Repository navigation
docs(planning): PR 27 record follow-ups (roadmap, state, audit, closeout) - #30
Merged
Merged
Conversation
…ase IDs, and closeout records ROADMAP keeps a status pointer, the shipped list and the progress table; v3 phase detail lives in milestones/v3-ROADMAP.md. STATE resume lines reflect PR 27 merged (0ca794d). The audit quotes phase IDs and records the mention-based traceability method, as accepted by the owner. The closeout records the ten waived files and the method.
Approved by human:SomeRandmGuyy. Records corrections to the merged closeout receipt and the command outputs from the committed tree.
SomeRandmGuyy
marked this pull request as ready for review
November 1, 2026 20:00
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Owner-approved follow-up to PR 27 (2026-11-01). ROADMAP collapses the archived v3 phase detail to a pointer and keeps the progress table. STATE resume lines reflect PR 27 merged. The audit quotes phase IDs and records the mention-based traceability method. The closeout records the ten waived files and the method. The follow-up receipt records corrections to the merged closeout receipt (files_changed, claim 3, unverified item 0) without rewriting it. Checks: G-1 diff mode passes; tests/docs 44 passed; check.sh ok; LIV-01 probe shows the adapter absent in three roots. Receipt approved by human:SomeRandmGuyy.


Confidence Score: 5/5 
This documentation-only follow-up appears safe to merge.Summary
Updates the v3 planning records after PR 27 merged.
Acknowledged by
SomeRandmGuyy: archive consolidation, mention-based scoring, and keeping the approved receipt unchanged are intentional. Owner review or re-homing of the ten waived files and pushing the local tag remain deferred.No new actionable issues found. Repository scripts and tests were not run during this review.
Reviews (1) · Last reviewed commit: "chore(receipts): bot-00 receipt for the ..." · Reviewed by Greptile