Skip to content

update structure

update structure #2

Triggered via push June 7, 2025 21:33
Status Failure
Total duration 19s
Artifacts

tests.yml

on: push
Matrix: test
Lint with pre-commit
12s
Lint with pre-commit
Build package
0s
Build package
Fit to window
Zoom out
Zoom in

Annotations

8 errors
Test on Python 3.10
Process completed with exit code 1.
Test on Python 3.9
The operation was canceled.
Test on Python 3.9
The strategy configuration was canceled because "test._3_10" failed
Test on Python 3.11
The operation was canceled.
Test on Python 3.11
The strategy configuration was canceled because "test._3_10" failed
Test on Python 3.12
The operation was canceled.
Test on Python 3.12
The strategy configuration was canceled because "test._3_10" failed
Lint with pre-commit
Process completed with exit code 1.