Repository navigation
ci: run Veryl proof gates only weekly or manually - #1337
Merged
Merged
Conversation
Codex Review SummaryThis comment shows the latest Codex review activity on this pull request.
ℹ️ About Codex in GitHubYour team has set up Codex to review pull requests in this repo. Reviews are triggered when you
Codex reacts with 👀 while any review is running, comments if it has suggestions, and reacts with 👍 once all reviews finish with no findings. |
Contributor
Merge Queue Status
This pull request spent 1 hour 30 minutes 40 seconds in the queue, including 46 minutes 25 seconds running CI. Required conditions to merge
|
38 of 66 tasks
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
veryl-fvandveryl-proof-corpusconsumed runners on merge-queue drafts and develop pushes even though neither is required by the master/develop rulesets or Mergify'sQueue validationcheck.Run these two jobs only on the existing weekly schedule (Monday 03:41 UTC) and manual dispatch. Documentation, editor, and Celox replay checks retain their existing triggers. Update CONTRIBUTING to distinguish the optional lydite checks from required queue validation. Develop receives this workflow change through the master-to-develop sync.
Validation: 20 event/job combinations verified (PRs, queue drafts, pushes, and merge groups skip; schedule/manual run); 17 related CI/Mergify tests passed; actionlint passed with only its obsolete runner-label warning for the existing ubuntu-26.04 label excluded. All pre-push checks passed, including formatting, lint, and locked workspace cargo check. Proof workloads were not rerun because their commands are unchanged.