Problem
bun run check:pr --all runs the complete unit and integration suite as one bun run test process (localChecks, scripts/check-pr.ts:10), and every later stage (build, browser, layout, endurance, captures, native probes) strictly after it. On a 32-core host the unit tier alone takes roughly two hours, while hosted CI runs the same tiers across parallel jobs in about 20 minutes. The 0.44.0 release fell back to hosted candidate CI as its proof for this reason (#3030).
scripts/unit-workers.ts already runs the suite as concurrent serial Bun processes with per-worker leases (localUnitWorkerCount gives 8 workers on 32 cores / 47 GiB), but the full local run does not use it.
Acceptance criteria
check:pr --allruns the complete unit tier through the existing unit-worker runner, with the same file inventory, report validation (validateUnitReports) andBRAIN_REQUIRE_CHROMErequirement as the serial run.- Stages that do not share an exclusive resource (for example typecheck alongside the unit tier) run concurrently; stages that share Docker, Chrome or the native loop/storage fixtures stay serialized.
- A missing or failed worker report fails the run exactly as a serial failure does.
- Wall-clock for
check:pr --allon a 32-core host is recorded before and after in the PR.
Scope
Use the existing unit-worker inventory, report validation and worker leases for the full local unit tier. Audit dependencies before overlapping independent stages; keep exclusive Docker/Chrome/native storage work serialized, existing guards and exact failure propagation intact.
Out of scope
No new execution framework, omitted files, relaxed report validation, deadline increases, network-dependent tests, or changes to hosted proof/merge policy. Historical wall-clock figures are reported observations, not this triage’s measurements.
Verification
Inspect localChecks (scripts/check-pr.ts:25-26), localUnitWorkerCount (scripts/unit-workers.ts:15) and validateUnitReports call sites (scripts/unit-workers.ts:344-360). Add focused scheduling/report-failure controls, with restored causal mutations; record comparable before/after full local timing on the requested host when available. Run ordinary focused preflight and complete selected candidate proof. No full local release proof or 32-core timing was run during triage.
Contract impact
Internal local verification orchestration only; preserve CLI/MCP/wire/frontmatter and hosted confirmation semantics. No changes to shipped packages selected.
2026-11-02 triage at main a84d9bfbcb4e608b504aa0a9feb1144ad9a0b77e: Verified serial full-suite selection and existing worker/report machinery, filled scope/exclusions/verification/contract sections from the request. Preserve p2 and native parent #1849; implementation can start without a new product ruling.
Agent-executable verification remaining (access reconciled 2026-11-04)
Implementation is in draft PR #3336, a proof-system change via scripts/check-pr.ts that goes through the serialized lane on main. Two pieces of evidence remain. The current agent machine supplies the required host resources, as verified below:
- On a host with unprivileged user namespaces enabled, run
bun run test tests/unit-workers.test.tsat the PR head and confirm it passes. Then make the per-worker report read inscripts/unit-workers.tstolerate a missing file, and confirm the test fails onMISSING_WORKER_REPORT_FAILS_RUN. Restore the file afterwards. - On the 32-core / 47 GiB host, run
bun run check:pr --allatc23a5811cand at the PR head. Record both totals and the unit stage'selapsedMs.
Completion evidence: post both actual results on #3336. Host access is now available to the agent; readiness for executing the verification is not a claim that either test or timing run has passed. Landing then follows the proof-system lane: main green, the stability window open, and #3309's turn settled.
2026-11-04 triage at main 53b862123d7b8e4c9d039859fabdc9fc6ad4cd36: Reverified the current serial full-unit path and existing open #3336 handoff; required namespace-enabled and 32-core evidence remains unchanged. No new runtime qualification or implementation is claimed.
Access reconciliation — 2026-11-04: nproc reports 32 CPUs, free reports 47 GiB total RAM, and unshare -Ur true exits 0 in the current agent environment. Root Docker and the native proof image are also available. The original host-access limitation is resolved: remove needs: human and add agent-ready for the specified PR-head positive/missing-report mutation test and comparable full before/after timings. Neither verification has been run by this access check. Preserve the serialized proof-system landing requirements, milestone 0.45.0 and p2; access alone does not qualify or authorize bypassing that lane.
Activity
[-]check:pr --all runs the complete unit suite in one serial process[/-][+]ci: run complete local unit proof through existing workers[/+]schlessera commentedon Nov 2, 2026
Claim
wi3238-f4c8: working on branchchore/3238-full-local-unit-workers, draft PR #3336 againstmain. This is a proof-system change (scripts/check-pr.ts), so it waits for the serialized lane: main must be green again (#3315), the stability window must be open, and off-main qualification evidence must be attached. Path collision noted with draft #3309 (same files, also a proof-system squash). Remaining: the hosted run of the new missing-report control and the 32-corecheck:pr --allbefore/after timing (both listed in the PR).schlessera commentedon Nov 2, 2026
Handing off as
needs: human. The work is done in draft #3336, but it needs the namespace-enabled test run and the 32-core timing described in the body before it can enter the proof-system lane.schlessera commentedon Nov 8, 2026
Claim
wi3238-k7q2: resuming draft #3336 on branchchore/3238-full-local-unit-workers. Plan: refresh it onto currentmain, runtests/unit-workers.test.tsplus the missing-report causal mutation on this namespace-capable host, record the 32-corecheck:pr --allbefore/after timing, then take it through the proof-system lane.chore(ci): run the complete local unit tier through the existing unit…
chore(ci): run the complete local unit tier through the existing unit…
chore(ci): run the complete local unit tier through the existing unit…
schlessera commentedon Nov 8, 2026
Delivered in #3336, squashed as
37123c8e5on main. Exact-head candidate confirmation run 42491958879 passed at head6d6826142.check:pr --allnow runs its full unit tier through 8 unit workers on the 32-core host.a63e564f0against 1,551 s with workers at3832bd1e1. The patch is identical at the merged head.--allat the head passed every stage in 5,892 s. The base run stopped after its unit tier because of ui-react: ClampedPre timeline copy-control render test fails when the render directory runs together #3720, so its complete total is an estimate of about 10,250 s. Details are in the PR body.MISSING_WORKER_REPORT_FAILS_RUN).