Skip to content

chore: release 2.1.0 - #72

Merged
7vignesh merged 1 commit into
mainfrom
chore/release-2.1.0
Oct 27, 2026
Merged

7vignesh merged 1 commit into
mainfrom
chore/release-2.1.0

Conversation

@7vignesh

Copy link
Copy Markdown
Owner

Release 2.1.0.

Bumps package.json and package-lock.json from 2.0.0 to 2.1.0. No code changes.

Why

main is 16 commits ahead of the published v2.0.0, so none of that work is on npm. This cuts a release. Notable since 2.0.0:

Minor bump per semver: new backward-compatible features (the tag filter adds optional params; indexing tags in FTS improves recall without changing signatures).

Release steps (after merge)

  1. Merge this PR into main.
  2. Tag the merge commit v2.1.0 and push the tag.
  3. .github/workflows/publish.yml fires on the v* tag, re-checks the tag matches package.json, runs npm run ci, and publishes.

Verification

npm run ci green locally.

Release 2.1.0. Ships the backlog merged to main since v2.0.0, notably:
- Index memory tags in FTS (#58 / #69)
- Tag-filtered retrieval on get_context and search_memory (#59 / #71)

Pushing the v2.1.0 tag after this merges triggers the npm publish workflow,
which re-checks that the tag matches package.json before publishing.
@vercel

vercel Bot commented Oct 27, 2026

Copy link
Copy Markdown

The latest updates on your projects. Learn more about Vercel for GitHub.

Project Deployment Actions Updated
fossel Ready Ready Preview Oct 27, 2026 1:08pm UTC

@7vignesh
7vignesh merged commit bee27b8 into main Oct 27, 2026
6 checks passed
@7vignesh
7vignesh deleted the chore/release-2.1.0 branch October 27, 2026 13:10

This branch was successfully deployed

1 active deployment
Preview — 33c1c3b8 Deployed Oct 27, 2026 by vercel[bot]
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant