Skip to content

Epic: follow-ups from the host overhead work (#4278) #4426

Open
3 of 45 issues completed
Open

Description

@schlessera

Follow-ups found while landing #4278 (a hosted turn's host overhead, measured span by span and cut to what its guarantees need). #4278 has reached GitHub's limit of 100 sub-issues, so later follow-ups are tracked here.

None of these blocks #4278 from landing. Each was found in a review round or measurement on one of its pull requests, and each is safe to ship without. Each sub-issue names the pull request and review round it came from.

Scope

Deferred review findings, native-proof gaps and measurement follow-ups for the #4278 work. New behaviour that changes a recorded rule still needs its own maintainer decision on the sub-issue.

Acceptance criteria

  • Every sub-issue is closed, or re-scoped with a recorded reason.

Activity

  1. added
    type: fix
    area: ui-server
    area: backends
    priority: p3
    epic
    on Nov 21, 2026
  2. 20 remaining items

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    area: backendsarea: ui-serverepicpriority: p3type: fix

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions