Skip to content

Milestones

List view

  • Gaps against Freqtrade 2026.7, Hummingbot v2.16.0 and Jesse 3.0.7, ranked. Organising principle: every competitor's validation tooling is a diagnostic the user may ignore; keel's promotion gate refuses. Adopt their validation EVIDENCE as gate inputs rather than importing their features. Design boundaries (shorting, leverage, futures, market making, arbitrage, ML, market-data-driven pair selection, hyperopt) are recorded in the PRD as explicit non-goals. See docs/superpowers/specs/2026-08-20-competitive-gap-analysis-prd.md

    No due date
    0/8 issues closed
  • A first-time user downloads one file, installs, and reaches a working keel without typing a command. Blocked on four architectural properties before any packaging step is meaningful: CWD-relative state, the un-overridable TTY gate, curses-on-Windows, and a first-run ceremony that includes decisions no installer can make. See the PRD: docs/superpowers/specs/2026-08-20-desktop-distribution-prd.md

    No due date
    3/6 issues closed
  • US equities through the broker port: a keel-broker-alpaca adapter (Alpaca Trading API, paper first) that passes the port conformance suite with zero changes to the engine core, an equities paper profile accruing hash-chained evidence, and a cost-fidelity restatement (regulatory fees, spread, data tiers) benchmarked against DCA on the same tickers. PRD: docs/superpowers/specs/2026-08-18-keel-broker-alpaca-prd.md Lineage: Phase 5 — Broker port & second venue (milestone 8; #233 capability-based venue visibility and #198 Robinhood live-path prerequisites remain open there and interact with this work). Hard constraints carried from the PRD: long-only spot, cash accounts only (no margin — riba; also sidesteps PDT's margin threshold), per-(venue, instrument) attested screening with operator-supplied classifications, no live path in any phase.

    No due date
    2/6 issues closed
  • Phase 11 — Evidence expansion & operational guardrails. DONE: #349 (fetch honors config granularities, shipped in 0.9.1), #351 (universe 8→19 behind a measured 15-minute health screen; 19 hourly rules at paper; kill switch opened by the operator 2026-08-18; first cycle verified). REMAINING: #350 spread-gate rail (live-path half of the Tier-2 guardrail — ship before any live resumption), #352 pullback hourly-backtest perf regression, #353 n=100 forward-evidence review (accruing at ~940 signals/yr pooled; review scheduled 2026-09-30 — the milestone's due date). Progress board: https://github.com/orgs/CodeGateSoftware/projects/13

    Due by September 30, 2026
    7/7 issues closed
  • Wire the keel.brokers registry to the live path so a second venue is reachable. Covers the Robinhood adapter's remaining prerequisites, venue visibility/capability gating, and retiring the hardcoded CoinbaseClient in _build_broker.

    No due date
    11/15 issues closed