Repository navigation
Description
Out of scope
No change to what counts as passing proof, merge authorization, reservation capacity or selected CI categories. This follow-up does not repair the session-safety implementation.
Context
Observed on 2026-11-06 while confirming #3639 at b88c1f049f2d261f214857b238c893aaae2c940a, base cfbfcab18b869f829da803dec39f23fd55935074:
integrate.ts confirmacquired the exact-candidate reservation and requested candidate run 42156201790.- Declaration builds failed with TS4058. Returning the PR to draft left that run terminal with
cancelledconclusion, nine failed jobs and cancelled remaining selected work. - The same-head draft event produced newer successful cheap run 42156667802.
- More than nine minutes after its startup, the original confirmation process was still running rather than reporting the failed/cancelled confirmation and completing cleanup.
(latestIntegrationRun, scripts/integration-proof.ts:19-26) selects only the highest matching run ID. The normal confirmation loop (while (!lost), scripts/integrate.ts:346-361) repeatedly selects that latest run, returns null for draft/feedback cadence, and then sleeps before selecting the same run again. It never examines the older terminal confirmation once a newer draft run masks it. The heartbeat continues independently while the candidate head/base remain unchanged. Owned cleanup is only reached in the final block (} finally {, scripts/integrate.ts:367-373).
Related #3573 concerns a different latest-run problem in contract proof. It does not cover a newer cheap CI run masking the requested failed confirmation.
Scope
Bind confirmation observation to the requested confirmation lifecycle, or explicitly terminate when the live PR is returned to draft. A newer cheap same-head run must not cause indefinite observation of that run or extend the failed confirmation's reservation.
Acceptance criteria
- A requested confirmation that fails or is cancelled reaches an explicit terminal refusal and releases only its owned reservation even if a newer same-head draft/feedback run completes afterward.
- Returning a confirming PR to draft has a bounded, documented outcome; it cannot silently retain authority until the sixty-minute cap.
- Preserve head/base/run/attempt/cadence binding, transient transport retry behavior, and ownership fences. Never accept an older passing run as proof for a new confirmation.
Verification
Extend the existing offline integration-command runtime fixture with a terminal failed/cancelled requested run followed by a successful newer draft/feedback run. Prove the process exits and the owned lease is released, with a mutation/failing-first receipt. Preserve healthy confirmation and foreign-holder controls.
Contract impact
Repository tooling only; no published package or integration-contract change. This wanted tooling correction is unscheduled; priority p2 applies.
Triage 2026-11-08 at main 1619741f291f525d17cde4970a5ada40644117c1: Inspected latest-run selection, the current confirmation loop and owned-finally cleanup. The reported newer-cheap-run masking path remains in source and the offline runtime-fixture brief is complete. This is source evidence, not a newly executed process-hang reproduction.
Activity