Skip to content

Adding md file for assembly and test procedure, krake rev2.1#330

Open
nk25719 wants to merge 23 commits intomainfrom
155-doc-factory-test-and-assembly-instructions
Open

Adding md file for assembly and test procedure, krake rev2.1#330
nk25719 wants to merge 23 commits intomainfrom
155-doc-factory-test-and-assembly-instructions

Conversation

@nk25719
Copy link
Collaborator

@nk25719 nk25719 commented Jan 11, 2026

@nk25719 nk25719 self-assigned this Jan 11, 2026
@nk25719 nk25719 added the documentation Improvements or additions to documentation label Jan 11, 2026
@nk25719 nk25719 linked an issue Jan 11, 2026 that may be closed by this pull request
ForrestErickson and others added 19 commits January 11, 2026 08:41
Add the test bench text and images.
Add text and image for grounding the LCD bezel.
Added section on Load MP3 Files to SD Card
Fix images for unpowered, powered tests.
Add test points for DB9 measurements.
Add place holders , reminders for images on Mini MP3 player.
Description of files in the PWA_REV2 folder in particular a link to the factory test document.
White space management.
Add image of LCD with only J2.
Add zip file with FreeCAD file and STL file for assembly fixture, Platfom PWA.
Added instructions for running the copy_to_sd.sh script and included screenshots of file explorer and successful copying.
Added images to the DFPlayer module section for clarity.
Added reminder for additional information about required libraries and port identification for programming that was discussed to be added within arduino ide.
Expanded the testing and programming procedure for the Mini MP3 Player and Speaker, including library requirements and connection instructions.
Added an image of the serial monitor output for clarity.
Added video link for arduino upload procedure and DF player tests.
Update for setting CONTAST before rest of powered measurements.
Added Courtney Ludick as an author and updated typical results and criteria section with a table for test points and their approximate readings for DC powered tests.
Moved powered testing instructions to before LCD & LED installation & added example measurements for unpowered testing.
Added image to help with LED cathode identification
|--------:|------------|---------------|----------------------------------|
| v0.1.0 | 2025-11-30 | Nagham Kheir | Initial draft |
| v0.2.0 | YYYY-MM-DD | [Author Name] | Added architecture diagram |
| v1.0.0 | YYYY-MM-DD | [Author Name] | Finalized for publication |
Copy link
Collaborator Author

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

We need to update the version as we do changes too the document.


1. Identify the LED footprints on the PCB and the corresponding LED colors (e.g., white vs. red).
2. For each LED:
- 5 white LED's (D201-D205)
Copy link
Collaborator Author

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Very good.

@nk25719
Copy link
Collaborator Author

nk25719 commented Feb 8, 2026

Requested Enhancement:

  • Reorder the test points to be easier to follow when doing the tests on the board.
  • Add steps to install factory test firmware and complete the firmware factory test,
  • (include the working directory of the file FactoryTest_wMenu).
  • How to capture the MAC (media access controller) address.
  • Steps to loading the gpad API, and verify that it is serving a webpage.

updating version and author information
Re ordered test point order for ease
Updated version number and reordered test point measurements for clarity on powered tests
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

documentation Improvements or additions to documentation

Projects

None yet

Development

Successfully merging this pull request may close these issues.

Doc, Factory Test and Assembly Instructions.

3 participants