ui: clarify governance truth, blockers, evidence, and next actions - #636
ndrorchestration wants to merge 41 commits into
Conversation
|
Deployment failed for project dynamicgovernanceagenticformation with the following error: Learn More: https://vercel.com/ndrorchestration?upgradeToPro=build-rate-limit |
|
Validation checkpoint for exact head
Merge decision: HOLD. Although repository CI is fully green and the Vercel failure is infrastructure/quota rather than a code/build defect, the standing policy is not to reinterpret a failed check as success. No merge performed. The PR remains presentation-only and preserves |
|
Deployment failed for project dynamicgovernanceagenticformation with the following error: Learn More: https://vercel.com/ndrorchestration?upgradeToPro=build-rate-limit |
|
The latest updates on your projects. Learn more about Vercel for GitHub.
|
|
Current-candidate checkpoint after #639 integration:
Vercel evidenceVercel has recovered enough capacity to produce READY preview deployment Exact-head CIThe fresh Decision remains HOLD. Do not merge until the exact current head completes the required validation wave and no newer main invalidates it. Governance/scientific state remains |
Consolidate the validated Agents & Formations and Evidence & Research refinements into the #636 UI branch. Presentation-only; accepted-main governance state is unchanged.
|
Current-state reconciliation — 2026-09-11 This draft UI branch remains useful presentation work, but its embedded scientific frontier is now historical. Accepted signed/verified Do not merge #636 in its present form. Its
Active maintenance #657 is sequencing-held on exact head No presentation branch state is authority for scientific acceptance. |
Purpose
Preserve the presentation-only Governance Command Center refinement: repository truth beacon, reusable Decision Frontier, Evidence → Verification → Authority → Permission grammar, explicit NOT AUTHORIZED treatment, operator handoff, formation-first roster presentation, evidence lineage, and responsive/accessibility work.
Current disposition — 2026-09-15
DRAFT / HOLD / STALE-LINEAGE / UNIQUE UI WORK. DO NOT MERGE AS-IS.
Current protected
mainis1fb2c665587d5a0e7b213aef1cc5c870097cdc9b. #692 is accepted and the current Track A frontier is collection COMPLETE with operator retained-byte provenance PENDING, dataset lock NOT ESTABLISHED, unblinding NOT AUTHORIZED, primary analysis NOT AUTHORIZED / NOT RUN, efficacy NOT_ESTABLISHED, and High-Assurance PRE-FREEZE / FAIL-CLOSED / NOT AUTHORIZED / N=0.This branch still contains unique presentation work, but its embedded governance constants/handoff text predate the accepted collection and current retained-byte frontier. Historical validation cannot transfer.
Because the current dataset-lock evidence preparer binds its evidence to exact executing repository
HEAD, do not reconcile or merge this UI lane before the #679 operator-local retained-byte checkpoint. Movingmainfirst would create avoidable checkpoint lineage churn without adding evidence.Future reconciliation
After the controlling retained-byte/evidence-admission sequence reaches a stable accepted boundary:
main;Draft #649 remains stacked on this historical branch and must not merge independently.
Governance boundary
No backend authority, scientific state, collection status, dataset lock, unblinding, primary-analysis authority, efficacy, High-Assurance status, or scientific-N increment is changed by this PR.