You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Follow-up to #4135 / #4144. These daemon tests still fail under CPU load. Each needs its root cause found and fixed at the cause: no added sleeps, no widened timeouts.
Tests
//crates/tracedecay-daemon-service:unit_testprofile_host_admission_replay::tests::not_applicable_pending_record_does_not_back_off fails 1 to 2 in 40 loaded runs:
assertion `left == right` failed
left: 3
right: 2
The other tests in profile_host_admission_replay that depend on sleeps.
Status of #4149 after #4167 (daemon-service) and #4174 (crates/tracedecay). The two PRs fix the listed tests. The tests below were left unchanged, with the reason and evidence for each.
linked_roots_alias_one_store_producer_until_the_last_alias_shuts_down and store_shutdown_checkpoint_test::capacity_retirement_completes_while_a_maintenance_tick_runs: both passed 30/30 in a full //crates/tracedecay:daemon_suite round under the recipe (host load average 300 to 900). Earlier evidence shows three linked-roots failure modes, all at extreme host load:
left: 4 (or 1), right: 5 persisted events. The producer drops a batch whose write exceeds the fixed 2 s ObservabilityProducerDeadlinesV1::persistence.
restarted producer: ... delivery_settlement_recorder_already_running. expire_all returned while a timed-out retirement drain still held the store's delivery spool lock.
SQLite transaction lease expired during schema initialization.
The maintenance-tick failure in the 2026-10-16 gates was store runtime still held at shutdown (sessions.db, ClientLeases { count: 2 }). It followed work owner-observation recovery shutdown deadline and observability_persistence_deadline lost work. Store close spent exactly its fixed 3 s hold drain (SHUTDOWN_HOLD_DRAIN_LIMIT, from flaky: graceful stop leaves WAL when store leases are still held at close #4138) with about 9 s of the store-close phase budget left. A candidate production fix is to pass the store-close phase deadline into close_idle_for_shutdown in place of the fixed 3 s. It is not made here, because no current run reproduces the failure.
Real-time deadline tests, left unchanged
shutdown::orchestration::tests::a_stuck_background_owner_cannot_starve_project_servers_or_store_close and a_project_server_drain_that_ignores_its_deadline_hits_the_backstop failed once each in one 30-run round. Both reported left: ["shutdown_coordinator"]: the coordinator deadline (2 s or 4 s) fired before the 50 to 300 ms phase timers. native_runtime has no clock seam. Injecting one would mean threading a timer through coordinate_daemon_shutdown, run_daemon_shutdown and the owner joins, which is not a small local change.
Outside this issue: daemon_suite under the recipe
The same full daemon_suite round failed 22 of 30 runs, all in tests not listed here:
sealed_generation_crash_test::sigkill_during_the_seal_keeps_the_prior_generation_published: 19/30, index never became ready.
git_watch_test::one_reconciliation_covers_a_fifty_commit_frontier: 17/30, timed out waiting for "f49".
store_shutdown_checkpoint_test::stop_after_independent_owners_releases_every_project_store: 10/30, project open never reached independent_owners_registered.
advanced_workflow_journey_test::mounted_fan_out_recovers_then_synthesizes_and_hands_off: 8/30, timed out waiting for project application mount.
Most of these are readiness waits bounded by wall clocks while indexing is CPU-starved. They need their own issue.
Admission time
project_sessions admission is CPU-bound. attach_registered is about 110 ms of wall time and 11 to 13 CPU ticks unloaded. There is no hidden wait, so 1.2 to 7 s under load is starvation.
Activity
ScriptedAlchemy commentedon Oct 17, 2026
Status of #4149 after #4167 (daemon-service) and #4174 (crates/tracedecay). The two PRs fix the listed tests. The tests below were left unchanged, with the reason and evidence for each.
Not reproduced, left unchanged
capacity_retirement_blocked_by_a_foreign_store_lease_is_typed_and_not_replayed: 1 failure in about 150 runs in the earlier lane. It passed in theproject_server_capacity_journey_testround of test(daemon): drive tracedecay journey tests by signals, not wall bounds #4174 (30/30).linked_roots_alias_one_store_producer_until_the_last_alias_shuts_downandstore_shutdown_checkpoint_test::capacity_retirement_completes_while_a_maintenance_tick_runs: both passed 30/30 in a full//crates/tracedecay:daemon_suiteround under the recipe (host load average 300 to 900). Earlier evidence shows three linked-roots failure modes, all at extreme host load:left: 4 (or 1), right: 5persisted events. The producer drops a batch whose write exceeds the fixed 2 sObservabilityProducerDeadlinesV1::persistence.restarted producer: ... delivery_settlement_recorder_already_running.expire_allreturned while a timed-out retirement drain still held the store's delivery spool lock.SQLite transaction lease expiredduring schema initialization.store runtime still held at shutdown(sessions.db,ClientLeases { count: 2 }). It followedwork owner-observation recovery shutdown deadlineandobservability_persistence_deadlinelost work. Store close spent exactly its fixed 3 s hold drain (SHUTDOWN_HOLD_DRAIN_LIMIT, from flaky: graceful stop leaves WAL when store leases are still held at close #4138) with about 9 s of the store-close phase budget left. A candidate production fix is to pass the store-close phase deadline intoclose_idle_for_shutdownin place of the fixed 3 s. It is not made here, because no current run reproduces the failure.Real-time deadline tests, left unchanged
shutdown::orchestration::tests::a_stuck_background_owner_cannot_starve_project_servers_or_store_closeanda_project_server_drain_that_ignores_its_deadline_hits_the_backstopfailed once each in one 30-run round. Both reportedleft: ["shutdown_coordinator"]: the coordinator deadline (2 s or 4 s) fired before the 50 to 300 ms phase timers.native_runtimehas no clock seam. Injecting one would mean threading a timer throughcoordinate_daemon_shutdown,run_daemon_shutdownand the owner joins, which is not a small local change.Outside this issue: daemon_suite under the recipe
The same full
daemon_suiteround failed 22 of 30 runs, all in tests not listed here:sealed_generation_crash_test::sigkill_during_the_seal_keeps_the_prior_generation_published: 19/30,index never became ready.git_watch_test::one_reconciliation_covers_a_fifty_commit_frontier: 17/30,timed out waiting for "f49".store_shutdown_checkpoint_test::stop_after_independent_owners_releases_every_project_store: 10/30,project open never reached independent_owners_registered.advanced_workflow_journey_test::mounted_fan_out_recovers_then_synthesizes_and_hands_off: 8/30,timed out waiting for project application mount.graceful_stop_truncates_profile_and_project_store_wals: 4/30,global.dbWAL 3048832 bytes.stop_during_project_open_truncates_project_store_wals: 3/30.Most of these are readiness waits bounded by wall clocks while indexing is CPU-starved. They need their own issue.
Admission time