You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
Calibrated 2-D Gaussian filtering rejects a singleton assembled SITE stack #980
Observed in the fresh R0010_FRESH25_94 task-only author, receiving25 on isolated display94. The original source has a 2-D calibrated plane; processing assembles SITE (one selected site), group_by NONE. Registered cellprofiler_gaussian_filter receives an assembled rank3 payload and fails: Cannot project 2-D source voxel spacing onto 3-D data. The source and failure remain preserved at /home/ts/wt/openhcs-issue-batch-20260929/next-h003-retina-fresh25-rotation-20261006/R0010_FRESH25_94/author-workspace/output/preprocess01-technical02.py and runtime/mcp.stdout (failure around16118). The author continued independently using a typed plane custom callable; its scientific run must not be replayed or hotpatched.
Current source: GaussianFilterModule and gaussian_filter in openhcs/processing/backends/cellprofiler/gaussian_filter.py. The callable is FLEXIBLE with ImagePayloadExecutionMode.FULL_STACK and obtains spacing_for_ndim(pixel_data.ndim), without distinguishing an assembled nonspatial SITE axis from physical Z. Actual execution route traverses function_contract_execution and its stack owner. Fix through existing declared axis/payload/execution owners, not a second Gaussian implementation, default spacing or per-call rank switch. Do not relax SourceVoxelSpacing validation or assign invented Z calibration to SITE.
Acceptance: calibrated 2-D plane through singleton SITE assembly succeeds; multiple independent sites are not smoothed across each other; true calibrated anisotropic Z stacks retain volumetric Gaussian semantics and sigma/spacing conversion; output geometry, source provenance and spacing remain intact. Exercise the registered installed MCP compile/execute path in an engineering destination after the coherent source fix. No reference/held-out data or science feedback is needed. Parent is assigning Planck this independent source investigation and draft PR; existing fleet owners remain unchanged. Existing closed issue419 concerns a different shape/distance route, not this Gaussian surface.
Taking source and installed acceptance ownership. The failing Gaussian FULL_STACK call uses total payload rank as physical spacing rank; the existing source-spatial domain already distinguishes intrinsic YX/ZYX from assembled source cohorts. Investigating that owner projection and channel exclusion before editing. Current #973/#977 files do not overlap the proposed runtime-image metadata/Gaussian methods. Original run, failure and installed receiving25 remain unchanged.
Fixed by merged PR #981. Independently verified remote main contains the reviewed head and merge. Installed receiving28 public MCP compile/execute passed on one A01 well with three independent SITE planes and declared physical YX spacing (0.5,0.75): runtime and persisted planes exactly match independent per-site expectations, sites2/3 remain zero, no fabricated physical Z. Installed production bytes match the merged head; complete postwriter journal seals pass and exact owned processes are closed. Receipt: engineering-gaussian-axis-outcome28-20261006/public95-path02/INSTALLED-GAUSSIAN981-ACCEPTANCE01.rst. This is calibrated-axis synthetic acceptance, not a biological segmentation claim; no hosted CI hold.
Activity
trissim commentedon Oct 6, 2026
Taking source and installed acceptance ownership. The failing Gaussian FULL_STACK call uses total payload rank as physical spacing rank; the existing source-spatial domain already distinguishes intrinsic YX/ZYX from assembled source cohorts. Investigating that owner projection and channel exclusion before editing. Current #973/#977 files do not overlap the proposed runtime-image metadata/Gaussian methods. Original run, failure and installed receiving25 remain unchanged.
trissim commentedon Oct 6, 2026
Fixed by merged PR #981. Independently verified remote main contains the reviewed head and merge. Installed receiving28 public MCP compile/execute passed on one A01 well with three independent SITE planes and declared physical YX spacing (0.5,0.75): runtime and persisted planes exactly match independent per-site expectations, sites2/3 remain zero, no fabricated physical Z. Installed production bytes match the merged head; complete postwriter journal seals pass and exact owned processes are closed. Receipt: engineering-gaussian-axis-outcome28-20261006/public95-path02/INSTALLED-GAUSSIAN981-ACCEPTANCE01.rst. This is calibrated-axis synthetic acceptance, not a biological segmentation claim; no hosted CI hold.