Skip to content

ui-server: reconcile every shared-reference and worktree criterion against the delivered children #2751

Closed

Description

@schlessera

Part of #2390.

Blocked by #2431
Blocked by #2432
Blocked by #2723
Blocked by #2734
Blocked by #2837
Blocked by #2858

Context

#2390's acceptance criteria describe one integrated outcome: shared reference source, governed worktrees, hygiene-integrated cleanup and backend tools, proven on real storage through both backends. The implementation is split across children, each with its own proof:

Until now, #2432's criterion 7 carried the epic-wide reconciliation, which put final acceptance ahead of #2723 and #2734. This task holds it instead, after all four open children land. A child closing does not prove the epic; per #2390, documentation PR #2427 alone never supplies completion evidence.

Scope

Out of scope

Acceptance criteria

  1. A comment on Epic: shared reference source and governed worktrees #2390 lists each of its acceptance criteria with the merged commit, test name or native proof receipt that satisfies it, on a named main SHA.
  2. The integrated run above passes through both installed backends on real Btrfs-backed native storage, with head/base identities, commands, exit codes and retained output recorded. The scope and changed-path allowance are not consumed by acquisition; intentional worktree edits are journaled and scope-counted.
  3. Both installed backends' provider-history guards pass across the worktree lifecycle and source freshness changes.
  4. Every unmet criterion has an open task under Epic: shared reference source and governed worktrees #2390 named in the comment; Epic: shared reference source and governed worktrees #2390 closes only when none remain.

Verification

Offline Odysseus repositories and keyless native fixtures under the coordinator's native slot; no external clone, model call or real credential. A missing slot leaves the integrated proof pending, not passed. bun run check:pr --base origin/main if any proof or docs file changes.

Contract impact

None. This task adds no surface.

2026-10-24: filed to hold #2390's final acceptance audit, split from #2432's criterion 7 so it follows the review fixes in #2723 and #2734.

2026-10-24: the acceptance audit found #2390's concurrency criterion only partly tested and filed #2858; this task stays open until it closes.

Activity

  1. added this to the 0.44.0 milestone on Oct 23, 2026
  2. added
    type: test
    area: ui-server
    area: backends
    priority: p0
    on Oct 23, 2026
  3. added
    agent-ready
    blocked
    and removed
    blocked
    on Oct 23, 2026
  4. schlessera commented on Oct 24, 2026

    @schlessera
    OwnerAuthor

    Claim 2026-10-24 (acceptance-2751-044): running the integrated native proof and reconciliation on main 5f5178cf85a529fa6207a269b369afceb0b0af41; harness on branch test/2751-reference-integration-044.

  5. added
    blocked
    on Oct 24, 2026
  6. schlessera commented on Oct 24, 2026

    @schlessera
    OwnerAuthor

    Unblocked: #2431, #2432, #2723, #2734, #2837, #2858 are closed, so scripts/sync-project.ts is removing the blocked label.

  7. removed
    blocked
    on Oct 24, 2026
  8. schlessera commented on Oct 24, 2026

    @schlessera
    OwnerAuthor

    All eight #2390 criteria are met on main 6f3f65fd1; mapping: see the final acceptance update on #2390.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    agent-readyarea: backendsarea: ui-serverpriority: p0type: test

    Projects

    No projects

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions