, real). The orchestrator can overturn it on ClosedWiz #3065.

    Ticket Title Blocked by Label
    #1816 Infra CC1: the comments contract and its checker, first none ready-for-agent
    #1817 Infra CC2: OpenWiz CI fails new disallowed comments, and every Rust allow states its reason #1816 ready-for-agent
    #1818 Infra CC3: OpenWiz comment cut: the core library and the command #1816 ready-for-agent
    #1819 Infra CC4: OpenWiz comment cut: the adapters crate #1816 ready-for-agent
    #1820 Infra CC5: OpenWiz comment cut: everything else, after the 0.1.0 cut and wave 3, and the AFTER count #1775 #1777 #1778 #1781 #1782 #1784 #1818 #1819 ready-for-agent
    #1821 Infra CC6: WizSkills comment cut and its CI check (0.2.1) #1816 ready-for-agent
    #1822 Infra CC7: review-ticket's comment pass (WizSkills 0.2.1) #1816 ready-for-agent
    #1823 Infra CC8: WizSite comment cut and its CI check #1816 ready-for-agent
    #1824 Infra CC9: WizRoom comment cut and its CI check #1776 #1816 ready-for-agent
    #1825 Infra CC10: the war room tracks comment lines per repository #1776 #1816 ready-for-agent
    #1826 Infra CC11: WizLoops comment cut and its CI check #1816 ready-for-agent
    #1827 Infra CC12: the private repository's live tools: comment cut and its CI check #1816 ready-for-agent
    #1948 Infra CC13: every Rust allow states its reason, enforced in CI (split from CC2) #1781 #1816 ready-for-agent

    Fingerprint: 2d3769e62ac680d4bec8563bc10e81a1cb3b8cdbf6fc8c3099ca883e30c5307f

    Revision text
    plan-graph revision v2
    spec #1815 body sha256 58e41130dd2475548e0e2930e3d4d7be099945c97742d1764c3a19327f937828
    ticket #1816 blocked-by none body sha256 94872601fc10f3c0a0a07df83e1518ff5a885cd4669c41cc604d66388ff5fa4d title Infra CC1: the comments contract and its checker, first
    ticket #1817 blocked-by #1816 body sha256 9736bd7308ab693ce620ecc7f5f4e0eda96d8399f89f8d1011ea17dc8e96dc6b title Infra CC2: OpenWiz CI fails new disallowed comments, and every Rust allow states its reason
    ticket #1818 blocked-by #1816 body sha256 725257917bae08750cf08161cd0ca8d748fa319553a321eb9c53a0b74d41ef0f title Infra CC3: OpenWiz comment cut: the core library and the command
    ticket #1819 blocked-by #1816 body sha256 d656efa895e88f4fcb3b24d504e74c2400f14d6a36afe212e5767dd30172ab77 title Infra CC4: OpenWiz comment cut: the adapters crate
    ticket #1820 blocked-by #1775 #1777 #1778 #1781 #1782 #1784 #1818 #1819 body sha256 e89867b4215d82cb8cc8c1f12182412c0664a7f74669a3f7b465b2092cce4e1d title Infra CC5: OpenWiz comment cut: everything else, after the 0.1.0 cut and wave 3, and the AFTER count
    ticket #1821 blocked-by #1816 body sha256 09b16d90965056b1a5b5369fc57c1787472f810d714f29ceb38c81e49bc28ec6 title Infra CC6: WizSkills comment cut and its CI check (0.2.1)
    ticket #1822 blocked-by #1816 body sha256 ea9cf4172f50ec041082aaba7da4c204a263be95e6997461ad0b8cd3598151f7 title Infra CC7: review-ticket's comment pass (WizSkills 0.2.1)
    ticket #1823 blocked-by #1816 body sha256 88cc42cd7ca8b8fcd6a7068f00578c92bbfac87e6860d2f135f130a988e35394 title Infra CC8: WizSite comment cut and its CI check
    ticket #1824 blocked-by #1776 #1816 body sha256 a66eee7265d7274ea8dcfb93e05f31e223fc7553abafa4b143f5261c2c4b1622 title Infra CC9: WizRoom comment cut and its CI check
    ticket #1825 blocked-by #1776 #1816 body sha256 c54bb9b8aee5fbac03486b3d368e810e02dff95a1ac87456f7cda46964a55fa0 title Infra CC10: the war room tracks comment lines per repository
    ticket #1826 blocked-by #1816 body sha256 ab7537abe3d3ee6373823c66b5f4a7cbfecc88e37106c63d47e47ec5ef375b42 title Infra CC11: WizLoops comment cut and its CI check
    ticket #1827 blocked-by #1816 body sha256 afeb50f6e40efdbcbf44e985101cdb7efca9b6bd7cfc5bd772cc7b1e848eef0e title Infra CC12: the private repository's live tools: comment cut and its CI check
    ticket #1948 blocked-by #1781 #1816 body sha256 7e13e6171bfe21168835e48361942517e293ebd0b6e302c750c509b47ab70545 title Infra CC13: every Rust allow states its reason, enforced in CI (split from CC2)
    
  6. jparker2006 commented on Nov 20, 2026

    @jparker2006
    MemberAuthor

    Plan graph approved by Jake, 2026-11-20, revision 4: the orchestrator ruled that CC7's proof is its eval cases with a capped model run under Jake's standing rule for evals (at most $1 on DeepSeek V4.1 Flash), which replaces revision 3's no-spend proof; and CC14 joins so the comments contract and checker never spell the private repository's name, because WizSite's privacy check refuses CC8's byte-identical copies; CC8 now waits for it. The plan passed its own checks (links, relies, owned paths).
    Private record: https://github.com/jparker2006/ClosedWiz/issues/3065#issuecomment-7034782715

    Changed since revision 3: CC7 #1822's owned paths name skills/review-ticket/evals/ and its proof is the eval cases and the capped run, per the orchestrator's ruling (7044190588); CC14 #1953 added (blocked by CC1 #1816, real); CC8 #1823 gains a real link to CC14. The orchestrator can overturn it on ClosedWiz #3065.

    Ticket Title Blocked by Label
    #1816 Infra CC1: the comments contract and its checker, first none ready-for-agent
    #1817 Infra CC2: OpenWiz CI fails new disallowed comments, and every Rust allow states its reason #1816 ready-for-agent
    #1818 Infra CC3: OpenWiz comment cut: the core library and the command #1816 ready-for-agent
    #1819 Infra CC4: OpenWiz comment cut: the adapters crate #1816 ready-for-agent
    #1820 Infra CC5: OpenWiz comment cut: everything else, after the 0.1.0 cut and wave 3, and the AFTER count #1775 #1777 #1778 #1781 #1782 #1784 #1818 #1819 ready-for-agent
    #1821 Infra CC6: WizSkills comment cut and its CI check (0.2.1) #1816 ready-for-agent
    #1822 Infra CC7: review-ticket's comment pass (WizSkills 0.2.1) #1816 ready-for-agent
    #1823 Infra CC8: WizSite comment cut and its CI check #1816 #1953 ready-for-agent
    #1824 Infra CC9: WizRoom comment cut and its CI check #1776 #1816 ready-for-agent
    #1825 Infra CC10: the war room tracks comment lines per repository #1776 #1816 ready-for-agent
    #1826 Infra CC11: WizLoops comment cut and its CI check #1816 ready-for-agent
    #1827 Infra CC12: the private repository's live tools: comment cut and its CI check #1816 ready-for-agent
    #1948 Infra CC13: every Rust allow states its reason, enforced in CI (split from CC2) #1781 #1816 ready-for-agent
    #1953 Infra CC14: the comments contract and checker never spell the private repository name #1816 ready-for-agent

    Fingerprint: 7913be70b8bada69f3e14330f2e74b154cb206d1942b4c9c1234939192ca6592

    Revision text
    plan-graph revision v2
    spec #1815 body sha256 58e41130dd2475548e0e2930e3d4d7be099945c97742d1764c3a19327f937828
    ticket #1816 blocked-by none body sha256 94872601fc10f3c0a0a07df83e1518ff5a885cd4669c41cc604d66388ff5fa4d title Infra CC1: the comments contract and its checker, first
    ticket #1817 blocked-by #1816 body sha256 9736bd7308ab693ce620ecc7f5f4e0eda96d8399f89f8d1011ea17dc8e96dc6b title Infra CC2: OpenWiz CI fails new disallowed comments, and every Rust allow states its reason
    ticket #1818 blocked-by #1816 body sha256 725257917bae08750cf08161cd0ca8d748fa319553a321eb9c53a0b74d41ef0f title Infra CC3: OpenWiz comment cut: the core library and the command
    ticket #1819 blocked-by #1816 body sha256 d656efa895e88f4fcb3b24d504e74c2400f14d6a36afe212e5767dd30172ab77 title Infra CC4: OpenWiz comment cut: the adapters crate
    ticket #1820 blocked-by #1775 #1777 #1778 #1781 #1782 #1784 #1818 #1819 body sha256 e89867b4215d82cb8cc8c1f12182412c0664a7f74669a3f7b465b2092cce4e1d title Infra CC5: OpenWiz comment cut: everything else, after the 0.1.0 cut and wave 3, and the AFTER count
    ticket #1821 blocked-by #1816 body sha256 09b16d90965056b1a5b5369fc57c1787472f810d714f29ceb38c81e49bc28ec6 title Infra CC6: WizSkills comment cut and its CI check (0.2.1)
    ticket #1822 blocked-by #1816 body sha256 f3bf7422c24f9e3e1c5c070733a56b77b45b0839b54648a2e47f70e5d4338f2f title Infra CC7: review-ticket's comment pass (WizSkills 0.2.1)
    ticket #1823 blocked-by #1816 #1953 body sha256 b0c324518d5b55e6a093d68b5e03ab32f71a07476975e7a284be4ec9280ddcfe title Infra CC8: WizSite comment cut and its CI check
    ticket #1824 blocked-by #1776 #1816 body sha256 a66eee7265d7274ea8dcfb93e05f31e223fc7553abafa4b143f5261c2c4b1622 title Infra CC9: WizRoom comment cut and its CI check
    ticket #1825 blocked-by #1776 #1816 body sha256 c54bb9b8aee5fbac03486b3d368e810e02dff95a1ac87456f7cda46964a55fa0 title Infra CC10: the war room tracks comment lines per repository
    ticket #1826 blocked-by #1816 body sha256 ab7537abe3d3ee6373823c66b5f4a7cbfecc88e37106c63d47e47ec5ef375b42 title Infra CC11: WizLoops comment cut and its CI check
    ticket #1827 blocked-by #1816 body sha256 afeb50f6e40efdbcbf44e985101cdb7efca9b6bd7cfc5bd772cc7b1e848eef0e title Infra CC12: the private repository's live tools: comment cut and its CI check
    ticket #1948 blocked-by #1781 #1816 body sha256 7e13e6171bfe21168835e48361942517e293ebd0b6e302c750c509b47ab70545 title Infra CC13: every Rust allow states its reason, enforced in CI (split from CC2)
    ticket #1953 blocked-by #1816 body sha256 ca7396b181c3d3821a70dcf8d5a55b5e415e2fd04e9eb3a78f1eb6b2d75fb4d2 title Infra CC14: the comments contract and checker never spell the private repository name
    
  7. jparker2006 commented on Nov 20, 2026

    @jparker2006
    MemberAuthor

    Plan graph approved by Jake, 2026-11-20, revision 5: CC14 also fixes the checker's misreading of shell lines that nest double quotes inside a command substitution, since it already changes the checker every repository copies and has not started; and CC9, CC10 and CC11 name real folders in their owned paths instead of only a repository name, so the fleet's claim gate can read them. Same tickets, same arrows. The plan passed its own checks (links, relies, owned paths).
    Private record: https://github.com/jparker2006/ClosedWiz/issues/3065#issuecomment-7034782715

    Changed since revision 4: CC14 #1953 adds the nested-quote fix with its fixture and acceptance; CC9 #1824, CC10 #1825 and CC11 #1826 owned-path bullets now backtick real paths (tools/, tools/collector/, tools/war-room/charts/, adapters/ and the like). The orchestrator can overturn it on ClosedWiz #3065.

    Ticket Title Blocked by Label
    #1816 Infra CC1: the comments contract and its checker, first none ready-for-agent
    #1817 Infra CC2: OpenWiz CI fails new disallowed comments, and every Rust allow states its reason #1816 ready-for-agent
    #1818 Infra CC3: OpenWiz comment cut: the core library and the command #1816 ready-for-agent
    #1819 Infra CC4: OpenWiz comment cut: the adapters crate #1816 ready-for-agent
    #1820 Infra CC5: OpenWiz comment cut: everything else, after the 0.1.0 cut and wave 3, and the AFTER count #1775 #1777 #1778 #1781 #1782 #1784 #1818 #1819 ready-for-agent
    #1821 Infra CC6: WizSkills comment cut and its CI check (0.2.1) #1816 ready-for-agent
    #1822 Infra CC7: review-ticket's comment pass (WizSkills 0.2.1) #1816 ready-for-agent
    #1823 Infra CC8: WizSite comment cut and its CI check #1816 #1953 ready-for-agent
    #1824 Infra CC9: WizRoom comment cut and its CI check #1776 #1816 ready-for-agent
    #1825 Infra CC10: the war room tracks comment lines per repository #1776 #1816 ready-for-agent
    #1826 Infra CC11: WizLoops comment cut and its CI check #1816 ready-for-agent
    #1827 Infra CC12: the private repository's live tools: comment cut and its CI check #1816 ready-for-agent
    #1948 Infra CC13: every Rust allow states its reason, enforced in CI (split from CC2) #1781 #1816 ready-for-agent
    #1953 Infra CC14: the comments contract and checker never spell the private repository name #1816 ready-for-agent

    Fingerprint: 548f694911e84456bdfdfeb5f0bc1918245ba2d0ed36aed3bdcd1a70d5e2e286

    Revision text
    plan-graph revision v2
    spec #1815 body sha256 58e41130dd2475548e0e2930e3d4d7be099945c97742d1764c3a19327f937828
    ticket #1816 blocked-by none body sha256 94872601fc10f3c0a0a07df83e1518ff5a885cd4669c41cc604d66388ff5fa4d title Infra CC1: the comments contract and its checker, first
    ticket #1817 blocked-by #1816 body sha256 9736bd7308ab693ce620ecc7f5f4e0eda96d8399f89f8d1011ea17dc8e96dc6b title Infra CC2: OpenWiz CI fails new disallowed comments, and every Rust allow states its reason
    ticket #1818 blocked-by #1816 body sha256 725257917bae08750cf08161cd0ca8d748fa319553a321eb9c53a0b74d41ef0f title Infra CC3: OpenWiz comment cut: the core library and the command
    ticket #1819 blocked-by #1816 body sha256 d656efa895e88f4fcb3b24d504e74c2400f14d6a36afe212e5767dd30172ab77 title Infra CC4: OpenWiz comment cut: the adapters crate
    ticket #1820 blocked-by #1775 #1777 #1778 #1781 #1782 #1784 #1818 #1819 body sha256 e89867b4215d82cb8cc8c1f12182412c0664a7f74669a3f7b465b2092cce4e1d title Infra CC5: OpenWiz comment cut: everything else, after the 0.1.0 cut and wave 3, and the AFTER count
    ticket #1821 blocked-by #1816 body sha256 09b16d90965056b1a5b5369fc57c1787472f810d714f29ceb38c81e49bc28ec6 title Infra CC6: WizSkills comment cut and its CI check (0.2.1)
    ticket #1822 blocked-by #1816 body sha256 f3bf7422c24f9e3e1c5c070733a56b77b45b0839b54648a2e47f70e5d4338f2f title Infra CC7: review-ticket's comment pass (WizSkills 0.2.1)
    ticket #1823 blocked-by #1816 #1953 body sha256 b0c324518d5b55e6a093d68b5e03ab32f71a07476975e7a284be4ec9280ddcfe title Infra CC8: WizSite comment cut and its CI check
    ticket #1824 blocked-by #1776 #1816 body sha256 39fb6190f355292542edbfe94f95c1330b59d0116afb3a5bf235378b1c55139d title Infra CC9: WizRoom comment cut and its CI check
    ticket #1825 blocked-by #1776 #1816 body sha256 9e871774cef7f9e4ad8f59fe75f3d2bed92da0ff4da9c6efca4d94e179c2f3c0 title Infra CC10: the war room tracks comment lines per repository
    ticket #1826 blocked-by #1816 body sha256 289c701dccc03c3798a57650bb44e3bf2baf2f779a4762212539d7a09f22587f title Infra CC11: WizLoops comment cut and its CI check
    ticket #1827 blocked-by #1816 body sha256 afeb50f6e40efdbcbf44e985101cdb7efca9b6bd7cfc5bd772cc7b1e848eef0e title Infra CC12: the private repository's live tools: comment cut and its CI check
    ticket #1948 blocked-by #1781 #1816 body sha256 7e13e6171bfe21168835e48361942517e293ebd0b6e302c750c509b47ab70545 title Infra CC13: every Rust allow states its reason, enforced in CI (split from CC2)
    ticket #1953 blocked-by #1816 body sha256 390a6d197de4e4a32f9475f9959d0441d346e54476b606f562de534a949e9f28 title Infra CC14: the comments contract and checker never spell the private repository name
    
  8. jparker2006 commented on Nov 20, 2026

    @jparker2006
    MemberAuthor

    launch-fleet: needs approval: changed since revision 4 (fingerprint now 548f694911e8)

    Needs you: the bodies of #1824 (CC9), #1825 (CC10), #1826 (CC11) and #1953 (CC14) were edited after revision 4 (7044422117); titles and blockers are unchanged. Nothing new under this spec starts until a new revision approves the plan, so CC14 #1953 waits even though CC1 #1816 has merged. Tickets already being built keep going.

  9. jparker2006 commented on Nov 20, 2026

    @jparker2006
    MemberAuthor

    Plan graph approved by Jake, 2026-11-20, revision 6: CC10 owns the war room folder, shared with CC9, because its builder showed the new chart also needs wiring lines in the gather, publish and benchmarks files beside the charts folder. Same tickets, same arrows. The plan passed its own checks (links, relies, owned paths).
    Private record: https://github.com/jparker2006/ClosedWiz/issues/3065#issuecomment-7034782715

    Changed since revision 5: CC10 #1825's second owned-path bullet names tools/war-room/ in WizRoom instead of only its charts folder, for its chart and those wiring lines only. The orchestrator can overturn it on ClosedWiz #3065.

    Ticket Title Blocked by Label
    #1816 Infra CC1: the comments contract and its checker, first none ready-for-agent
    #1817 Infra CC2: OpenWiz CI fails new disallowed comments, and every Rust allow states its reason #1816 ready-for-agent
    #1818 Infra CC3: OpenWiz comment cut: the core library and the command #1816 ready-for-agent
    #1819 Infra CC4: OpenWiz comment cut: the adapters crate #1816 ready-for-agent
    #1820 Infra CC5: OpenWiz comment cut: everything else, after the 0.1.0 cut and wave 3, and the AFTER count #1775 #1777 #1778 #1781 #1782 #1784 #1818 #1819 ready-for-agent
    #1821 Infra CC6: WizSkills comment cut and its CI check (0.2.1) #1816 ready-for-agent
    #1822 Infra CC7: review-ticket's comment pass (WizSkills 0.2.1) #1816 ready-for-agent
    #1823 Infra CC8: WizSite comment cut and its CI check #1816 #1953 ready-for-agent
    #1824 Infra CC9: WizRoom comment cut and its CI check #1776 #1816 ready-for-agent
    #1825 Infra CC10: the war room tracks comment lines per repository #1776 #1816 ready-for-agent
    #1826 Infra CC11: WizLoops comment cut and its CI check #1816 ready-for-agent
    #1827 Infra CC12: the private repository's live tools: comment cut and its CI check #1816 ready-for-agent
    #1948 Infra CC13: every Rust allow states its reason, enforced in CI (split from CC2) #1781 #1816 ready-for-agent
    #1953 Infra CC14: the comments contract and checker never spell the private repository name #1816 ready-for-agent

    Fingerprint: 981396394127169be3a95e2cec2e5ed538acfed1d1ae263c50d770a0b3057e31

    Revision text
    plan-graph revision v2
    spec #1815 body sha256 58e41130dd2475548e0e2930e3d4d7be099945c97742d1764c3a19327f937828
    ticket #1816 blocked-by none body sha256 94872601fc10f3c0a0a07df83e1518ff5a885cd4669c41cc604d66388ff5fa4d title Infra CC1: the comments contract and its checker, first
    ticket #1817 blocked-by #1816 body sha256 9736bd7308ab693ce620ecc7f5f4e0eda96d8399f89f8d1011ea17dc8e96dc6b title Infra CC2: OpenWiz CI fails new disallowed comments, and every Rust allow states its reason
    ticket #1818 blocked-by #1816 body sha256 725257917bae08750cf08161cd0ca8d748fa319553a321eb9c53a0b74d41ef0f title Infra CC3: OpenWiz comment cut: the core library and the command
    ticket #1819 blocked-by #1816 body sha256 d656efa895e88f4fcb3b24d504e74c2400f14d6a36afe212e5767dd30172ab77 title Infra CC4: OpenWiz comment cut: the adapters crate
    ticket #1820 blocked-by #1775 #1777 #1778 #1781 #1782 #1784 #1818 #1819 body sha256 e89867b4215d82cb8cc8c1f12182412c0664a7f74669a3f7b465b2092cce4e1d title Infra CC5: OpenWiz comment cut: everything else, after the 0.1.0 cut and wave 3, and the AFTER count
    ticket #1821 blocked-by #1816 body sha256 09b16d90965056b1a5b5369fc57c1787472f810d714f29ceb38c81e49bc28ec6 title Infra CC6: WizSkills comment cut and its CI check (0.2.1)
    ticket #1822 blocked-by #1816 body sha256 f3bf7422c24f9e3e1c5c070733a56b77b45b0839b54648a2e47f70e5d4338f2f title Infra CC7: review-ticket's comment pass (WizSkills 0.2.1)
    ticket #1823 blocked-by #1816 #1953 body sha256 b0c324518d5b55e6a093d68b5e03ab32f71a07476975e7a284be4ec9280ddcfe title Infra CC8: WizSite comment cut and its CI check
    ticket #1824 blocked-by #1776 #1816 body sha256 39fb6190f355292542edbfe94f95c1330b59d0116afb3a5bf235378b1c55139d title Infra CC9: WizRoom comment cut and its CI check
    ticket #1825 blocked-by #1776 #1816 body sha256 748e67fac57cbde18bdaeebcc6325d3f380aa63a646a07e89ba281404a33d01b title Infra CC10: the war room tracks comment lines per repository
    ticket #1826 blocked-by #1816 body sha256 289c701dccc03c3798a57650bb44e3bf2baf2f779a4762212539d7a09f22587f title Infra CC11: WizLoops comment cut and its CI check
    ticket #1827 blocked-by #1816 body sha256 afeb50f6e40efdbcbf44e985101cdb7efca9b6bd7cfc5bd772cc7b1e848eef0e title Infra CC12: the private repository's live tools: comment cut and its CI check
    ticket #1948 blocked-by #1781 #1816 body sha256 7e13e6171bfe21168835e48361942517e293ebd0b6e302c750c509b47ab70545 title Infra CC13: every Rust allow states its reason, enforced in CI (split from CC2)
    ticket #1953 blocked-by #1816 body sha256 390a6d197de4e4a32f9475f9959d0441d346e54476b606f562de534a949e9f28 title Infra CC14: the comments contract and checker never spell the private repository name
    
  10. jparker2006 commented on Nov 20, 2026

    @jparker2006
    MemberAuthor

    Plan graph approved by Jake, 2026-11-20, revision 7: CC7 goes back to its revision 3 proof, deterministic tests on fixture diffs with no paid model run, because the orchestrator's decisions of 8:35 AM PST keep that answer in place of its earlier one-dollar allowance. Same tickets, same arrows. The plan passed its own checks (links, relies, owned paths).
    Private record: https://github.com/jparker2006/ClosedWiz/issues/3065#issuecomment-7044861664

    Changed since revision 6: CC7 #1822's body is restored byte for byte to revision 3's. It owns skills/review-ticket/scripts/ for the pass's helper and its tests instead of skills/review-ticket/evals/, and its proof is the red-first deterministic tests plus the reviewer's recorded hand run. The orchestrator can overturn it on ClosedWiz #3065.

    Ticket Title Blocked by Label
    #1816 Infra CC1: the comments contract and its checker, first none ready-for-agent
    #1817 Infra CC2: OpenWiz CI fails new disallowed comments, and every Rust allow states its reason #1816 ready-for-agent
    #1818 Infra CC3: OpenWiz comment cut: the core library and the command #1816 ready-for-agent
    #1819 Infra CC4: OpenWiz comment cut: the adapters crate #1816 ready-for-agent
    #1820 Infra CC5: OpenWiz comment cut: everything else, after the 0.1.0 cut and wave 3, and the AFTER count #1775 #1777 #1778 #1781 #1782 #1784 #1818 #1819 ready-for-agent
    #1821 Infra CC6: WizSkills comment cut and its CI check (0.2.1) #1816 ready-for-agent
    #1822 Infra CC7: review-ticket's comment pass (WizSkills 0.2.1) #1816 ready-for-agent
    #1823 Infra CC8: WizSite comment cut and its CI check #1816 #1953 ready-for-agent
    #1824 Infra CC9: WizRoom comment cut and its CI check #1776 #1816 ready-for-agent
    #1825 Infra CC10: the war room tracks comment lines per repository #1776 #1816 ready-for-agent
    #1826 Infra CC11: WizLoops comment cut and its CI check #1816 ready-for-agent
    #1827 Infra CC12: the private repository's live tools: comment cut and its CI check #1816 ready-for-agent
    #1948 Infra CC13: every Rust allow states its reason, enforced in CI (split from CC2) #1781 #1816 ready-for-agent
    #1953 Infra CC14: the comments contract and checker never spell the private repository name #1816 ready-for-agent

    Fingerprint: 2bcfad9a4670eb6892054d79665225684cb5afbed4402fd6bbd0ae196a66325c

    Revision text
    plan-graph revision v2
    spec #1815 body sha256 58e41130dd2475548e0e2930e3d4d7be099945c97742d1764c3a19327f937828
    ticket #1816 blocked-by none body sha256 94872601fc10f3c0a0a07df83e1518ff5a885cd4669c41cc604d66388ff5fa4d title Infra CC1: the comments contract and its checker, first
    ticket #1817 blocked-by #1816 body sha256 9736bd7308ab693ce620ecc7f5f4e0eda96d8399f89f8d1011ea17dc8e96dc6b title Infra CC2: OpenWiz CI fails new disallowed comments, and every Rust allow states its reason
    ticket #1818 blocked-by #1816 body sha256 725257917bae08750cf08161cd0ca8d748fa319553a321eb9c53a0b74d41ef0f title Infra CC3: OpenWiz comment cut: the core library and the command
    ticket #1819 blocked-by #1816 body sha256 d656efa895e88f4fcb3b24d504e74c2400f14d6a36afe212e5767dd30172ab77 title Infra CC4: OpenWiz comment cut: the adapters crate
    ticket #1820 blocked-by #1775 #1777 #1778 #1781 #1782 #1784 #1818 #1819 body sha256 e89867b4215d82cb8cc8c1f12182412c0664a7f74669a3f7b465b2092cce4e1d title Infra CC5: OpenWiz comment cut: everything else, after the 0.1.0 cut and wave 3, and the AFTER count
    ticket #1821 blocked-by #1816 body sha256 09b16d90965056b1a5b5369fc57c1787472f810d714f29ceb38c81e49bc28ec6 title Infra CC6: WizSkills comment cut and its CI check (0.2.1)
    ticket #1822 blocked-by #1816 body sha256 ea9cf4172f50ec041082aaba7da4c204a263be95e6997461ad0b8cd3598151f7 title Infra CC7: review-ticket's comment pass (WizSkills 0.2.1)
    ticket #1823 blocked-by #1816 #1953 body sha256 b0c324518d5b55e6a093d68b5e03ab32f71a07476975e7a284be4ec9280ddcfe title Infra CC8: WizSite comment cut and its CI check
    ticket #1824 blocked-by #1776 #1816 body sha256 39fb6190f355292542edbfe94f95c1330b59d0116afb3a5bf235378b1c55139d title Infra CC9: WizRoom comment cut and its CI check
    ticket #1825 blocked-by #1776 #1816 body sha256 748e67fac57cbde18bdaeebcc6325d3f380aa63a646a07e89ba281404a33d01b title Infra CC10: the war room tracks comment lines per repository
    ticket #1826 blocked-by #1816 body sha256 289c701dccc03c3798a57650bb44e3bf2baf2f779a4762212539d7a09f22587f title Infra CC11: WizLoops comment cut and its CI check
    ticket #1827 blocked-by #1816 body sha256 afeb50f6e40efdbcbf44e985101cdb7efca9b6bd7cfc5bd772cc7b1e848eef0e title Infra CC12: the private repository's live tools: comment cut and its CI check
    ticket #1948 blocked-by #1781 #1816 body sha256 7e13e6171bfe21168835e48361942517e293ebd0b6e302c750c509b47ab70545 title Infra CC13: every Rust allow states its reason, enforced in CI (split from CC2)
    ticket #1953 blocked-by #1816 body sha256 390a6d197de4e4a32f9475f9959d0441d346e54476b606f562de534a949e9f28 title Infra CC14: the comments contract and checker never spell the private repository name
    
  11. jparker2006 commented on Nov 20, 2026

    @jparker2006
    MemberAuthor

    launch-fleet: CC14 merged; carried copies re-sync

    CC14 #1953 merged at 17:43:17Z (PR #1959, fffe9a4). Under the carried-copy rule, the builders of CC8 #1823, CC9 #1824, CC10 #1825, CC11 #1826 and CC12 #1827 were told to re-sync their copies byte for byte to that version and hand back a new green head; each PR's same reviewer re-checks only the re-sync diff, then it merges by the cross-repo route. CC2 #1817's builder was told to merge main in for R1 of PR #1955. CC13 #1948 still waits on #1781. Hand check under the J87 planner's ruling on #1958.

  12. jparker2006 commented on Nov 21, 2026

    @jparker2006
    MemberAuthor

    launch-fleet: comment-cut counts (CC5 merged)

    CC5 #1820 merged at 02:05:49Z on 2026-11-21 (PR #2062, head f32969a, merge 0662a11). These are the counts for every merged #1815 ticket. Comment lines are BEFORE -> AFTER, from the checker's count mode.

    Ticket PR Area Comment lines Disallowed
    CC1 #1816 #1842 contract and checker no cut -
    CC2 #1817 #1955 CI step no cut (whole repo 13,224 before) -
    CC3 #1818 #1949 crates/core/src, crates/cli 3,313 -> 19 3,306 -> 0
    CC4 #1819 #1946 crates/adapters 1,842 -> 14 1,834 -> 0
    CC5 #1820 #2062 everything outside crates/ 6,521 -> 29 -> 0
    CC7 #1822 openwizdev/WizSkills#208 review comment pass no cut -
    CC9 #1824 openwizdev/WizRoom#32 WizRoom 2,753 -> 28 -> 0
    CC10 #1825 openwizdev/WizRoom#33 war-room chart no cut -
    CC11 #1826 openwizdev/WizLoops#32 cut area 241 -> 0 (whole repo 255 -> 14, all excluded fixtures) 241 -> 0
    CC12 #1827 private repository live tools 291 -> 11 291 -> 0
    CC13 #1948 #2049 reasonless allows 34 -> 0 allows (touched .rs comment lines 631 -> 591) -
    CC14 #1953 #1959 checker fix no change (13,224 before = after) -

    Total for the cuts: 14,961 -> 101 comment lines.

    Still open: CC6 #1821 (openwizdev/WizSkills#226, CI running) and CC8 #1823 (openwizdev/WizSite#117, approved, merges right after RL2 openwizdev/WizSite#46).

  13. jparker2006 commented on Nov 21, 2026

    @jparker2006
    MemberAuthor

    launch-fleet: comment-cut counts, update (CC6 merged)

    CC6 #1821 merged at 02:50:25Z on 2026-11-21 (openwizdev/WizSkills#226, head d9191f6, merge ecdd3e4): WizSkills, in the cut files, 3,171 -> 4 comment lines, 0 disallowed after. Files changed by open WizSkills pull requests at its start and #1806's files were skipped and listed for a follow-up.

    Total for the merged cuts now: 18,132 -> 105 comment lines. Still open: CC8 #1823 (openwizdev/WizSite#117, approved; it merges right after RL2 openwizdev/WizSite#46).

  14. jparker2006 commented on Nov 21, 2026

    @jparker2006
    MemberAuthor

    launch-fleet: counts update: CC8 #1823 merged

    openwizdev/WizSite#117 merged at ec32f93 (merge ba3d5ca). WizSite comment lines: 969 -> 6 from the original base (RL2's files 414 -> 5); 0 disallowed. The 6 kept lines are allowed kinds (privacy warnings and build markers). All tickets of this spec, CC1 to CC14, are now closed.

  15. jparker2006 commented on Nov 21, 2026

    @jparker2006
    MemberAuthor

    launch-fleet: spec summary

    All 14 tickets of #1815 are closed: CC1 to CC14 (#1816 to #1827, #1948, #1953). The last merge was CC8, openwizdev/WizSite#117 at ec32f93 (merge ba3d5ca, 2026-11-21T20:26:26Z). The counts are in the table comments above (7055935622, 7056225657, 7068760114). CC12 merged in the private repository and is checked by hand (record 7047750753 on #1827). Follow-up #2075, the files CC5 skipped for open work, stays open and ready-for-agent outside this spec.

    Closed by hand under the J87 planner's instruction (2026-11-21), as with #1356, because fleet.sh can't verify #1827's private merge.

  16. jparker2006 commented on Nov 21, 2026

    @jparker2006
    MemberAuthor

    launch-fleet: fleet done #1815

    The spec's loop is deleted, and its fleet has ended. Follow-up #2075 is handed to the planner.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions