Skip to content

ci(dependabot): remove cooldown and increase open PR limit#130

Merged
crazy-max merged 1 commit into
docker:mainfrom
crazy-max:dependabot-conf
Mar 10, 2026
Merged

ci(dependabot): remove cooldown and increase open PR limit#130
crazy-max merged 1 commit into
docker:mainfrom
crazy-max:dependabot-conf

ci(dependabot): remove cooldown and increase open PR limit

8fe7a0c
Select commit
Loading
Failed to load commit list.
Sign in for the full log view

The logs for this run have expired and are no longer available.