Skip to content

docs: drain the roadmap-consistency triage backlog (iss-1..iss-15) - #5

Merged
REPPL merged 9 commits into
mainfrom
chore/roadmap-consistency-triage
Jul 8, 2026
Merged

docs: drain the roadmap-consistency triage backlog (iss-1..iss-15)#5
REPPL merged 9 commits into
mainfrom
chore/roadmap-consistency-triage

Conversation

@REPPL

@REPPL REPPL commented Jul 8, 2026

Copy link
Copy Markdown
Owner

Drains the roadmap-consistency triage backlog: all fifteen ledger issues (iss-1..iss-15) resolved, one commit per issue or severity-grouped batch, make preflight green throughout.

What this lands

  • Review landing: the roadmap-consistency review and its captured findings seed the ledger (iss-1..iss-15).
  • Two new ADRs ratify the decisions the majors forced:
    • ADR-33 — launch phase ownership is tiered: Phase 1 owns the curated-release cut; deepenings are separately scheduled intents; the roadmap phase index is the sole source of phase numbering and ownership (iss-1).
    • ADR-34 — intent lifecycle and phase scheduling are orthogonal axes; scheduled ⇒ planned/ (itd-43 and itd-7 move out of drafts/; itd-43's kind bound to standalone) (iss-3).
  • iss-2 needed no new ADR — three sites aligned to existing ADR-31 (derived versioning).
  • Minors + nitpick (iss-4..iss-14): six-vs-seven phase counts, disembark/embark banners, hand-kept counts replaced, stale out-of-scope corpus, phase-membership prose.
  • iss-15 closed as fixed-by-ADR-32 (capture ⊥ record-lint).

Notes for review

  • Record-only change: no code paths touched; CI is the same gate as always.
  • The brief README gains a delivery-state provenance note (spc-N references are predecessor spec attribution, never delivery claims); a fuller narration sweep belongs to Phase 0.5 reconciliation.

No Closes #N — these are ledger issues, not GitHub issues.

Assisted-by: Claude

REPPL added 9 commits July 8, 2026 00:15
An external consistency review of the design record landed at
.abcd/work/reviews/2026-07-07-roadmap-consistency/. Its 14 findings plus iss-15
(the capture/record-lint conflict, fixed by ADR-32) are captured to the ledger
as the tracked triage backlog, with blocked_by edges linking the dependent
majors to the criticals they wait on. Gitignore the allocator lock.

Assisted-by: Claude:claude-opus-4-8
The conflict that motivated the ledger redesign is closed by PR #4: capture no
longer writes git-inferable metadata into the record-lint root.

Assisted-by: Claude:claude-opus-4-8
The record disagreed on which phase owns /abcd:launch: the roadmap and build
sequence make install + launch the first milestone, while the brief's launch
surface still carried the pre-rebuild 'builds in Phase 5 (round-trip and ship)'
banner. ADR-33 decides: the roadmap phase index is the sole source of phase
numbering and ownership; Phase 1 owns the curated-release cut; the launch
deepenings (itd-65/66/70/72/73) are separately scheduled intents, attributed by
intent rather than phase number. The launch surface banner, its in-body Phase-5
references, and the launch-gatekeeper agent row are rewritten accordingly.

Assisted-by: Claude:claude-fable-5
Three sites still described superseded versioning models: the roadmap README
tracked releases by the working-tree plugin.json version (the tree is
unversioned per ADR-19), and the launch surface plus verification matrix
described phase-completion bump tiering with a manual --version override.
ADR-31 already decides this: the version is derived from the shipped intents'
impact, with the surface-diff guardrail; no version is ever authored. All
three sites now state that model.

Assisted-by: Claude:claude-fable-5
The intents README defined planned/ as 'scoped into a roadmap phase' while
fifteen planned intents appeared in no phase Scope and two Scope-named intents
(itd-43 Phase 0, itd-7 Phase 6) still sat in drafts/. ADR-34 decides the two
axes are orthogonal — lifecycle is commitment (directory, adr-3), scheduling
is phase Scope membership (adr-9) — with one directional invariant: scheduled
implies planned/. itd-43 and itd-7 move to planned/ (itd-43's kind bound to
standalone per its suggested_kind, which the intent_lifecycle lint requires of
planned intents); the README's planned/ definition and directory listings now
match disk.

Assisted-by: Claude:claude-fable-5
iss-6 — the brief's scope page listed seven user-facing commands while the
surfaces index lists nine; /abcd (itd-20) and /abcd:reflect (itd-24) added.
iss-9 — the glossary home is .abcd/development/brief/glossary/ (adr-30); the
Phase 3 milestone and the disembark terminology render source still pointed at
the old foundation/terminology/ path, and the glossary README's layout block
labelled the tree root terminology/. All three standardised.
iss-10 — the phases README said Phase 0 has no user-facing command while
phase-0-substrate.md deliberately carries /abcd:intent review; the README now
states the phase doc's qualifier (no product-capability user moment, one
substrate sub-verb).

Assisted-by: Claude:claude-fable-5
…ners)

Both findings are instances of the superseded six-phase numbering ADR-33
identifies. iss-4: four brief files said six planned phases (Phase 0-5); the
roadmap index has seven (Phase 0-6). iss-5: the disembark banner said Phase 4,
the embark banner Phase 5, while phase-6-lifeboat.md owns both; the agent
catalog's lifeboat-pipeline rows carried the same old numbers. All sites now
point at the owning phase doc per ADR-33.

Assisted-by: Claude:claude-fable-5
iss-7 — the brief hand-maintained a 'thirteen phased intents' count and list
that the phase docs outgrew; both sites now derive by pointer to the phase
docs' Scope sections (adr-9), keeping no static copy that can re-drift.
iss-8 — the out-of-scope enumeration omitted ten current drafts (itd-57..75)
and still included itd-43 (scheduled, moved to planned/ by ADR-34). The list
is regenerated in lockstep with the drafts/ corpus and the derivation command
loses its exclusion set: per ADR-34 a scheduled intent cannot live in drafts/,
so the filesystem is the list.

Assisted-by: Claude:claude-fable-5
iss-11 — agent count 15 -> 16 in the press release, scope page, and
prompt-quality page, each now deferring to the 01-agents.md catalog as the
canonical roster.
iss-12 — the memory docs asserted spc-38/spc-39 capability as shipped while
itd-36 sits in planned/ and nothing Go-built has shipped; the references are
demoted to spec attribution and the surface header defers delivery state to
the intent lifecycle.
iss-13 — stale status narration stripped from brief contracts (per adr-5):
false 'shipped' status cells in the agent catalog corrected to design target
(no agents/ directory exists in this repo), '(spc-N — shipped)' parentheticals
reduced to attribution, dated capture-history prose dropped from the scope
page, and a delivery-state provenance note added to the brief README covering
residual predecessor spc-N references.
iss-14 — the intent-fidelity-reviewer section moved from § 6 to § 7 of
05-intent.md; every deep link and textual reference re-anchored (the § 6
lint-rule reference in intents/README.md verified still correct).

Assisted-by: Claude:claude-fable-5
@REPPL
REPPL merged commit 3c6490a into main Jul 8, 2026
12 checks passed
@REPPL
REPPL deleted the chore/roadmap-consistency-triage branch July 8, 2026 15:10
REPPL added a commit that referenced this pull request Jul 11, 2026
* chore: land roadmap-consistency review and capture its findings

An external consistency review of the design record landed at
.abcd/work/reviews/2026-07-07-roadmap-consistency/. Its 14 findings plus iss-15
(the capture/record-lint conflict, fixed by ADR-32) are captured to the ledger
as the tracked triage backlog, with blocked_by edges linking the dependent
majors to the criticals they wait on. Gitignore the allocator lock.

Assisted-by: Claude:claude-opus-4-8

* chore: resolve iss-15 (capture ⊥ record-lint) — fixed by ADR-32

The conflict that motivated the ledger redesign is closed by PR #4: capture no
longer writes git-inferable metadata into the record-lint root.

Assisted-by: Claude:claude-opus-4-8

* docs: resolve iss-1 (launch phase ownership) — ADR-33

The record disagreed on which phase owns /abcd:launch: the roadmap and build
sequence make install + launch the first milestone, while the brief's launch
surface still carried the pre-rebuild 'builds in Phase 5 (round-trip and ship)'
banner. ADR-33 decides: the roadmap phase index is the sole source of phase
numbering and ownership; Phase 1 owns the curated-release cut; the launch
deepenings (itd-65/66/70/72/73) are separately scheduled intents, attributed by
intent rather than phase number. The launch surface banner, its in-body Phase-5
references, and the launch-gatekeeper agent row are rewritten accordingly.

Assisted-by: Claude:claude-fable-5

* docs: resolve iss-2 (release-version source of truth) — align to ADR-31

Three sites still described superseded versioning models: the roadmap README
tracked releases by the working-tree plugin.json version (the tree is
unversioned per ADR-19), and the launch surface plus verification matrix
described phase-completion bump tiering with a manual --version override.
ADR-31 already decides this: the version is derived from the shipped intents'
impact, with the surface-diff guardrail; no version is ever authored. All
three sites now state that model.

Assisted-by: Claude:claude-fable-5

* docs: resolve iss-3 (phase membership vs lifecycle) — ADR-34

The intents README defined planned/ as 'scoped into a roadmap phase' while
fifteen planned intents appeared in no phase Scope and two Scope-named intents
(itd-43 Phase 0, itd-7 Phase 6) still sat in drafts/. ADR-34 decides the two
axes are orthogonal — lifecycle is commitment (directory, adr-3), scheduling
is phase Scope membership (adr-9) — with one directional invariant: scheduled
implies planned/. itd-43 and itd-7 move to planned/ (itd-43's kind bound to
standalone per its suggested_kind, which the intent_lifecycle lint requires of
planned intents); the README's planned/ definition and directory listings now
match disk.

Assisted-by: Claude:claude-fable-5

* docs: resolve iss-6, iss-9, iss-10 (unblocked majors)

iss-6 — the brief's scope page listed seven user-facing commands while the
surfaces index lists nine; /abcd (itd-20) and /abcd:reflect (itd-24) added.
iss-9 — the glossary home is .abcd/development/brief/glossary/ (adr-30); the
Phase 3 milestone and the disembark terminology render source still pointed at
the old foundation/terminology/ path, and the glossary README's layout block
labelled the tree root terminology/. All three standardised.
iss-10 — the phases README said Phase 0 has no user-facing command while
phase-0-substrate.md deliberately carries /abcd:intent review; the README now
states the phase doc's qualifier (no product-capability user moment, one
substrate sub-verb).

Assisted-by: Claude:claude-fable-5

* docs: resolve iss-4, iss-5 (six-vs-seven phases, disembark/embark banners)

Both findings are instances of the superseded six-phase numbering ADR-33
identifies. iss-4: four brief files said six planned phases (Phase 0-5); the
roadmap index has seven (Phase 0-6). iss-5: the disembark banner said Phase 4,
the embark banner Phase 5, while phase-6-lifeboat.md owns both; the agent
catalog's lifeboat-pipeline rows carried the same old numbers. All sites now
point at the owning phase doc per ADR-33.

Assisted-by: Claude:claude-fable-5

* docs: resolve iss-7, iss-8 (hand-kept counts, stale out-of-scope corpus)

iss-7 — the brief hand-maintained a 'thirteen phased intents' count and list
that the phase docs outgrew; both sites now derive by pointer to the phase
docs' Scope sections (adr-9), keeping no static copy that can re-drift.
iss-8 — the out-of-scope enumeration omitted ten current drafts (itd-57..75)
and still included itd-43 (scheduled, moved to planned/ by ADR-34). The list
is regenerated in lockstep with the drafts/ corpus and the derivation command
loses its exclusion set: per ADR-34 a scheduled intent cannot live in drafts/,
so the filesystem is the list.

Assisted-by: Claude:claude-fable-5

* docs: resolve iss-11..iss-14 (minors + nitpick)

iss-11 — agent count 15 -> 16 in the press release, scope page, and
prompt-quality page, each now deferring to the 01-agents.md catalog as the
canonical roster.
iss-12 — the memory docs asserted spc-38/spc-39 capability as shipped while
itd-36 sits in planned/ and nothing Go-built has shipped; the references are
demoted to spec attribution and the surface header defers delivery state to
the intent lifecycle.
iss-13 — stale status narration stripped from brief contracts (per adr-5):
false 'shipped' status cells in the agent catalog corrected to design target
(no agents/ directory exists in this repo), '(spc-N — shipped)' parentheticals
reduced to attribution, dated capture-history prose dropped from the scope
page, and a delivery-state provenance note added to the brief README covering
residual predecessor spc-N references.
iss-14 — the intent-fidelity-reviewer section moved from § 6 to § 7 of
05-intent.md; every deep link and textual reference re-anchored (the § 6
lint-rule reference in intents/README.md verified still correct).

Assisted-by: Claude:claude-fable-5
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant