Repository navigation
Description
Problem
The accepted Base governance design and implementation plan identify package 8/O10 as a required deliverable. This issue translates that package into a reviewed, bounded issue/PR train; it does not authorize implementation before the issue reaches Ready.
Expected behavior
Review docs/community-triage.md against the accepted internal lifecycle, where Triage follows Backlog and means analysis/readiness work. Decide whether public community intake guidance should stay distinct, be clarified, or be updated. This is a decision/recommendation issue; do not change public wording until the maintainer accepts the disposition.
Scope and non-goals
Scope: Review docs/community-triage.md against the accepted internal lifecycle, where Triage follows Backlog and means analysis/readiness work. Decide whether public community intake guidance should stay distinct, be clarified, or be updated. This is a decision/recommendation issue; do not change public wording until the maintainer accepts the disposition.
Non-goals: Do not silently expand scope, activate unreviewed policy, mirror issue fields onto PRs, grant agents merge/release authority, or make changes outside the named affected areas. Any new product decision or materially new work gets a separate issue and decision record.
Affected areas
- docs/community-triage.md and docs/github-workflow.md (review only).
- Accepted source: governance design and implementation plan, PR #2664
- Parent tracker: #2665
Impact and evidence
- Product intent: Implements only the accepted governance design and plan; any product-requirement change must be filed separately.
- Architecture and contracts: Destination is the package-specific section of the merged governance design/implementation plan plus the affected canonical contract named above.
- User guidance: The issue identifies likely guidance paths; the implementation PR must name updated user/FAQ/README paths or give a change-specific reason why none is affected.
- CLI/API and reference: The affected-area list determines whether CLI/API/reference docs change; the implementation PR must cite the exact reference path or justify no impact.
- Operations and safety: No privileged automation or merge authority is implied; the PR must list operational/security effects and any rollback.
- Validation and testing: The issue lists the planned tests; the PR must report executed validation and explain any unavailable test.
- Examples and downstream use: The implementation PR must identify affected examples/consumers or give evidence that this change has no downstream surface.
- Governance and contributor process: This package changes or preserves the contributor/governance contract as described in Scope; links must point to the canonical rules.
- Decision records: No new decision is accepted by this issue; any durable deviation requires a proposed decision record and explicit maintainer acceptance.
- Release notes: The PR must include a user-facing release-note line or a reasoned
none; this issue does not pre-decide that disposition.
These are issue-stage dispositions to refine during Triage. Before Ready, every category must have its exact destination or evidence-based no-impact reason; the PR repeats the ten-category evidence for actual changes.
Open questions
- None known. If implementation exposes an unresolved contract, return this issue to Triage and record the decision before implementation continues.
Plan
- S1: One focused PR for this issue. Use
Fixes #Nonly if no additional slice is needed; if the maintainer approves multiple PRs, name eachS1…Snhere before the first is opened and usePart of #N. - Dependencies: None known.
- Acceptance criteria:
- The review compares each public use of triage with the internal Project status and cites exact sections.
- A maintainer-approved disposition is recorded: retain distinct meanings, clarify wording, or propose a separate doc PR.
- No status/schema or community doc change is made without that recorded decision.
- Any implementation follow-up is filed as a separate issue/PR with an impact map.
- Validation:
- Read the current community guide and internal workflow/status definitions at the reviewed revisions.
- Check the proposed disposition for contributor-facing ambiguity and link validity.
- Risks and rollback: Public and internal uses of triage may be conflated; preserve separate terms or clearly label context. No rollback needed until a later doc PR.
- Decision impact: No decision is accepted merely by implementing the issue. Record the relevant accepted decision/ADR and file a superseding record if the maintainer approves a change.
Metadata
Metadata
Assignees
Labels
Type
Projects
- StatusShow more project fieldsBacklog
Activity
codeforester commentedon Nov 11, 2026
Pre-Triage review against the accepted plan (#2664, tracker #2665)
.github/ISSUE_TEMPLATE/support.ymland the chooser links inconfig.ymlin the review. They are the public intake path. Also includetests/test_community_triage_docs.py, which asserts the current wording.Contract text. The Impact, Scope and Open questions sections are still the shared template text. The Impact section is identical in 24 of #2666–#2690, and Scope repeats Expected behavior. That's fine in Backlog. Before Ready, replace each with this issue's own dispositions. This issue is small, but category 3 (public contributor guidance) has a real impact. Name the paths it affects.
Claude Code (Opus 5.5), reviewing from Ramesh's account at his request. This review comes before Triage, so it is not an issue-loop round.