Skip to content

merge queue: checking #2009 + #1995 + #2000 together on master (25b0177), stacked on #1989 - #2017

Closed
mergify[bot] wants to merge 8 commits into
masterfrom
mergify/merge-queue/ddf9fcd65f
Closed

mergify[bot] wants to merge 8 commits into
masterfrom
mergify/merge-queue/ddf9fcd65f

Conversation

@mergify

@mergify mergify Bot commented Oct 25, 2026 •

Copy link
Copy Markdown
Contributor

Note

This is a merge queue draft opened by Mergify. Nobody needs to act on it.
Mergify opened it for batch optimistic-choucroute-aoxstb of the changes queue, to test #2009, #1995 and #2000 before they merge into master.

What this draft tests

Mergify checks that #2009, #1995 and #2000 still pass CI once combined with everything queued ahead of them. CI runs on this draft's code, built in this order:

  1. master at 25b0177
  2. the pull request queued ahead of this batch, listed below, which brings the tip to bd6799b
  3. #2009 + #1995 + #2000, the pull requests of this batch, tested together as one tip

The check is speculative: it assumes the pull requests ahead will merge, so it starts without waiting for them.

🕵️ Where it stands: failed, splitting the batch

The checks of this draft failed. Mergify splits this batch to find which pull request is responsible.

Follow the changes queue in the dashboard

What happens next

  • Mergify checks smaller batches of #2009, #1995 and #2000 until it finds which pull request is responsible.

Tip

A red check is not necessarily caused by this batch. These checks run on a tip that also carries the commits of the pull request ahead, so a failure here can come from it as much as from #2009 + #1995 + #2000. See only this batch's changes.

Queued ahead of this batch

This pull request entered the queue before this batch and is not part of it.

Metadata for CI tooling, read by mergify ci
---
all_scopes: false
checking_base_sha: bd6799be39b22896716b15a8e74760d6b4810ea1
previous_check_retries: []
previous_failed_batches: []
pull_requests:
  - number: 2009
    scopes:
      - core
  - number: 1995
    scopes:
      - core
  - number: 2000
    scopes:
      - core
scopes:
  - core
...
1 scope
  • core
Required conditions of queue rule changes for merge
  • check-success = Queue validation
  • any of [🛡 GitHub repository ruleset rule master]:
    • check-neutral = @github-actions/Rust Test & NAPI Build
    • check-skipped = @github-actions/Rust Test & NAPI Build
    • check-success = @github-actions/Rust Test & NAPI Build
  • check-success = Conventional Commit title
  • any of [🛡 GitHub repository ruleset rule master]:
    • check-success = @github-actions/Lint & Format
    • check-neutral = @github-actions/Lint & Format
    • check-skipped = @github-actions/Lint & Format
  • any of [🛡 GitHub repository ruleset rule master]:
    • check-success = @github-actions/NAPI Build (Linux ARM64 GNU)
    • check-neutral = @github-actions/NAPI Build (Linux ARM64 GNU)
    • check-skipped = @github-actions/NAPI Build (Linux ARM64 GNU)
  • any of [🛡 GitHub repository ruleset rule master]:
    • check-success = @github-actions/NAPI Build (Windows)
    • check-neutral = @github-actions/NAPI Build (Windows)
    • check-skipped = @github-actions/NAPI Build (Windows)
  • any of [🛡 GitHub repository ruleset rule master]:
    • check-success = @github-actions/JS Test (Ubuntu)
    • check-neutral = @github-actions/JS Test (Ubuntu)
    • check-skipped = @github-actions/JS Test (Ubuntu)
  • any of [🛡 GitHub repository ruleset rule master]:
    • check-success = @github-actions/JS Test (Windows)
    • check-neutral = @github-actions/JS Test (Windows)
    • check-skipped = @github-actions/JS Test (Windows)
  • any of [🛡 GitHub repository ruleset rule master]:
    • check-success = @github-actions/Conventional Commit title
    • check-neutral = @github-actions/Conventional Commit title
    • check-skipped = @github-actions/Conventional Commit title
Required conditions to stay in the queue
Queue graph

The diagram is not laid out in queue order, so a node's position says nothing about when it merges.

graph LR
    9d3a85edc6804ad4ba22703c99230087["optimistic-choucroute-aoxstb<br/>#2009 + #1995 + #2000<br/>scopes: core"]
    75bff5c0962f421c8a802c08d5c9fc52["adventurous-tourte-33h9d6<br/>#2014<br/>scopes: core"]
    9d3a85edc6804ad4ba22703c99230087 --> 75bff5c0962f421c8a802c08d5c9fc52
    style 9d3a85edc6804ad4ba22703c99230087 fill:#6366f1,color:#fff
Loading

tignear and others added 8 commits October 25, 2026 20:45
…ep comparison

The native backend found an existing task for each trigger by comparing
its unit list with every task so far, unit by unit and block by block. An
unfused comb-apply task starts with all of `eval_comb`, so each comparison
walked the whole combinational program: O(triggers^2 x program size). On
C906 the backend sat in compile_program for 19+ minutes, mostly in memcmp
and HashMap<BlockId, BasicBlock>::eq.

Each distinct execution unit is now hashed once and assigned a class of
structurally equal units, and tasks are looked up by their list of
classes. Two unit lists have the same classes exactly when they compare
equal, and tasks are visited in the same order, so the tasks, their
order and their bindings are the same as before and the generated code
does not change.

Closes #1982

Change-Id: I03837ef8fa9804562d781436411449be6cb1c9b8
…locks

Closes #2004

Change-Id: I25c5836030d05db672adcb2159c9aa2fdb9e7890
## Summary

Ordinary native builds and tests currently pull in Cranelift and Wasmtime through both host-runtime and the upstream Veryl simulator. Make these dependencies opt-in with cranelift, wasm-runtime, wasm-component and veryl-reference features. Native, interpreter and tiered execution remain available by default.

Move lightweight Cranelift policy types into the common backend crate, forward features through CLI/NAPI, and select application packages as workspace defaults. Gate explicit comparison tests and generate common test matrices for enabled backends. Published native NAPI binaries explicitly retain WASM-component support.

Keep the existing default/full CI lanes and their backend coverage. No feature-combination CI matrix is added; additional local combination checks were stopped as requested.

## Validation

- On the updated master base: 147 default library tests, 5 tiered integration tests, and 18 Cranelift-enabled tiered unit tests passed. Celox/NAPI library Clippy, ARM64 cross-target cargo check, and formatting passed.

- Formatting, Biome, workflow YAML parsing and repository script tests, including a regression asserting that default build/test dependency trees contain no Cranelift, Wasmtime or Veryl reference simulator.
- Workspace cargo check (excluding lydite-celox); all-target Clippy for default applications and for affected crates with full execution/reference features.
- No-default-features library check and wasm32-unknown-unknown browser binding check using a WASM-capable Clang.
- Default counter, tiered and injected-component integration tests: 15 passed. Component unit tests: 3 passed with default features and 3 passed with wasm-component.
- Native NAPI debug build and TypeScript injected-component integration tests: 3 passed.
- Rust API documentation for celox and celox-backend-common.

Shared executable cases and external adapters are unchanged, so external simulator comparisons were not rerun.

BREAKING CHANGE: Cranelift/WASM execution APIs and WASM component hosting now require their corresponding Cargo features. Full workspace and reference comparison builds must be requested explicitly.

Change-Id: I890f4c0f7c9901dda4402ae415566788d6868982
Closes #1991

Change-Id: Ied3fc477003f360c2ea17b71e19b6fd1a4559abb
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant