ci: consolidate PR CI, run every test target, build the shipped binary - #269

Merged
Nic-dorman merged 3 commits into
mainfrom
nic/v2-1811-ci-consolidation
Nov 3, 2026
Merged

Nic-dorman merged 3 commits into
mainfrom
nic/v2-1811-ci-consolidation

Conversation

@Nic-dorman

@Nic-dorman Nic-dorman commented Nov 3, 2026 •

Copy link
Copy Markdown
Member

Linear issue

Closes V2-1811
Closes V2-1804
Closes V2-1805

Summary

Rebased onto main (#267, #268 and #270 have merged), so the diff against main is this PR's change alone. Draft until a re-review of the current head and a green CI run. It follows the same layout as saorsa-transport #226 (V2-1757, merged 2026-11-02).

From the ant-node CI audit (V2-1799). PR CI was 17 jobs (2 macOS, 2 Windows), about 200 job-minutes, and it still:

  • never ran 46 tests: pointer_convergence, poc_d1_bounded_queues and poc_price_floor_live, three webrtc_direct_devnet tests gated on test-utils that no step could reach, the bin unit tests, and the doc tests (V2-1804)
  • never built the shipped configuration: Build ×3 compiled --release --no-default-features, which nobody ships (V2-1805)

After this PR: 12 jobs (1 macOS, 1 Windows), and every test target runs.

Job Contents
Quick checks fmt, clippy (all targets, all features), check --lib --no-default-features, cargo doc
Rust 1.95 MSRV unchanged
Third-party notices unchanged
Test (ubuntu / macOS / windows) lib + bin unit tests; every integration target from cargo metadata, run one at a time, each required to pass ≥1 test; Linux also runs doc tests, the ignored five-node devnet test and the no-default-features lib tests
Storage on ext4 / xfs / btrfs unchanged
Build release (x86_64-unknown-linux-musl) the linux-x64 binary built exactly as release.yml builds it (default features, musl, cross); the no-failpoint check now runs on that binary
Security Audit unchanged, outside the gate until V2-1800 (it reds every PR on RUSTSEC-2026-0387, V2-1743)
CI Gate needs everything above except Security Audit; fails unless all succeeded (skipped or cancelled counts as a failure). This is the one check to make required (V2-1801)

Where every removed job went

Was Now
Format Check, Clippy, Documentation Quick checks
Test (no logging): check --lib --no-default-features Quick checks
Test (no logging): test --lib --no-default-features a Linux step in Test (ubuntu)
WebRTC Direct five-node devnet (--ignored) a Linux step in Test (ubuntu), sharing its build
Build ×3 (--release --no-default-features) Build release (musl, default features). macOS and Windows default features are still compiled by their Test jobs
Build (ubuntu): the no-failpoint check on a debug binary Build release: the same check on the release binary that ships
Test: hand-written --test X list (7 of 10 targets) the cargo metadata loop (10 of 10 targets)
Test: webrtc_direct_devnet without test-utils the loop runs it with test-utils, so its 3 gated tests run too

Coverage deliberately not kept: a release-profile build on macOS and Windows (their debug builds of default features still run), and a release build of the aarch64 targets (neither was built on PRs before).

One test ignored: poc_price_floor_live::enforced_floor_rejects_cheapest_of_k_real_settlement now has #[ignore], with its reason. It has failed deterministically since the close-group floor rework, and fixing it is V2-1803. Without the ignore, running every target would red every PR. The file's other two tests run.

build.rs: the fix for the crate recompiling on every cargo invocation, found while measuring this PR, landed separately as #270 (V2-1828). That's why every target can afford to run as its own cargo test --test X here.

After the first review (70a8359, now ff61461):

  • GitHub runs shell: bash with -e, so the loop stopped at the first failing target. It now turns -e off, runs every target and fails at the end with the full list.
  • storage_scale is Linux-only again, as in the old ci.yml. Its timing gates were measured on Linux, and it failed on Windows.

Measured on 70a8359 (before the rebase; same ci.yml) against main's medians: Test ubuntu 24 min (was 37), macOS 18 min (was 45). Windows is still to come.

Not changed: pr-checks.yml, adr-governance.yml, release.yml, and the on: triggers (still PR-only, as V2-1353 set).

Open question (V2-1811): most of the remaining cost is e2e on macOS and Windows (45 and 57 min). If we drop e2e from one of them we'd get under 100 job-minutes. That's a call for Nic and Chris; this PR keeps today's coverage.

Risk tier

  • T0 — docs / tooling / CI / pure UX-output. Repo CI only.
  • T1 — client-only, no network-facing behavior change. CI + prod compat smoke.
  • T2 — node/client logic with behavioral surface, no protocol/format/economics change. Dev testnet + ADR.
  • T3 — protocol / storage format / payments / routing. T2 evidence + adversarial testing.

Compatibility

  • Wire: none
  • Storage: none
  • API: none

Semver impact

  • breaking
  • feature
  • fix

Test evidence

  • On dev2 at 02c8682 (Linux, cargo 1.95.0), every target this newly runs passes: pointer_convergence 17/17, poc_d1_bounded_queues 7/7, the 3 gated webrtc_direct_devnet tests 3/3, bins 15/15, and the doc test (1 pass, 2 rustdoc-ignored). poc_price_floor_live has 2 passes and 1 deterministic failure, now ignored (V2-1803).
  • The ci.yml parses (PyYAML). The integration loop passes bash -n. The cargo metadata + jq filter lists all 10 integration targets locally. The gate's jq expression returns false when one need is skipped and true when all succeeded.
  • This PR's own CI run is the live test, macOS and Windows especially, because the newly run targets have only been run on Linux so far. Security Audit is expected to fail (V2-1743) and is outside the gate.

New dependency

none (no new crates or actions; cross is installed the way release.yml installs it)

ADR

n/a

Mitigation / rollback

Revert the commit. #268 (concurrency + timeouts) stands on its own.

🤖 Generated with Claude Code

@MaidSafe-Hermes MaidSafe-Hermes left a comment

Copy link
Copy Markdown

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Reviewing WithAutonomi/ant-node@a8e4cb123bf096ccd4e9405f90738a63baf8c480. The review panel found one actionable CI-control defect; I confirmed the Bash behavior with a failing-pipeline reproduction.

The integration loop exits on its first failing target. With shell: bash, GitHub Actions runs Bash with -e -o pipefail; therefore, when this cargo test | tee pipeline fails, errexit terminates the step before the next status=${PIPESTATUS[0]} assignment. Later targets then do not run, despite the comment saying they all run after a failure, and Linux-only test steps are skipped. I reproduced this with bash --noprofile --norc -e -o pipefail: false | tee exits 1 before the status assignment.

Minimum fix: handle the pipeline in an if/else (or otherwise disable errexit for that command), capture the cargo and tee statuses, then continue the loop and fail at the end.

Panel coverage: 2/2 seats completed (sol-1 gpt-6.1-sol xhigh: CHANGES_REQUIRED; glm-1 z-ai/glm-5.3: UNCERTAIN). The seats differed on this shell behavior; I verified it locally as above.

CI at review: Ubuntu test job passed; macOS and Windows test jobs were still running. Other required jobs observed passed. Security Audit failed on the documented advisory and is outside the gate. PR #268 remains open, and this PR is draft.

Comment thread .github/workflows/ci.yml

filesystems:
name: Storage on ${{ matrix.fs }}
runs-on: ubuntu-latest

Copy link
Copy Markdown

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

The integration loop exits on its first failing target. With shell: bash, GitHub Actions runs Bash with -e -o pipefail; therefore, when this cargo test | tee pipeline fails, errexit terminates the step before the next status=${PIPESTATUS[0]} assignment. Later targets then do not run, despite the comment saying they all run after a failure, and Linux-only test steps are skipped. I reproduced this with bash --noprofile --norc -e -o pipefail: false | tee exits 1 before the status assignment.

Minimum fix: handle the pipeline in an if/else (or otherwise disable errexit for that command), capture the cargo and tee statuses, then continue the loop and fail at the end.

Nic-dorman added a commit that referenced this pull request Nov 3, 2026
… every cargo run

build.rs declared rerun-if-changed for .git/HEAD, .git/refs/heads and
.git/packed-refs. Cargo treats a path that doesn't exist as changed on
every build, so whenever one was missing the script reran and ant-node
was recompiled from scratch on each cargo invocation. That happens in a
git worktree (.git is a file) and in CI checkouts: on PR #269 every
`cargo test --test X` spent ~2m20s recompiling ant-node for a test binary
the previous step had already built, 10 times per job; the old per-target
CI steps paid the same cost.

The script now asks git for the real git dir and common dir, and only
watches the paths that exist. ANT_GIT_COMMIT is still refreshed when HEAD
or a branch ref moves.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Nic-dorman and others added 3 commits November 3, 2026 14:45
The PR job set was 17 jobs (2 macOS, 2 Windows), about 200 job-minutes,
and still left tests unrun and the shipped build untested. Now 12 jobs
(1 macOS, 1 Windows) with more coverage:

- Quick checks: fmt, clippy, the no-default-features lib check and docs
  in one job (were Format Check, Clippy, Documentation, plus a step of
  Test (no logging)).
- Test (3 OS): lib and bin unit tests, then every integration target
  read from `cargo metadata`, each required to pass at least one test.
  This picks up the targets CI never ran (pointer_convergence,
  poc_d1_bounded_queues, poc_price_floor_live), the three
  webrtc_direct_devnet tests gated on test-utils that no step could
  reach, and the bin unit tests, and a new tests/*.rs runs without
  editing ci.yml. Linux also runs the doc tests (never run before), the
  ignored five-node devnet test (was its own job) and the lib tests
  without default features (was Test (no logging)).
- Build release: replaces Build x3, which built --release
  --no-default-features, a configuration nobody ships. It now builds the
  linux-x64 binary the way release.yml does (default features, musl,
  cross), and the no-failpoint check runs on that binary.
- CI Gate: needs every job but Security Audit and fails unless all
  succeeded; the one check to require (V2-1801).
- Security Audit is unchanged and outside the gate until V2-1800.

enforced_floor_rejects_cheapest_of_k_real_settlement is marked ignored
with its reason: it has failed since the close-group floor rework
(V2-1803) and would otherwise red every PR now that the target runs.

Closes V2-1811
Closes V2-1804
Closes V2-1805

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Step timings from the last 15 green runs: every integration step except
e2e took 2-5 minutes (ubuntu ~2, macOS ~3, windows ~4.5) for tests that
finish in under a second. The time was each step building and linking its
own test binary in turn. One `cargo test --test '*' --no-run` builds them
all in parallel, and the per-target loop then only runs them.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
…n Linux only

- GitHub runs `shell: bash` steps with -e, so the loop stopped at the first
  failing target instead of running the rest and listing them all. Turn -e
  off for the loop; the step still fails at the end.
- storage_scale's gates compare the store scan against timed directory
  walks measured on Linux, and the old ci.yml only ran it there. Running it
  on Windows failed opening_a_large_store_stays_quick. Skip it off Linux,
  as before.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
@Nic-dorman
Nic-dorman force-pushed the nic/v2-1811-ci-consolidation branch from 70a8359 to ff61461 Compare November 3, 2026 14:46

@MaidSafe-Hermes MaidSafe-Hermes left a comment

Copy link
Copy Markdown

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

APPROVE — the previous CI-loop finding is fixed. I verified that set +e -uo pipefail disables GitHub Actions Bash errexit, and a failing pipeline is recorded while the next target still runs. The new Linux-only storage_scale guard preserves its prior platform scope.

CI Gate and all required jobs passed for this head, including Ubuntu, macOS and Windows tests. The Security Audit failure is outside CI Gate and is not a code-review blocker; track it separately for merge readiness. The poc_price_floor_live enforcement case remains ignored under V2-1803 as disclosed.

Coverage: 2/2 seats reviewed (sol-1 gpt-6.1-sol xhigh; glm-1 z-ai/glm-5.3); both seats agree (two model families).

@Nic-dorman
Nic-dorman marked this pull request as ready for review November 3, 2026 16:16
@Nic-dorman
Nic-dorman merged commit caf0ea5 into main Nov 3, 2026
26 of 30 checks passed
@Nic-dorman
Nic-dorman deleted the nic/v2-1811-ci-consolidation branch November 3, 2026 16:16
grumbach pushed a commit to grumbach/ant-node that referenced this pull request Nov 3, 2026
… every cargo run

build.rs declared rerun-if-changed for .git/HEAD, .git/refs/heads and
.git/packed-refs. Cargo treats a path that doesn't exist as changed on
every build, so whenever one was missing the script reran and ant-node
was recompiled from scratch on each cargo invocation. That happens in a
git worktree (.git is a file) and in CI checkouts: on PR WithAutonomi#269 every
`cargo test --test X` spent ~2m20s recompiling ant-node for a test binary
the previous step had already built, and the per-target steps in today's
ci.yml pay the same cost (2-5 min each for sub-second tests).

The script now asks git for the real git dir and common dir, and only
watches the paths that exist. ANT_GIT_COMMIT is still refreshed when HEAD
or a branch ref moves.

Closes V2-1828

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
grumbach added a commit to grumbach/ant-node that referenced this pull request Nov 3, 2026
Main merged ADR-0020's chunk get-or-closer read (WithAutonomi#249: a node answers
`GetOrCloserRequest` with the chunk or its closest peers, and says so in
its user agent), the consolidated CI (WithAutonomi#269), and build.rs watching only git
paths that exist (WithAutonomi#270).

Conflicts:
- Cargo.toml: main pinned saorsa-core and ant-protocol at ADR-0020
  revisions in a second `[patch.crates-io]` table. This branch's table
  already patches both to their feat/peer-swarm branches, which have merged
  their mains and so carry those revisions, so the one table stays, with
  its comment saying so. Cargo.lock moves both to those branches' new
  heads.
- src/node.rs: both sides added an import from `ant_protocol`.

Beyond the conflicts:
- ant-protocol's main put get-or-closer at wire discriminants 14 and 15,
  where this branch's swarm variants had been; they now follow it, at 16
  to 21. The node tells a swarm request from its header alone
  (`is_swarm_request_bytes`), by those discriminants, so its constants move
  from 14, 16 and 18 to 16, 18 and 20. Left as they were, every
  get-or-closer request would have gone to the swarm rendezvous and stayed
  unanswered. The test that tells swarm requests apart now also checks that
  a get-or-closer request or response is not taken for one, and fails with
  the old constants.
- ADR-0026 gives the new discriminants.

`cargo test --lib` 1255 passed, 1194 without default features (its tests
also build with `-D warnings`); fmt, clippy with all targets and features
and lib-only on Rust 1.99, `cargo check --lib --no-default-features
--locked` and `RUSTDOCFLAGS="-D warnings" cargo doc --no-deps`: clean.
grumbach added a commit to grumbach/ant-node that referenced this pull request Nov 5, 2026
Brings the branch up to main f37429a, which adds pressure-gated retention
(WithAutonomi#271), get-or-closer chunk GETs (WithAutonomi#249), the WebRTC UPnP mapping (WithAutonomi#264) and
listener summary (WithAutonomi#278), and the consolidated PR CI (WithAutonomi#269).

The only conflict was the ADR index: ADR-0024 now sits before main's
ADR-0027 and ADR-0028. None of main's changes touch the fetch scheduler.
grumbach added a commit to grumbach/ant-node that referenced this pull request Nov 5, 2026
Takes the per-source scheduler branch at f568f91, which merged upstream
main f37429a, so this branch carries main's pressure-gated retention
(WithAutonomi#271), get-or-closer chunk GETs (WithAutonomi#249), WebRTC changes (WithAutonomi#264, WithAutonomi#278) and
the consolidated PR CI (WithAutonomi#269) through it.

The only conflict was the ADR index: ADR-0025 now sits before main's
ADR-0027 and ADR-0028. The resulting tree equals a direct merge of this
branch with main apart from that index.
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants