Repository navigation
Description
Problem
The accepted Base governance design and implementation plan identify package 1 as a required deliverable. This issue translates that package into a reviewed, bounded issue/PR train; it does not authorize implementation before the issue reaches Ready.
Expected behavior
Define canonical homes and owners for the PRD, area-level designs, detailed contracts, user and reference docs, README/FAQ, operations/security guidance, decisions, release notes, examples, and derived context. Add an ADR template/index and decision-capture instructions. Compare the PRD with maintainer intent; any product correction is a separate issue/PR. Include all ten D23 editorial fixes from the final review: correct good first issue/help wanted spelling; restore the named Project views; use actual GitHub close reasons; state CHANGELOG is repository-local; clarify .github/ hand-editing until a generator exists; clarify retained Rejected ADRs and typo edits; prohibit agents from posting overrides; use the merged Risk, rollback and notes heading; add Part of #N to the PR prompt; and backtick command names.
Scope and non-goals
Scope: Define canonical homes and owners for the PRD, area-level designs, detailed contracts, user and reference docs, README/FAQ, operations/security guidance, decisions, release notes, examples, and derived context. Add an ADR template/index and decision-capture instructions. Compare the PRD with maintainer intent; any product correction is a separate issue/PR. Include all ten D23 editorial fixes from the final review: correct good first issue/help wanted spelling; restore the named Project views; use actual GitHub close reasons; state CHANGELOG is repository-local; clarify .github/ hand-editing until a generator exists; clarify retained Rejected ADRs and typo edits; prohibit agents from posting overrides; use the merged Risk, rollback and notes heading; add Part of #N to the PR prompt; and backtick command names.
Non-goals: Do not silently expand scope, activate unreviewed policy, mirror issue fields onto PRs, grant agents merge/release authority, or make changes outside the named affected areas. Any new product decision or materially new work gets a separate issue and decision record.
Affected areas
- docs/governance/DESIGN.md, docs/governance/IMPLEMENTATION-PLAN.md, the canonical docs index, and the ADR template/index location selected by the design.
- Accepted source: governance design and implementation plan, PR #2664
- Parent tracker: #2665
Impact and evidence
- Product intent: Implements only the accepted governance design and plan; any product-requirement change must be filed separately.
- Architecture and contracts: Destination is the package-specific section of the merged governance design/implementation plan plus the affected canonical contract named above.
- User guidance: The issue identifies likely guidance paths; the implementation PR must name updated user/FAQ/README paths or give a change-specific reason why none is affected.
- CLI/API and reference: The affected-area list determines whether CLI/API/reference docs change; the implementation PR must cite the exact reference path or justify no impact.
- Operations and safety: No privileged automation or merge authority is implied; the PR must list operational/security effects and any rollback.
- Validation and testing: The issue lists the planned tests; the PR must report executed validation and explain any unavailable test.
- Examples and downstream use: The implementation PR must identify affected examples/consumers or give evidence that this change has no downstream surface.
- Governance and contributor process: This package changes or preserves the contributor/governance contract as described in Scope; links must point to the canonical rules.
- Decision records: No new decision is accepted by this issue; any durable deviation requires a proposed decision record and explicit maintainer acceptance.
- Release notes: The PR must include a user-facing release-note line or a reasoned
none; this issue does not pre-decide that disposition.
These are issue-stage dispositions to refine during Triage. Before Ready, every category must have its exact destination or evidence-based no-impact reason; the PR repeats the ten-category evidence for actual changes.
Open questions
- None known. If implementation exposes an unresolved contract, return this issue to Triage and record the decision before implementation continues.
Plan
- S1: One focused PR for this issue. Use
Fixes #Nonly if no additional slice is needed; if the maintainer approves multiple PRs, name eachS1…Snhere before the first is opened and usePart of #N. - Dependencies: None known.
- Acceptance criteria:
- The canonical document taxonomy, locations, ownership and navigation rules match the accepted governance design and current repository layout.
- The ADR lifecycle distinguishes proposed, accepted, rejected, superseded and retained records; accepted records are immutable except for corrections allowed by the design.
- The decision-capture rule and ADR index/template are discoverable from the canonical process map.
- The PRD review yields either no change with evidence or a separately tracked correction; this issue does not silently rewrite product intent.
- All ten final-review editorial nits listed in Scope are corrected and verified against the relevant design sections.
- The merged design and plan state that the proposal is accepted, and the plan points to Track implementation of the accepted Base governance plan #2665 as the implementation tracker while retaining Revise the Base ecosystem governance design and implementation plan #2663 only as the closed design-review record.
- Validation:
- Check all local Markdown links and anchors touched by the PR.
- Run documentation contract/link checks and
git diff --check. - Review the ten D23 items against the merged design and verify each has a concrete correction.
- Risks and rollback: A location choice can create duplicate sources of truth; make one canonical path and link to it. Revert the documentation PR if maintainers reject the location/ownership contract.
- Decision impact: No decision is accepted merely by implementing the issue. Record the relevant accepted decision/ADR and file a superseding record if the maintainer approves a change.
Metadata
Metadata
Assignees
Labels
Type
Projects
- StatusShow more project fieldsBacklog
Activity
codeforester commentedon Nov 11, 2026
Pre-Triage review against the accepted plan (#2664, tracker #2665)
Part of #N, L306;.github/files, L643.governance/. Design §15.1 has no such directory, and standards stay inSTANDARDS.md..githubis tracked through Adopt the governance profile in the organization configuration repository #2685.basectl release notesdoesn't exist. It does, as a read-only changelog extractor; see Assemble release notes from reviewed pull request entries #2670..ai-context/DECISIONS.mdinto ADRs (design L411) happens here or in Inventory canonical documents and their owners #2675.Contract text. The Impact, Scope and Open questions sections are still the shared template text. The Impact section is identical in 24 of #2666–#2690, and Scope repeats Expected behavior. That's fine in Backlog. Before Ready, replace each with this issue's own dispositions. Likely impacts here: categories 8 (
docs/github-workflow.md,CONTRIBUTING.md), 9 (the new ADR template and index) and 3 (thedocs/README.mdindex).Claude Code (Opus 5.5), reviewing from Ramesh's account at his request. This review comes before Triage, so it is not an issue-loop round.
Replace the governance implementation plan with the staged release pl…