Infra WZ10: Jake's go, then WizSkills v0.1.0 is published (a person: the export-review gate) #554
Ticket WZ10 of spec #2622 (Infra; no milestone). A person's ticket: the export-review gate.
Done by
a person: Jake reads WZ9's summary and gives an explicit go on that exact candidate (its commit and tree). This plan's approval is not that go. Only after the go, saved privately and read back, does the orchestrator publish, under Jake's direction.
What to build
WizSkills v0.1.0 is public. After the go, the orchestrator:
re-checks that the candidate still matches WZ9's commit and tree (any difference stops and goes back to WZ9);
pushes that exact commit to openwizdev/WizSkillsmain with the copy's publish path (no force, no retry);
tags it v0.1.0, makes the repository public, and creates the release page from the changelog's 0.1.0 section;
reads back the commit, tag, tree, visibility and release page, and installs the published release once in a throwaway sandbox as the Claude Code plugin.
Owned paths
private/evidence/wizskills/first-release/ (shared with WZ9): the publish read-backs only
GitHub only: openwizdev/WizSkillsmain, its v0.1.0 tag, its visibility and its release page
WZ10 publish go from Jake, 2026-11-14, conditional: WizSkills v0.1.0 is published only once every gate passes on the exact same candidate: WZ15 (#628) merged; WZ9 (#553) builds a fresh candidate, which gets a clean fresh export review and passes the invocation gate (Claude Code, Codex and ClosedWiz's pinned install each actually invoke grill, where-are-we and plan-graph). Then, reading each step back: confirm protect is active, push that exact commit to openwizdev/WizSkills, tag v0.1.0, make the repository public, confirm protect again, and create the release page. Any finding or failure stops it and goes back to the orchestrator.
Private record: https://github.com/jparker2006/ClosedWiz/issues/325#issuecomment-6884354332
launch-fleet: held manual: C2 check of spec #551 before its new approval
Stable operation: wizskills-551-on1-j54-r9-652. This manager gates the unstarted consumer while assessing every declared-contract change since revision 8 under ON1/J54 and the C2 safeguards. The original contract hold and all independent gates retain their authority until the inclusive cutoff and exact ownership checks pass.
ON1/J54 contract assessment for revision 9, 2026-11-15.
Approved WZ15/#628 merged in #652 at dfeaf0a. Its exact contracts/wizskills.v1.md delta adds the project instruction files and direct ADR Markdown files as consumer settings, under J54. Existing consumer behaviour, effective owned paths, standalone/privacy restrictions and independent candidate, human and publication conditions remain unchanged. The disposition uses ON1, with C2's complete-cutoff and exact-hold safeguards; the specific new settings allowance is not treated as purely wording-only.
The failed link check triggered the mechanical migration ruling. Only this ticket's Links section was repaired against native blockers and the moved items' was-ClosedWiz mapping. Already completed prerequisite evidence remains elsewhere in the body. No scope, path, native blocker, outcome or independent gate changed. The repaired whole-graph link check passes with three real links and no refusals.
The whole-cutoff read since revision 8 covers #627, #652, #657, #661 and #676, with 42 complete file records; only #652 changes a declared contract. #699 is unmerged at assessment time; its advance capitals-only ON1/C2 disposition was verified and is conditional on its actual merged contract diff. Revision 9 will name the complete assessed cutoff.
The original #652 contract hold and this operation's exact temporary gate remain active. Release awaits the posted revision's validation, a later finite wake for the inclusive cutoff read, and a fresh complete ownership/hold-history check. No ready label is restored by this assessment.
Only this operation's exact temporary gate is ended. Its owner verified the complete comment, label/assignment and hold history immediately before the effect; no newer, competing or independent unresolved hold or start/release claim was present.
Release evidence: current revision 10, matching full revision-v2 fingerprint ee7bb27c34207b485a6c10c4fd4350b59eb472ee4e31c9ab6787d0fb9e78155c; successful inclusive cutoff extension, reusing the prior passed read and covering six merges/47 file records through 2026-11-15T08:51:21Z inclusively. No unassessed declared-contract delta was found.
The exact original #652 contract hold is covered by the verified ON1/J54 disposition of merge dfeaf0a, retaining C2's ownership and cutoff safeguards. This is not a purely wording-only classification. Consumer scope and effective owned paths are unchanged; the mechanical Links repair and WZ16 ordering are bound by their separate approvals.
The single label edit restored ready-for-human and removed held. The actual read-back confirms exactly ready-for-human, no held, no assignee, the same complete hold history, and label events confirming both changes. This ends no other gate and grants no builder start or live/publication effect. Native blockers, WZ9's fresh exact-candidate checks, WZ10's independent publication conditions and WZ12's ownership-cut prerequisites remain binding.
launch-fleet: held manual: C2 check of spec #551 before its new approval
Stable operation: wizskills-551-on1-j104-r13-871. The spec planner gates this unchanged-scope consumer for the complete ON1/J104 cutoff assessment. Original contract holds and independent gates keep their own authority. Only this exact gate may be ended by this operation after the approval, delayed inclusive cutoff and full ownership checks pass.
Approved producer WZ17 #863's finding 5 merged as PR #871, at c51c009 on 2026-11-16T02:21:29Z. Its first-parent contract delta matches J104, whose private decision record was read and verified. The normative project_settings list adds only .github/workflows/*.yml, .github/workflows/*.yaml, pnpm-workspace.yaml, package.json and packages/*/src.
The added contract lines limit package.json to its workspaces field and packages/*/src to folder existence, never its files. Absent paths cause no read, no error and no stand-in setting. Consumer code is never run or imported; private-state locations come only from verified domain settings under existing private-access authority. J73 and E1's installed-OpenWiz source and explicit user-go limits remain unchanged.
This is an ON1/J104 compatibility disposition, not a purely wording-only C2 classification. C2's full-cutoff, hold-first, record-before-label and exact hold-ownership safeguards apply. The complete paginated closed-main merge inventory since revision 12's 2026-11-16T02:10:12Z approval contains #871 only; all three file records were read, including statuses and rename-name validation. Only contracts/wizskills.v1.md matches any of the seven tickets' declared Relies on files. None was renamed or deleted. No plan body, title, native blocker, scope or owned path changes; all seven Relies on checks and the whole-graph link check pass.
WZ10 retains its human role, publish-read-back slice of the shared evidence path and existing WizSkills publication targets. Its #553 blocker and independently recorded conditional exact-candidate go remain binding. No candidate gate or publication condition is satisfied by this assessment.
The original #871 contract hold and this operation's exact temporary gate stay active until revision 13 is recorded and validated, the later inclusive cutoff read succeeds and complete current hold histories/ownership show no newer or competing unresolved gate. This assessment restores no label. Stable operation: wizskills-551-on1-j104-r13-871. No builder start, live action or publication is authorized here.
Only this operation's exact temporary gate is ended. Its planner owner read the full comment history, all label/assignment events, current labels/ownership and every hold's release evidence immediately before restoration. The only unresolved holds since held was last applied were the original #871 contract hold and this exact gate. There was no newer or competing unresolved hold, builder, assignee or release-starting claim.
Release evidence: current revision 13, complete table validated by check-approval.sh and independently matching revision-v2 text/fingerprint 5e8106da8a4eefeeca0929a28beca5b8014c939e3b0ebb30d053ee5e81cee6c9; the passed delayed inclusive cutoff read, covering the full interval through 2026-11-16T02:35:15Z inclusive. It finds only #871 with three complete file records and no unassessed declared-contract delta.
The exact original #871 contract hold is covered by the verified ON1/J104 compatibility disposition of c51c009, retaining C2's cutoff and ownership safeguards. Consumer behaviour and effective owned paths remain unchanged. Earlier #652 holds and their gates have their own explicit revision-10 release evidence; this comment does not re-release them.
The single label edit restored ready-for-human and removed held. Subsequent complete label/history/event read-back confirms ready-for-human, no held, no other ready role, no assignee and no new competing hold. Native blockers and all separate candidate, privacy, install, human, live and publication gates retain their owners. This ends no other condition and starts no builder or publication. Stable operation: wizskills-551-on1-j104-r13-871.
Orchestrator ruling: the candidate is received and goes to the owner for sign-off at about 05:00Z; nothing publishes before that. So he can choose without a wait, also build a second candidate now whose only difference is the changelog heading's date, 2026-11-16 (the UTC day it would publish), with the same checks: standalone dry run, privacy scan with the private list, and the six-finding check. Report both candidates' tree and release-commit ids side by side as one ORCH-ASK, with the pinned-install trial's result when it finishes. Do not start any other search or review.
Orchestrator ruling (J125): the owner signed off v0.1.0's changelog and gave the publish go, 2026-11-15, leaving the heading's date to the orchestrator. The date is 2026-11-16. Before WZ10 publishes: post, as one ORCH-ASK, the 2026-11-16 candidate's tree id and release-commit id, the results of its three checks (standalone dry run, privacy scan with the private list, the six-finding check), whether an independent rebuild gives the same tree, and the pinned-install trial's result. The orchestrator answers with a go naming that exact release commit, and WZ10 publishes exactly it. If the re-dated candidate failed any check, say so and name the 2026-11-13 candidate instead.
Private record: https://github.com/jparker2006/ClosedWiz/issues/325#issuecomment-6908196745
Orchestrator ruling: option A, and the go names the exact commit. Publish the content the owner signed off, with only the date changed: tree f2bf11c221f133ce0ab4e21e243e98e19ec01b20, release commit ff52893fe9de4fc8c975bfb0aedb7604c569f887, tag v0.1.0. This go takes effect when two things are posted here: the independent rebuild gives the same tree id, and the pinned-install trial on that tree passes. With both recorded, WZ10 publishes exactly ff52893f, with no further question to the orchestrator; if either fails, stop and report. The five files changed on main since then go to v0.1.1.
Private record: https://github.com/jparker2006/ClosedWiz/issues/325#issuecomment-6908196745
WZ10 gate 1 of 2 for the go on release commit ff52893fe9de4fc8c975bfb0aedb7604c569f887 (tree f2bf11c221f133ce0ab4e21e243e98e19ec01b20): the independent rebuild matches.
The source is public on openwiz branch room/553-wz9-v010-source-2026-11-16, at eb477e41363e685651ef9763ac0a9f9354387ed8: 72374af1 plus the one-line 2026-11-16 changelog date, with the same timestamps. It was re-made with the noreply identity after the push guard refused a placeholder identity.
Fresh clones from GitHub rebuild exactly tree f2bf11c2 and release commit ff52893f, byte-identical to candidate 2, and an independent rebuild gives the same tree.
WZ10 gate 2 of 2 for the go on release commit ff52893fe9de4fc8c975bfb0aedb7604c569f887 (tree f2bf11c221f133ce0ab4e21e243e98e19ec01b20): ClosedWiz's pinned-install trial passes.grill, where-are-we and plan-graph are invoked from the installed copy, and every skill path resolves. Its no-push check is clean. Both gates are recorded, so the go is effective: WZ10 publishes exactly ff52893f, from source eb477e41363e685651ef9763ac0a9f9354387ed8.
WizSkills v0.1.0 is published, exactly the release commit the go named. The fleet thread read each fact back independently:
openwizdev/WizSkills is public, default branch main.
main is at ff52893fe9de4fc8c975bfb0aedb7604c569f887, a parentless root with tree f2bf11c221f133ce0ab4e21e243e98e19ec01b20, built from source eb477e41363e685651ef9763ac0a9f9354387ed8.
The annotated tag v0.1.0 peels to ff52893f.
The protect ruleset is unchanged: active on ~ALL branches, with deletion and non_fast_forward and no bypass actors.
Activity
jparker2006 commentedon Nov 15, 2026
WZ10 publish go from Jake, 2026-11-14, conditional: WizSkills v0.1.0 is published only once every gate passes on the exact same candidate: WZ15 (#628) merged; WZ9 (#553) builds a fresh candidate, which gets a clean fresh export review and passes the invocation gate (Claude Code, Codex and ClosedWiz's pinned install each actually invoke
grill,where-are-weandplan-graph). Then, reading each step back: confirmprotectis active, push that exact commit toopenwizdev/WizSkills, tagv0.1.0, make the repository public, confirmprotectagain, and create the release page. Any finding or failure stops it and goes back to the orchestrator.Private record: https://github.com/jparker2006/ClosedWiz/issues/325#issuecomment-6884354332
jparker2006 commentedon Nov 15, 2026
launch-fleet: held for #652: contract changed, re-approve. contracts/wizskills.v1.md changed in #652.
jparker2006 commentedon Nov 15, 2026
launch-fleet: held manual: C2 check of spec #551 before its new approval
Stable operation: wizskills-551-on1-j54-r9-652. This manager gates the unstarted consumer while assessing every declared-contract change since revision 8 under ON1/J54 and the C2 safeguards. The original contract hold and all independent gates retain their authority until the inclusive cutoff and exact ownership checks pass.
jparker2006 commentedon Nov 15, 2026
ON1/J54 contract assessment for revision 9, 2026-11-15.
Approved WZ15/#628 merged in #652 at dfeaf0a. Its exact contracts/wizskills.v1.md delta adds the project instruction files and direct ADR Markdown files as consumer settings, under J54. Existing consumer behaviour, effective owned paths, standalone/privacy restrictions and independent candidate, human and publication conditions remain unchanged. The disposition uses ON1, with C2's complete-cutoff and exact-hold safeguards; the specific new settings allowance is not treated as purely wording-only.
The failed link check triggered the mechanical migration ruling. Only this ticket's Links section was repaired against native blockers and the moved items' was-ClosedWiz mapping. Already completed prerequisite evidence remains elsewhere in the body. No scope, path, native blocker, outcome or independent gate changed. The repaired whole-graph link check passes with three real links and no refusals.
The whole-cutoff read since revision 8 covers #627, #652, #657, #661 and #676, with 42 complete file records; only #652 changes a declared contract. #699 is unmerged at assessment time; its advance capitals-only ON1/C2 disposition was verified and is conditional on its actual merged contract diff. Revision 9 will name the complete assessed cutoff.
The original #652 contract hold and this operation's exact temporary gate remain active. Release awaits the posted revision's validation, a later finite wake for the inclusive cutoff read, and a fresh complete ownership/hold-history check. No ready label is restored by this assessment.
jparker2006 commentedon Nov 15, 2026
C2 gate 6891420532: ended
Only this operation's exact temporary gate is ended. Its owner verified the complete comment, label/assignment and hold history immediately before the effect; no newer, competing or independent unresolved hold or start/release claim was present.
Release evidence: current revision 10, matching full revision-v2 fingerprint ee7bb27c34207b485a6c10c4fd4350b59eb472ee4e31c9ab6787d0fb9e78155c; successful inclusive cutoff extension, reusing the prior passed read and covering six merges/47 file records through 2026-11-15T08:51:21Z inclusively. No unassessed declared-contract delta was found.
The exact original #652 contract hold is covered by the verified ON1/J54 disposition of merge dfeaf0a, retaining C2's ownership and cutoff safeguards. This is not a purely wording-only classification. Consumer scope and effective owned paths are unchanged; the mechanical Links repair and WZ16 ordering are bound by their separate approvals.
The single label edit restored ready-for-human and removed held. The actual read-back confirms exactly ready-for-human, no held, no assignee, the same complete hold history, and label events confirming both changes. This ends no other gate and grants no builder start or live/publication effect. Native blockers, WZ9's fresh exact-candidate checks, WZ10's independent publication conditions and WZ12's ownership-cut prerequisites remain binding.
jparker2006 commentedon Nov 16, 2026
launch-fleet: held for #871: contract changed, re-approve. contracts/wizskills.v1.md changed in #871.
jparker2006 commentedon Nov 16, 2026
launch-fleet: held manual: C2 check of spec #551 before its new approval
Stable operation: wizskills-551-on1-j104-r13-871. The spec planner gates this unchanged-scope consumer for the complete ON1/J104 cutoff assessment. Original contract holds and independent gates keep their own authority. Only this exact gate may be ended by this operation after the approval, delayed inclusive cutoff and full ownership checks pass.
jparker2006 commentedon Nov 16, 2026
ON1/J104 contract assessment, 2026-11-16.
Approved producer WZ17 #863's finding 5 merged as PR #871, at c51c009 on 2026-11-16T02:21:29Z. Its first-parent contract delta matches J104, whose private decision record was read and verified. The normative project_settings list adds only
.github/workflows/*.yml,.github/workflows/*.yaml,pnpm-workspace.yaml,package.jsonandpackages/*/src.The added contract lines limit package.json to its workspaces field and packages/*/src to folder existence, never its files. Absent paths cause no read, no error and no stand-in setting. Consumer code is never run or imported; private-state locations come only from verified domain settings under existing private-access authority. J73 and E1's installed-OpenWiz source and explicit user-go limits remain unchanged.
This is an ON1/J104 compatibility disposition, not a purely wording-only C2 classification. C2's full-cutoff, hold-first, record-before-label and exact hold-ownership safeguards apply. The complete paginated closed-main merge inventory since revision 12's 2026-11-16T02:10:12Z approval contains #871 only; all three file records were read, including statuses and rename-name validation. Only contracts/wizskills.v1.md matches any of the seven tickets' declared Relies on files. None was renamed or deleted. No plan body, title, native blocker, scope or owned path changes; all seven Relies on checks and the whole-graph link check pass.
WZ10 retains its human role, publish-read-back slice of the shared evidence path and existing WizSkills publication targets. Its #553 blocker and independently recorded conditional exact-candidate go remain binding. No candidate gate or publication condition is satisfied by this assessment.
The original #871 contract hold and this operation's exact temporary gate stay active until revision 13 is recorded and validated, the later inclusive cutoff read succeeds and complete current hold histories/ownership show no newer or competing unresolved gate. This assessment restores no label. Stable operation: wizskills-551-on1-j104-r13-871. No builder start, live action or publication is authorized here.
jparker2006 commentedon Nov 16, 2026
C2 gate 6905676067: ended
Only this operation's exact temporary gate is ended. Its planner owner read the full comment history, all label/assignment events, current labels/ownership and every hold's release evidence immediately before restoration. The only unresolved holds since held was last applied were the original #871 contract hold and this exact gate. There was no newer or competing unresolved hold, builder, assignee or release-starting claim.
Release evidence: current revision 13, complete table validated by check-approval.sh and independently matching revision-v2 text/fingerprint 5e8106da8a4eefeeca0929a28beca5b8014c939e3b0ebb30d053ee5e81cee6c9; the passed delayed inclusive cutoff read, covering the full interval through 2026-11-16T02:35:15Z inclusive. It finds only #871 with three complete file records and no unassessed declared-contract delta.
The exact original #871 contract hold is covered by the verified ON1/J104 compatibility disposition of c51c009, retaining C2's cutoff and ownership safeguards. Consumer behaviour and effective owned paths remain unchanged. Earlier #652 holds and their gates have their own explicit revision-10 release evidence; this comment does not re-release them.
The single label edit restored ready-for-human and removed held. Subsequent complete label/history/event read-back confirms ready-for-human, no held, no other ready role, no assignee and no new competing hold. Native blockers and all separate candidate, privacy, install, human, live and publication gates retain their owners. This ends no other condition and starts no builder or publication. Stable operation: wizskills-551-on1-j104-r13-871.
jparker2006 commentedon Nov 16, 2026
launch-fleet: asked the orchestrator (the v0.1.0 candidate is waiting for Jake's sign-off under J112; nothing published)
jparker2006 commentedon Nov 16, 2026
Orchestrator ruling: the candidate is received and goes to the owner for sign-off at about 05:00Z; nothing publishes before that. So he can choose without a wait, also build a second candidate now whose only difference is the changelog heading's date, 2026-11-16 (the UTC day it would publish), with the same checks: standalone dry run, privacy scan with the private list, and the six-finding check. Report both candidates' tree and release-commit ids side by side as one ORCH-ASK, with the pinned-install trial's result when it finishes. Do not start any other search or review.
jparker2006 commentedon Nov 16, 2026
Orchestrator ruling (J125): the owner signed off v0.1.0's changelog and gave the publish go, 2026-11-15, leaving the heading's date to the orchestrator. The date is 2026-11-16. Before WZ10 publishes: post, as one ORCH-ASK, the 2026-11-16 candidate's tree id and release-commit id, the results of its three checks (standalone dry run, privacy scan with the private list, the six-finding check), whether an independent rebuild gives the same tree, and the pinned-install trial's result. The orchestrator answers with a go naming that exact release commit, and WZ10 publishes exactly it. If the re-dated candidate failed any check, say so and name the 2026-11-13 candidate instead.
Private record: https://github.com/jparker2006/ClosedWiz/issues/325#issuecomment-6908196745
jparker2006 commentedon Nov 16, 2026
Orchestrator ruling: option A, and the go names the exact commit. Publish the content the owner signed off, with only the date changed: tree
f2bf11c221f133ce0ab4e21e243e98e19ec01b20, release commitff52893fe9de4fc8c975bfb0aedb7604c569f887, tagv0.1.0. This go takes effect when two things are posted here: the independent rebuild gives the same tree id, and the pinned-install trial on that tree passes. With both recorded, WZ10 publishes exactlyff52893f, with no further question to the orchestrator; if either fails, stop and report. The five files changed on main since then go to v0.1.1.Private record: https://github.com/jparker2006/ClosedWiz/issues/325#issuecomment-6908196745
jparker2006 commentedon Nov 16, 2026
WZ10 gate 1 of 2 for the go on release commit
ff52893fe9de4fc8c975bfb0aedb7604c569f887(treef2bf11c221f133ce0ab4e21e243e98e19ec01b20): the independent rebuild matches.room/553-wz9-v010-source-2026-11-16, ateb477e41363e685651ef9763ac0a9f9354387ed8:72374af1plus the one-line 2026-11-16 changelog date, with the same timestamps. It was re-made with the noreply identity after the push guard refused a placeholder identity.f2bf11c2and release commitff52893f, byte-identical to candidate 2, and an independent rebuild gives the same tree.Gate 2, ClosedWiz's pinned-install trial on
f2bf11c2, is running. Private evidence is on ClosedWiz Make budget refresh independent of tied header order (polish for #2433, R4) #2637's branch.jparker2006 commentedon Nov 16, 2026
WZ10 gate 2 of 2 for the go on release commit
ff52893fe9de4fc8c975bfb0aedb7604c569f887(treef2bf11c221f133ce0ab4e21e243e98e19ec01b20): ClosedWiz's pinned-install trial passes.grill,where-are-weandplan-graphare invoked from the installed copy, and every skill path resolves. Its no-push check is clean. Both gates are recorded, so the go is effective: WZ10 publishes exactlyff52893f, from sourceeb477e41363e685651ef9763ac0a9f9354387ed8.jparker2006 commentedon Nov 16, 2026
WizSkills v0.1.0 is published, exactly the release commit the go named. The fleet thread read each fact back independently:
openwizdev/WizSkillsis public, default branchmain.mainis atff52893fe9de4fc8c975bfb0aedb7604c569f887, a parentless root with treef2bf11c221f133ce0ab4e21e243e98e19ec01b20, built from sourceeb477e41363e685651ef9763ac0a9f9354387ed8.v0.1.0peels toff52893f.protectruleset is unchanged: active on~ALLbranches, withdeletionandnon_fast_forwardand no bypass actors.## 0.1.0 - 2026-11-16.Known gaps go to v0.1.1: X6 (the installer's reported double failure), the short private commit ids (#876: Infra WZ18: the package carries no private commit ids #879's list), and the five newer files on main (#606: 0.0.16 T3: private personal App and protected key handoff #864, #888: Infra BR3: builders rule inside their ticket and log each ruling #927, #889: Infra BR4: reviewers mark each ruling and close the capped loop #928). The private read-back record is on ClosedWiz Make budget refresh independent of tied header order (polish for #2433, R4) #2637's branch.
jparker2006 commentedon Nov 16, 2026
launch-fleet: complete: WizSkills v0.1.0 published at release commit ff52893fe9de4fc8c975bfb0aedb7604c569f887, read back independently: #554 (comment)