Skip to content

Generate AI context outside the repository through basectl #2687

Open

Description

@codeforester

Problem

The accepted Base governance design and implementation plan identify package 13b as a required deliverable. This issue translates that package into a reviewed, bounded issue/PR train; it does not authorize implementation before the issue reaches Ready.

Expected behavior

Implement the reviewed basectl export-context contract by invoking a user-selected installed AI CLI to summarize canonical repository documents and write the generated artifact to an export location outside the repo. Do not add a maintained .ai-context/ source tree or remove existing tracked context in this issue.

Scope and non-goals

Scope: Implement the reviewed basectl export-context contract by invoking a user-selected installed AI CLI to summarize canonical repository documents and write the generated artifact to an export location outside the repo. Do not add a maintained .ai-context/ source tree or remove existing tracked context in this issue.

Non-goals: Do not silently expand scope, activate unreviewed policy, mirror issue fields onto PRs, grant agents merge/release authority, or make changes outside the named affected areas. Any new product decision or materially new work gets a separate issue and decision record.

Affected areas

Impact and evidence

  1. Product intent: Implements only the accepted governance design and plan; any product-requirement change must be filed separately.
  2. Architecture and contracts: Destination is the package-specific section of the merged governance design/implementation plan plus the affected canonical contract named above.
  3. User guidance: The issue identifies likely guidance paths; the implementation PR must name updated user/FAQ/README paths or give a change-specific reason why none is affected.
  4. CLI/API and reference: The affected-area list determines whether CLI/API/reference docs change; the implementation PR must cite the exact reference path or justify no impact.
  5. Operations and safety: No privileged automation or merge authority is implied; the PR must list operational/security effects and any rollback.
  6. Validation and testing: The issue lists the planned tests; the PR must report executed validation and explain any unavailable test.
  7. Examples and downstream use: The implementation PR must identify affected examples/consumers or give evidence that this change has no downstream surface.
  8. Governance and contributor process: This package changes or preserves the contributor/governance contract as described in Scope; links must point to the canonical rules.
  9. Decision records: No new decision is accepted by this issue; any durable deviation requires a proposed decision record and explicit maintainer acceptance.
  10. Release notes: The PR must include a user-facing release-note line or a reasoned none; this issue does not pre-decide that disposition.

These are issue-stage dispositions to refine during Triage. Before Ready, every category must have its exact destination or evidence-based no-impact reason; the PR repeats the ten-category evidence for actual changes.

Open questions

  • None known. If implementation exposes an unresolved contract, return this issue to Triage and record the decision before implementation continues.

Plan

  • S1: One focused PR for this issue. Use Fixes #N only if no additional slice is needed; if the maintainer approves multiple PRs, name each S1…Sn here before the first is opened and use Part of #N.
  • Dependencies: the P13a issue
  • Acceptance criteria:
  • The command invokes only a selected, supported installed CLI using a noninteractive, bounded invocation.
  • Output is written outside the repository, is attributable to source paths/revision/date and never overwrites tracked files.
  • Provider absence, nonzero exit, timeout, cancellation and partial output fail clearly and leave no misleading success artifact.
  • Privacy notice, redaction and prompt-injection boundaries match package 13a; no secrets are passed by Base.
  • CLI help/reference and tests document output and cleanup behavior.
  • Validation:
  • Use fake CLI executables to test provider selection, arguments, timeouts, output path, errors and secret redaction.
  • Verify repository status stays unchanged and exported artifact records source provenance.
  • Run focused CLI tests and security fixtures.
  • Risks and rollback: A provider may transmit repository content externally; require explicit selection/consent, disclose source data, and keep export outside the repo. Disable the command if privacy or output guarantees fail.
  • Decision impact: No decision is accepted merely by implementing the issue. Record the relevant accepted decision/ADR and file a superseding record if the maintainer approves a change.

Activity

  1. self-assigned this
    on Nov 10, 2026
  2. added this to the v1.11.0 milestone on Nov 11, 2026
  3. codeforester commented on Nov 11, 2026

    @codeforester
    CollaboratorAuthor

    Pre-Triage review against the accepted plan (#2664, tracker #2665)

    1. Cross-repo links. base-cli#509 and base-demo#374 name this issue as their prerequisite only in text. Add native blocked-by links (Remove tracked AI context files from the Base repository after replacement release #2688 already has one).
    2. Release boundary. The cleanup issues need this command released and proven, so they can't close in the same release.

    Dependencies text. Replace the P13a issue with #2686. The native blocked-by links are already correct; the body is what a reviewer reads.

    Contract text. The Impact, Scope and Open questions sections are still the shared template text. The Impact section is identical in 24 of #2666–#2690, and Scope repeats Expected behavior. That's fine in Backlog. Before Ready, replace each with this issue's own dispositions.

    Claude Code (Opus 5.5), reviewing from Ramesh's account at his request. This review comes before Triage, so it is not an issue-loop round.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

Labels

enhancementNew feature or product improvement

Type

Projects

  • Status
    Backlog

Milestone

Relationships

None yet

Development

No branches or pull requests

Issue actions