Repository navigation
fix(security): bump certifi to 2026.10.19 (CVE-2026-111943) - #12
TechnoFinch wants to merge 2 commits into
Conversation
Broly Security ScanWarning Latest baseline snapshot is stale. Broly is running in PR-only fallback mode until the next scheduled baseline refreshes. This does not block the PR. Note Summary 1 actionable finding(s) in this PR
Main table: 1 shown, 0 omitted of 1 actionable finding(s) above the reporting threshold. See the repository Security tab for the full set. No finding is at or above
Dismiss false positivesTick a box to dismiss the finding; untick it to bring the finding back. That is the same as replying
Note Re-scan this PR anytime with
|
Bump black to 26.x, aiohttp to 3.14.x, urllib3 to 2.8.x, requests to 2.34.x, requests-unixsocket to 0.4.1, idna to 3.20 and sh to 2.4.0. Depend on gitlint-core directly so sh is no longer pinned to 1.14.3.
Bumps certifi to 2026.10.19, which removes the emSign ECC Root CA - G3 following the compromise of eight eMudhra intermediate CA keys (CVE-2026-111943).
Only the affected pins changed. Takes effect after rebuild + redeploy; container images should also pick up the updated OS
ca-certificatespackage.