You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Finalize the hermetic provider kit as an immutable, redistribution-safe, offline-capable test package; publish its complete behavior and requirement evidence; and hand the completed FLO-Q03 evidence into the roadmap.
Scope
Document the immutable package layout and exact offline build/run workflow.
Document manifest/lock finalization, licensing, redistribution, and checksum verification.
Implementation is complete in draft PR #60 at d3f6e49fbf8526ad8a109cfdf2e3aa9f926044af.
Fresh PR CI run #46 is fully green on repository validators, Rust 1.85, and stable: rustfmt, clippy with warnings denied, all-target tests, Rustdoc, examples, and package verification.
The checkpoint now provides the exact package layouts and offline finalization flow, digest correlation/tamper evidence, complete behavior-to-test catalog, all seven parent #29 acceptance mappings, composition handoff/nonclaims, residual gaps, roadmap/index updates, and the conditional #30 handoff. This issue is intentionally left open for PR #60 to close on merge.
Activity
szmyty commentedon Sep 24, 2026
Implementation is complete in draft PR #60 at
d3f6e49fbf8526ad8a109cfdf2e3aa9f926044af.Fresh PR CI run #46 is fully green on repository validators, Rust 1.85, and stable: rustfmt, clippy with warnings denied, all-target tests, Rustdoc, examples, and package verification.
The checkpoint now provides the exact package layouts and offline finalization flow, digest correlation/tamper evidence, complete behavior-to-test catalog, all seven parent #29 acceptance mappings, composition handoff/nonclaims, residual gaps, roadmap/index updates, and the conditional #30 handoff. This issue is intentionally left open for PR #60 to close on merge.