You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
Remove temporary effect-rstest patch after upstream fixes merge #507
The temporary patch carries only upstream PR #4's generic adapter corrections: Effect equality, synchronous schema properties, discarded Effect success values, timed-out test settlement, and shared-layer setup interruption before scope closure. It must not become a permanent fork or compatibility shim.
Pin the released version or immutable merged-commit canary in every consuming workspace manifest.
Remove the effect-rstest entry from patchedDependencies and delete its patch file.
Regenerate pnpm-lock.yaml; verify a frozen install succeeds without the patch.
Verify no @app/effect-rstest alias or vendored implementation is restored.
Run typecheck, lint and lint-rule regressions, unit/component, tooling/generation, and service integration tests with N−1 worker defaults; retain zero browser retries.
Verify equality, schema-property and timeout/finalizer behavior against the actual installed package.
Keep this separate from unrelated dependency upgrades and cleanup work. The upstream CI and canary workflows initially required maintainer approval; a merged PR alone is not proof that a usable package has been published.
Activity
refactor(test): replace vendored runner with patched effect-rstest
Deploy refreshed authorization baseline to stage (#606)
Fix clean Zerops dependency bootstrap (#607)