Repository navigation
merge queue: checking #2214 on master (c01ab51), stacked on #2189, #2190 and #2200 - #2215
Closed
mergify[bot] wants to merge 8 commits into
Closed
mergify[bot] wants to merge 8 commits into
mergify[bot] wants to merge 8 commits into
Conversation
The global limit of 64 specializations per module rejected finite designs with many independently parameterized siblings, including the HTG9200 statistics collectors. Track the instantiation parent of newly discovered specializations and apply the existing budget to repeated module names along that chain instead. Allow 65 independent sibling specializations in pure SystemVerilog and mixed Veryl/SystemVerilog hierarchies. Parameter-changing recursion remains bounded and identical-specialization cycles retain the existing hierarchy checks. This does not resolve the remaining full-board compilation performance problem. Validation: 5,685 SystemVerilog tests passed (20 existing skips), 7 frontend unit tests passed, affected frontend/Celox clippy with warnings denied, formatting and diff checks. The new shared sibling case passed Icarus and Verilator; the existing recursive elaboration regression also passed. Change-Id: I3c2330c0973e79f5ff44f5f5e646147a65d14cc6
VPI builds first compiled an untimed Simulator image and, after detecting a process, repeated frontend analysis and SIR optimization with Simulation. Compile the process-capable Simulation native image directly for both process-free and process-containing SystemVerilog DUTs. Keep the configured optimization level, diagnostics, parameter overrides and signal access settings. This removes the complete Simulator-to-Simulation retry without disabling optimization. Large VCU108 and HTG9200 native compilations remain a performance issue; this change does not claim that all Taxi configurations or runtime tests pass. Validation: 166 normal celox-vpi tests passed, all eight explicitly selected cocotb tests passed, affected VPI clippy with warnings denied, formatting and diff checks. Cocotb coverage includes a process-free flip-flop, DUT processes, edge/NBA ordering, force/release, unpacked arrays, finish and femtosecond clocks. Change-Id: I6439f16cd7cc0f3b26019b6c8bccb526b7fb1302
Update only zstd-sys from 2.0.16+zstd.1.5.7 to 2.1.2+zstd.1.5.7. This removes RUSTSEC-2026-0410 from the workspace dependency audit, covering the upstream wasm allocator fix without adding vendor patches or advisory exclusions. This is a partial remediation: cargo-deny still reports RUSTSEC-2026-0391, RUSTSEC-2026-0398, and RUSTSEC-2026-0403 for zstd 0.13.3 and zstd-safe 7.2.4. The latest include-flate-compress 0.3.4 and wasmtime-internal-cache 50.0.0 still require zstd ^0.13, preventing resolution to fixed zstd 0.14.3 / zstd-safe 8.2.0. Keep this PR in draft while those upstream constraints remain; the advisory gate is unchanged. No downstream minimum version is imposed by a workspace lockfile update. Security-only Cargo update automation is handled independently in #2199 so it can land without this remaining advisory failure. Validation: celox-backend-wasm library tests (7 passed); include-flate-compress compiled against the updated chain; workspace/all-target cargo check with the CI feature configuration, including native/Cranelift/Wasmtime and external-suite adapters (excluding the disabled lydite-celox bridge); cargo-deny bans/licenses/sources passed; advisories reduced from 4 to the 3 documented above. Advisory/version verification was used instead of an allocator-exhaustion exploit reproduction. Change-Id: I510c5d926178a7c3441caaf5f40740cab1c584da
Add merge-priority for requests that should pass waiting ordinary PRs while allowing running checks to finish. Assign priority 9000 with interruption disabled, below merge-urgent's 10000 and above lightweight changes. The first matching rule makes merge-urgent win when both labels are present. Both labels use the same guarded merge-ready authorization, preserving required checks, holds, conflicts, drafts, and the dequeue latch. Document their distinct behavior and withdrawal procedure. The merge-priority repository label has been created; its queue behavior activates after this configuration is merged. Validation: mergify config validate; 38 Mergify and CI-classifier tests passed; git diff --check. No PR was queued or merged for validation. Change-Id: Ib8ed2198d9309dc9f530a37264d5418a8092c40d
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Note
This is a merge queue draft opened by Mergify. Nobody needs to act on it.
Mergify opened it for batch purple-caprice-7cay6o of the
changesqueue, to test #2214 before it merges intomaster. Pushing to this branch or closing this pull request removes #2214 from the queue.What this draft tests
Mergify checks that #2214 still passes CI once combined with everything queued ahead of it. CI runs on this draft's code, built in this order:
masteratc01ab518985b91Impacts all scopes — this batch runs alone and serializes the queue, so it is queued behind everything already in it.
The check is speculative: it assumes the pull requests ahead will merge, so it starts without waiting for them.
🎉 Where it stands: checks passed
CI passed on this draft.
Follow the
changesqueue in the dashboardWhat happens next
masterand closes this draft.Tip
A red check is not necessarily caused by this batch. These checks run on a tip that also carries the commits of the 3 pull requests ahead, so a failure here can come from them as much as from #2214. See only this batch's changes.
Queued ahead of this batch
These pull requests entered the queue before this batch and are not part of it.
Metadata for CI tooling, read by
mergify ciRequired conditions of queue rule
changesfor mergecheck-success = Conventional Commit titlecheck-success = Queue validationmaster]:check-success = @github-actions/Lint & Formatcheck-neutral = @github-actions/Lint & Formatcheck-skipped = @github-actions/Lint & Formatmaster]:check-success = @github-actions/NAPI Build (Linux ARM64 GNU)check-neutral = @github-actions/NAPI Build (Linux ARM64 GNU)check-skipped = @github-actions/NAPI Build (Linux ARM64 GNU)master]:check-success = @github-actions/NAPI Build (Windows)check-neutral = @github-actions/NAPI Build (Windows)check-skipped = @github-actions/NAPI Build (Windows)master]:check-success = @github-actions/Rust Test & NAPI Buildcheck-neutral = @github-actions/Rust Test & NAPI Buildcheck-skipped = @github-actions/Rust Test & NAPI Buildmaster]:check-success = @github-actions/JS Test (Ubuntu)check-neutral = @github-actions/JS Test (Ubuntu)check-skipped = @github-actions/JS Test (Ubuntu)master]:check-success = @github-actions/JS Test (Windows)check-neutral = @github-actions/JS Test (Windows)check-skipped = @github-actions/JS Test (Windows)master]:check-success = @github-actions/Conventional Commit titlecheck-neutral = @github-actions/Conventional Commit titlecheck-skipped = @github-actions/Conventional Commit titleRequired conditions to stay in the queue
-conflict-draft-head ~= ^(integration/|renovate/veryl-crates$|upgrade/veryl-|release-please--branches--master--components--celox$|master$)-head ~= ^renovate/-label = release:holdbase ~= ^(master|develop)$base ~= ^stack/body ~= (?m)^Depends-On:head != release-please--branches--master--components--celoxlabel = merge-readymaster]:check-success = @github-actions/Lint & Formatcheck-neutral = @github-actions/Lint & Formatcheck-skipped = @github-actions/Lint & Formatmaster]:check-skipped = @github-actions/NAPI Build (Linux ARM64 GNU)check-neutral = @github-actions/NAPI Build (Linux ARM64 GNU)check-success = @github-actions/NAPI Build (Linux ARM64 GNU)master]:check-skipped = @github-actions/NAPI Build (Windows)check-neutral = @github-actions/NAPI Build (Windows)check-success = @github-actions/NAPI Build (Windows)master]:check-skipped = @github-actions/Rust Test & NAPI Buildcheck-neutral = @github-actions/Rust Test & NAPI Buildcheck-success = @github-actions/Rust Test & NAPI Buildmaster]:check-skipped = @github-actions/JS Test (Ubuntu)check-neutral = @github-actions/JS Test (Ubuntu)check-success = @github-actions/JS Test (Ubuntu)master]:check-skipped = @github-actions/JS Test (Windows)check-neutral = @github-actions/JS Test (Windows)check-success = @github-actions/JS Test (Windows)master]:check-success = @github-actions/Conventional Commit titlecheck-neutral = @github-actions/Conventional Commit titlecheck-skipped = @github-actions/Conventional Commit titleQueue graph
The diagram is not laid out in queue order, so a node's position says nothing about when it merges.
graph LR a55db9b7df1d4f46961c614ecba6c958["purple-caprice-7cay6o<br/>#2214<br/>all scopes"] c6f29ee84bc5444a89575612e0a7509f["imaginary-miche-iiar7o<br/>#2194 + #2204 + #2205<br/>scopes: core"] a55db9b7df1d4f46961c614ecba6c958 --> c6f29ee84bc5444a89575612e0a7509f style a55db9b7df1d4f46961c614ecba6c958 fill:#6366f1,color:#fff