-
Notifications
You must be signed in to change notification settings - Fork 53
Pull requests: openshift/cluster-control-plane-machine-set-operator
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
OCPBUGS-65497: Add all managed resources to ClusterOperator relatedObjects
jira/invalid-bug
Indicates that a referenced Jira bug is invalid for the branch this PR is targeting.
jira/severity-low
Referenced Jira bug's severity is low for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#404
opened May 6, 2026 by
RadekManak
Contributor
Loading…
update cert injection annotations to beta
needs-ok-to-test
Indicates a PR that requires an org member to verify it is safe to test.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
#393
opened Feb 21, 2026 by
lance5890
Loading…
OCPBUGS-74343: Fix OTE panic and configure test timeout and parallelism for test suites
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
jira/invalid-bug
Indicates that a referenced Jira bug is invalid for the branch this PR is targeting.
jira/severity-moderate
Referenced Jira bug's severity is moderate for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#390
opened Feb 9, 2026 by
sunzhaohua2
Contributor
Loading…
Deleteallmasters
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
needs-rebase
Indicates a PR cannot be merged because it has merge conflicts with HEAD.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#388
opened Jan 29, 2026 by
miyadav
Member
Loading…
WIP: add unmanaged grace period for new node
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
lifecycle/stale
Denotes an issue or PR has remained open with no activity and has become stale.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
ProTip!
Filter pull requests by the default branch with base:main.