Resume observing a confirmed Mergify entry after receipt compatibility changes #1639
An IntelFlo PR can already be in Mergify when the local check receipt becomes incompatible with the current CLI. loopzero merge --wait returns the admission error before reading existing membership, so builders have to find the older CLI or call the internal queue follower directly.
Evidence on miki:
~/.cache/intelflo-scratch/coordinator-gen/v546/14559-RESULT.md:14–18 and 14559-queue-transport-9ad3e624.hVMmvi. #14568 was already queued. The builder followed its existing entry and verified the landed SHA without submitting a new request.
~/.cache/intelflo-scratch/coordinator-gen/v546/14538-v131-notes.md:5 and 14510-RESULT.md:19. #14549 and #14557 were auto-queued. The builders used the check-producing installation to resume after an upgrade rejected the old receipt.
Offline reproduction
At 5b8473697, pass blocked readiness, a wait deadline and an exact-head PR to the existing Mergify merge helper. Stub live membership as present and the follower as returning a merge SHA. The helper raises the local receipt error and makes zero membership reads.
Acceptance
With merge --wait, an authenticated live membership for the selected PR allows the existing exact-head follower to observe landing even when the local receipt cannot authorize admission. Retain the existing time budget and landed-SHA verification.
The observation issues no queue request or confirmation write. Missing or unverifiable membership cannot bypass existing readiness, review, hold or admission gates. ready and new queue admission keep their current requirements.
Extend the existing offline Mergify resume fixture. Add no flags, settings or persisted state.
PR #1682 is parked as a draft at de8e465f670c. The fresh local check passed and ready --wait accepted its receipt. The primary review has three open findings:
Detect Mergify queue admission while source checks remain pending.
Bound membership probes and retries by the remaining wait deadline.
Verify that the PR landed on the configured target branch before cleanup.
Hosted checks also counted 13,854 test lines against the 13,850 cap (+4). Leaving the PR and issue open while the owner prioritizes check-time reduction.
#1682 is parked at e187f5692579dea2d4a3ac09f0177395f5a3eb0c. All three primary findings are resolved. The full exact-head check passed, and the single delta review approved with 0 critical and 0 important findings. The review fixture is 16 lines shorter than the original parked version. I ran check and review with loop-zero from a separate trusted main checkout at ec7a26f9, which contains the merged delta-across-base support from #1731.
The fresh integration projection is 13,872 Python test lines against the 13,850 cap, 22 over after main moved. Readiness and admission were stopped before changing the draft. Resume the same approved head when the integration projection fits. No replacement was opened.
Activity
eowca commentedon Nov 26, 2026
PR #1682 is parked as a draft at
de8e465f670c. The fresh local check passed andready --waitaccepted its receipt. The primary review has three open findings:Hosted checks also counted 13,854 test lines against the 13,850 cap (+4). Leaving the PR and issue open while the owner prioritizes check-time reduction.
eowca commentedon Nov 26, 2026
#1682 is parked at
e187f5692579dea2d4a3ac09f0177395f5a3eb0c. All three primary findings are resolved. The full exact-head check passed, and the single delta review approved with 0 critical and 0 important findings. The review fixture is 16 lines shorter than the original parked version. I ran check and review with loop-zero from a separate trusted main checkout atec7a26f9, which contains the merged delta-across-base support from #1731.The fresh integration projection is 13,872 Python test lines against the 13,850 cap, 22 over after main moved. Readiness and admission were stopped before changing the draft. Resume the same approved head when the integration projection fits. No replacement was opened.