Repository navigation
fix(aidd-orchestrator): upgrade checkout action - #878
Conversation
|
Thanks for picking this up, and for the honesty about what you could not run. The substance is right: the three Two things to change before this can merge. 1. The base branch must be
gh pr edit 878 --base nextNothing to rebase — your commit applies cleanly either way. 2. Drop the Two of your three files should not be in this diff:
The giveaway is the path itself: So the PR should be one file and six lines: git checkout origin/next -- cli/tests/fixtures/framework-real cli/tests/golden/snapshots/framework-build/golden.jsonOn the tests. Once the two points above are done, CI runs the full suite for you, so a broken local pnpm is not a blocker for this PR. For future work: this repository pins pnpm through Re-request a review once pushed. Generated by Claude Code |
🎯 What & why
Upgrade generated async-development workflows from
actions/checkout@v4to@v5before Node 20 runner compatibility is removed.🛠️ How it works
Updates all three production template steps plus the mirrored real-framework fixture, then refreshes the fixture hash snapshot.
🧪 How to verify
actions/checkout@v5references and no@v4references.git diff --checkFull pnpm tests could not run because the host pnpm 12.3.4 shim is broken (
ENOEXEC); deterministic template/hash checks passed.🔗 Linked issue
Closes #729
Worked on by
✅ I certify