Skip to content

fix(deploy): resolve hosted framework bundles with Worker conditions #2444

fix(deploy): resolve hosted framework bundles with Worker conditions

fix(deploy): resolve hosted framework bundles with Worker conditions #2444

Triggered via pull request October 26, 2026 06:15
Status Failure
Total duration 4m 49s
Artifacts –

ci.yml

on: pull_request
Matrix: checks
Matrix: test
live-e2e
0s
live-e2e
Fit to window
Zoom out
Zoom in

Annotations

3 errors and 1 notice
test (ubuntu-latest, 1/2)
Process completed with exit code 1.
[parallel-integration] packages/void/test/integration/astro.test.ts > playground/astro dev: test/integration-helpers.ts#L308
Error: Timed out waiting for server at http://127.0.0.1:44763 (waited 20000ms, scale=1) Server stdout: ~/playground/astro$ astro dev --host 127.0.0.1 --port 44763 ⊘ cache disabled 06:17:14 [@astrojs/cloudflare] Enabling image processing with Cloudflare Images for production with the "IMAGES" Images binding. 6:17:14 AM [void] Applied 1 migration(s): 20260412171331_serious_mindworm.sql 06:17:16 [WARN] [vite] Failed to resolve dependency: drizzle-orm/sqlite-core, present in ssr 'optimizeDeps.include' 06:17:21 [types] Generated 1ms 06:17:21 [WARN] [vite] Failed to resolve dependency: drizzle-orm/sqlite-core, present in client 'optimizeDeps.include' 06:17:21 [WARN] [vite] Failed to resolve dependency: drizzle-orm/sqlite-core, present in astro 'optimizeDeps.include' astro v7.4.0 ready in 9751 ms ┃ Local http://127.0.0.1:44763/ 06:17:21 watching for file changes... 6:17:21 AM [void] Detected 1 cron. Trigger locally: curl -X POST http://localhost:44763/__void/scheduled \ -H "x-void-dev-trigger: c34f4cbf-6703-41b2-be52-6a1a5c395414" \ -d '{"cron":"0 * * * *","scheduledTime":'"$(date +%s000)"'}' 06:17:26 [vite] dependency optimized: drizzle-orm/sqlite-core 06:17:26 [vite] optimized dependencies changed. reloading 06:17:26 [vite] [vite] program reload 06:17:28 [vite] 06:17:28 [200] / 6374ms Server stderr: ❯ waitForServer test/integration-helpers.ts:308:9 ❯ startServer test/integration-helpers.ts:210:7 ❯ startDev packages/void/test/integration/astro.test.ts:55:20 ❯ packages/void/test/integration/astro.test.ts:89:5
done
Process completed with exit code 1.
done
"The ubuntu-latest label will migrate to Ubuntu 26 beginning October 19, 2026. For more information, see https://github.com/actions/runner-images/issues/14748"