Skip to content

Point Implement's post-review base updates to the Review budget - #1742

Merged
mergify[bot] merged 1 commit into
mainfrom
lean178/1599-review-budget-pointer
Nov 26, 2026
Merged

mergify[bot] merged 1 commit into
mainfrom
lean178/1599-review-budget-pointer

Conversation

@eowca

@eowca eowca commented Nov 26, 2026 •

Copy link
Copy Markdown
Contributor

Point Implement's post-review base updates to the Review budget

Context and goal

  • Context: The Review budget owns post-review base updates.
  • Problem: Implement repeats the base-update rule.
  • Goal: Link to the Review budget when the base or its check scripts change after review.

Closes #1599.

Acceptance

  • Keep the instruction to leave a branch awaiting delta alone.
  • Preserve the timing of the base-update decision and the instructions to preserve both review rounds.
  • Run the normal review and checks. The owner lifted the skill-bench hold. The separately gated conflict sentence belongs to Trim 40-50 redundant lines from core docs without losing a rule #1741 under the r50 order.

Validation

Recorded for 2242efb1f215

  • uv run --group dev ruff check src tests: exit 0
  • uv run --group dev tach check: exit 0
  • uv run --python 3.14 python scripts/check_architecture_docs.py: exit 0
  • scripts/size_budget.sh: exit 0
  • uv run --group dev pytest -q: exit 0

Open in [code]smith · Need help on this PR? Tag @codesmith-bot with what you need.

Review

  • primary, claude, 2242efb, approve

Co-Authored-By: Codex <noreply@openai.com>

@loopzero-feder-positronics loopzero-feder-positronics Bot left a comment

Copy link
Copy Markdown

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

loopzero primary review by claude on 2242efb1f215a735d5c31844f6b9e846272876ac, 16.5s: approve (0 critical, 0 important, 1 suggestion)

Settings per native call (launch configuration and CLI claims, not backend attestation):

  • Call 1: requested model claude-opus-5-5 (effort medium); CLI-reported model claude-opus-5-5 (effort unknown); configured model claude-opus-5-5 (effort medium)

Native Claude output is retained in the restricted local review receipt.

Leave base merges out of a branch awaiting its delta.
After an approved primary or a delta, merge `origin/<base>` into the existing
branch when the base or its check scripts change.
For base or check-script changes after review, follow the

Copy link
Copy Markdown

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

suggestion: "After review" is less precise than the timing it replaces

The old text set the timing as "After an approved primary or a delta". The new text says only "after review", which could also cover a request_changes primary or a branch still waiting for its delta. Line 66 forbids base merges while a branch awaits its delta. The linked Review budget (core/CONTRACT.md:229) does state the exact condition, so nothing breaks. Still, the acceptance criteria ask to preserve the timing of the base-update decision. Smallest fix: write "For base or check-script changes after an approved primary or a delta, follow the Review budget". That restores the exact timing and still removes the duplicated merge rule.

@eowca
eowca marked this pull request as ready for review November 26, 2026 09:30
@eowca

eowca commented Nov 26, 2026

Copy link
Copy Markdown
Contributor Author

@Mergifyio queue

@mergify

mergify Bot commented Nov 26, 2026 •

Copy link
Copy Markdown

✅ Merged into main as bf1646e at 09:36 UTC

5 min in the queue, 4 min of it CI.

So far

  • ✅ Entered the queue Thu 26 Nov, 09:31 · rule main · triggered by @eowca with the @mergifyio queue command
  • ✅ Passed · draft #1764
  • ✅ Merged 09:36 · bf1646e · squash
3 merge conditions met
  • github-review-approved · required by GitHub repository ruleset rule main: PR only, Mergify queue, existing checks required
  • any of · required by GitHub repository ruleset rule main: PR only, Mergify queue, existing checks required:
    • check-success = checks
    • check-neutral = checks
    • check-skipped = checks
  • any of · required by GitHub repository ruleset rule main: PR only, Mergify queue, existing checks required:
    • check-success = Loop-zero Eligibility
    • check-neutral = Loop-zero Eligibility
    • check-skipped = Loop-zero Eligibility

Times in UTC · dashboard · how the merge queue works

@eowca

eowca commented Nov 26, 2026

Copy link
Copy Markdown
Contributor Author

No description provided.

@mergify
mergify Bot merged commit bf1646e into main Nov 26, 2026
18 checks passed
@mergify mergify Bot removed the queued label Nov 26, 2026
@eowca
eowca deleted the lean178/1599-review-budget-pointer branch November 26, 2026 09:38
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

Point Implement’s post-review base update rule to Review budget

1 participant