You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
ci: the proof-system lane test packs twelve scenarios under one deadline and overruns it under load #4189
agent-readyContext and acceptance criteria are complete enough for an agent to take this unattended.area: ciCI workflows, the gates they run, release scripts, packaging.priority: p1Scheduled into the current or next milestone.type: testCoverage, harness or proof work with no behaviour change.
tests/integration-command.test.ts gives every test a 27-second work deadline inside Bun's 30-second cap (beforeEach, lines 18-27). The proof-system lane case added with #3269 (line 620) runs twelve scenarios, each a child process, inside one test.
Under the determinism gate's CPU load it overran: in run 44104941268 (determinism (1), PR #4175) it took 26.9 s on the first repetition and 27.2 s on the second, which failed with Integration fixture work deadline exceeded. The same selection passed in run 44104948265. Any PR that edits this file gets it repeated under load, and this file is edited by most merge-path changes.
Scope
One scenario per test, so each gets its own deadline. No deadline changes and no assertion is dropped.
Out of scope
The 27-second deadline and the 30-second cap.
The other cases in the file.
Acceptance criteria
Each of the twelve lane scenarios is its own test with the assertions it had.
The file passes the hosted determinism job on the PR that changes it.
Verification
bun run test tests/integration-command.test.ts, and the PR's determinism job.
agent-readyContext and acceptance criteria are complete enough for an agent to take this unattended.area: ciCI workflows, the gates they run, release scripts, packaging.priority: p1Scheduled into the current or next milestone.type: testCoverage, harness or proof work with no behaviour change.
Activity
test(ci): give each proof-system lane scenario its own test (#4189)
chore(ci): repeat a PR's changed Vitest specs under load in the pinne…