Part of #2948 (task 7).
Blocked by #2955
Context
bun scripts/ci-timings.ts report writes a report directory by hand today (scripts/ci-timings.ts:548). The #2948 ruling sets a daily digest and a weekly full report generated from the durable archive, produced as artifacts every day.
Scope
- A scheduled workflow (daily, plus a weekly full run) that generates, from the archive: throughput cohorts as
docs/process/ci-throughput.mdrequires; first-main green per proof-policy epoch; red-main incidents and time to green; the top failing and suspected-flaky test families; escape classes once ci: attribute why each failed first-main attempt escaped pre-merge proof #2937 lands; runner-slot wait; local contention once events are published; and the Epic: independent changes land on main concurrently, with only overlapping work serialized #2934 Phase B gate status (7 consecutive days in one epoch, first-main green at or above 80%, every red incident attributed). - Output as Markdown and JSON, uploaded as artifacts and written to the job summary.
- A coverage section in every report listing missing collection hours, expired sources, failed acquisitions and unknowns, so absent data never reads as zero.
- A
changedflag in the digest JSON, true when a red-main incident passes the configured threshold, the gate changes state, or a collection gap appears.
Out of scope
- Posting reports anywhere (ci: post evidence reports to a pinned tracking issue #2957).
Acceptance criteria
- From a fixture archive, the weekly report's numbers match a manual recomputation of the same window; proven by a test.
- A fixture with a missing collection hour lists it under coverage and does not report zero activity for it.
- The gate section reports
metexactly when the fixture satisfies all three conditions, andnot metwith the failing condition otherwise. - The
changedflag is true for each of its three triggers and false otherwise.
Verification
Focused report tests; one recorded scheduled run with its artifacts linked.
Contract impact
None.
Metadata
Metadata
Assignees
Labels
agent-readyContext and acceptance criteria are complete enough for an agent to take this unattended.area: ciCI workflows, the gates they run, release scripts, packaging.priority: p2Wanted, not scheduled. Pulled in when a milestone has room.type: choreTooling, CI, release plumbing, dependencies.
Activity
schlessera commentedon Nov 17, 2026
Unblocked: #2955 is closed, so
scripts/sync-project.tsis removing theblockedlabel.schlessera commentedon Nov 17, 2026
Claimed for implementation. Claim token:
claim-2c7b38ee. Branch:chore/2956-ci-evidence-reports.collisions: closure-only overlaps with open PRs on the ci-timings tests; no path collision
chore(ci): generate the daily digest and weekly evidence report from …
schlessera commentedon Nov 17, 2026
The digest and weekly report generator landed in #4141 (squash 2396966). The one remaining criterion is a recorded scheduled run with its artifacts linked. The first scheduled
ci-evidence-reportrun is at 03:37 UTC on 2026-11-18, and its weekly report first runs on Monday 2026-11-23. This issue closes once those runs are linked here. The #2955 backfill is still running, so the first digest may cover a partial archive.schlessera commentedon Nov 18, 2026
First scheduled daily digest:
ci-evidence-reportrun 44231988052 (eventschedule, created 2026-11-18T03:39:49Z on main80a16d2b7) completedsuccess. It uploaded theci-evidence-reportartifact (id 14394843553, 8,892 bytes), which containsdigest.mdanddigest.json.The digest covers 2026-11-17 UTC from archive
792a680d5. It reports 53 merged PRs, 40/53 first-main green, 5 red-main incidents and the Phase B gate as not met. It correctly marks its own coverage as incomplete: 27 archive acquisitions failed, so its counts are lower bounds, as expected while the #2955 backfill is unfinished. This run didn't generate a weekly report, because today isn't the weekly day.This issue's remaining criterion is the first scheduled weekly report, on Monday 2026-11-23. It stays open until that run is linked here.
schlessera commentedon Nov 23, 2026
2026-11-23 0.45.0 release reconciliation (maintainer-approved): deferred out of 0.45.0. This is p2 observability/CI-reporting work that changes no product safety behaviour, so it no longer blocks the release. Milestone removed; it will be scheduled into a later release when it is committed.