Skip to content
Merged
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
1 change: 1 addition & 0 deletions ROADMAP.md
Original file line number Diff line number Diff line change
Expand Up @@ -33,6 +33,7 @@ Nothing to build — infrastructure is complete. The task is visibility: awesome
- **No Jira features** — scheduling, assignment, multi-human approval flows solve problems that don't exist in 1+N
- **No wall-clock tracking** — human-equivalent hours only; auto-timing turns a ledger into surveillance and changes what the tool is
- **No feature chasing** — every new field or ritual must answer "who consumes this?" (we once deleted our own priority field for failing this test)
- **No productized backfill/migration tooling** — old-ledger migration is rare (one-off per project, mostly at adoption); the manual pattern in methodology.md plus battle notes in pitfalls suffice. Decided 2026-11-10 after the energy-platform Feishu migration: worth recording, not worth building

## Endgame

Expand Down
Loading