Skip to content

chore(deps): bump pnpm/action-setup from 5.0.0 to 6.0.0 #95

chore(deps): bump pnpm/action-setup from 5.0.0 to 6.0.0

chore(deps): bump pnpm/action-setup from 5.0.0 to 6.0.0 #95

Triggered via pull request April 20, 2026 22:40
Status Failure
Total duration 25s
Artifacts

ci.yml

on: pull_request
Matrix: test-matrix
Fit to window
Zoom out
Zoom in

Annotations

8 errors
Test Matrix (Node 20)
Process completed with exit code 1.
Test Matrix (Node 22)
The strategy configuration was canceled because "test-matrix._20" failed
Test Matrix (Node 22)
The operation was canceled.
Test Matrix (Node 18)
The strategy configuration was canceled because "test-matrix._20" failed
Test Matrix (Node 18)
The operation was canceled.
Lint
Process completed with exit code 1.
Test
Process completed with exit code 1.
Test
At least one Node compatibility test failed.