Skip to content
Merged
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
6 changes: 6 additions & 0 deletions README.md
Original file line number Diff line number Diff line change
Expand Up @@ -485,6 +485,12 @@ that could satisfy protection after it becomes ready. Nuxt's E2E, exact-candidat
and post-deploy smoke invocations are excluded. Deferred paths never publish
build or gate proof artifacts.

A caller's own required job must never skip on a draft (`if: ... !github.event.pull_request.draft`):
GitHub counts a skipped required job as passed, and a push to a draft in the same second as *ready for
review* lets the push's run (payload still draft) cancel the ready run in the same concurrency group,
leaving only the skip; the PR then shows mergeable with nothing run (pacc-trac `fast`, 2026-11-16).
Report a failure on drafts, as the callables do, or read the live draft state (workflows#243).

After marking a PR ready, push a commit or choose **Re-run all jobs** to run
validation. **Re-run failed jobs** preserves the succeeded admission job's draft
outputs and leaves validation deferred. For automatic recovery on marking ready,
Expand Down
Loading