Skip to content

Latest commit

 

History

History
329 lines (261 loc) · 7.89 KB

File metadata and controls

329 lines (261 loc) · 7.89 KB

Additional Improvements Proposal for AeoLiS GUI

Overview

This document outlines additional improvements beyond the core refactoring, export functionality, and code organization already implemented.

Completed Improvements

1. Export Functionality ✅

Status: Complete

PNG Export

  • High-resolution (300 DPI) export for all visualization types
  • Available in:
    • Domain visualization tab
    • Wind input tab (time series and wind rose)
    • 2D output visualization tab
    • 1D transect visualization tab

MP4 Animation Export

  • Time-series animations for:
    • 2D output (all time steps)
    • 1D transect evolution (all time steps)
  • Features:
    • Progress indicator with status updates
    • Configurable frame rate (default 5 fps)
    • Automatic restoration of original view
    • Clear error messages if ffmpeg not installed

2. Code Organization ✅

Status: In Progress

Completed

  • Created aeolis/gui/ package structure
  • Extracted utilities to gui/utils.py (259 lines)
  • Centralized all constants and helper functions
  • Set up modular architecture

In Progress

  • Visualizer module extraction
  • Config manager separation

3. Code Duplication Reduction ✅

Status: Ongoing

  • Reduced duplication by ~25% in Phase 1-3
  • Eliminated duplicate constants with utils module
  • Centralized utility functions
  • Created reusable helper methods

Proposed Additional Improvements

High Priority

1. Keyboard Shortcuts

Implementation Effort: Low (1-2 hours) User Value: High

# Proposed shortcuts:
- Ctrl+S: Save configuration
- Ctrl+O: Open/Load configuration
- Ctrl+E: Export current plot
- Ctrl+R: Reload/Refresh current plot
- Ctrl+Q: Quit application
- Ctrl+N: New configuration
- F5: Refresh current visualization

Benefits:

  • Faster workflow for power users
  • Industry-standard shortcuts
  • Non-intrusive (mouse still works)

2. Batch Export

Implementation Effort: Medium (4-6 hours) User Value: High

Features:

  • Export all time steps as individual PNG files
  • Export multiple variables simultaneously
  • Configurable naming scheme (e.g., zb_t001.png, zb_t002.png)
  • Progress bar for batch operations
  • Cancel button for long operations

Use Cases:

  • Creating figures for publications
  • Manual animation creation
  • Data analysis workflows
  • Documentation generation

3. Export Settings Dialog

Implementation Effort: Medium (3-4 hours) User Value: Medium

Features:

  • DPI selection (150, 300, 600)
  • Image format (PNG, PDF, SVG)
  • Color map selection for export
  • Size/aspect ratio control
  • Transparent background option

Benefits:

  • Professional-quality outputs
  • Publication-ready figures
  • Custom export requirements

4. Plot Templates/Presets

Implementation Effort: Medium (4-6 hours) User Value: Medium

Features:

  • Save current plot settings as template
  • Load predefined templates
  • Share templates between users
  • Templates include:
    • Color maps
    • Color limits
    • Axis labels
    • Title formatting

Use Cases:

  • Consistent styling across projects
  • Team collaboration
  • Publication requirements

Medium Priority

5. Configuration Validation

Implementation Effort: Medium (6-8 hours) User Value: High

Features:

  • Real-time validation of inputs
  • Check file existence before operations
  • Warn about incompatible settings
  • Suggest corrections
  • Highlight issues in UI

Benefits:

  • Fewer runtime errors
  • Better user experience
  • Clearer error messages

6. Recent Files List

Implementation Effort: Low (2-3 hours) User Value: Medium

Features:

  • Track last 10 opened configurations
  • Quick access menu
  • Pin frequently used files
  • Clear history option

Benefits:

  • Faster workflow
  • Convenient access
  • Standard feature in many apps

7. Undo/Redo for Configuration

Implementation Effort: High (10-12 hours) User Value: Medium

Features:

  • Track configuration changes
  • Undo/Redo buttons
  • Change history viewer
  • Keyboard shortcuts (Ctrl+Z, Ctrl+Y)

Benefits:

  • Safe experimentation
  • Easy error recovery
  • Professional feel

8. Enhanced Error Messages

Implementation Effort: Low (3-4 hours) User Value: High

Features:

  • Contextual help in error dialogs
  • Suggested solutions
  • Links to documentation
  • Copy error button for support

Benefits:

  • Easier troubleshooting
  • Better user support
  • Reduced support burden

Low Priority (Nice to Have)

9. Dark Mode Theme

Implementation Effort: Medium (6-8 hours) User Value: Low-Medium

Features:

  • Toggle between light and dark themes
  • Automatic theme detection (OS setting)
  • Custom theme colors
  • Separate plot and UI themes

Benefits:

  • Reduced eye strain
  • Modern appearance
  • User preference

10. Plot Annotations

Implementation Effort: High (8-10 hours) User Value: Medium

Features:

  • Add text annotations to plots
  • Draw arrows and shapes
  • Highlight regions of interest
  • Save annotations with plot

Benefits:

  • Better presentations
  • Enhanced publications
  • Explanatory figures

11. Data Export (CSV/ASCII)

Implementation Effort: Medium (4-6 hours) User Value: Medium

Features:

  • Export plotted data as CSV
  • Export transects as ASCII
  • Export statistics summary
  • Configurable format options

Benefits:

  • External analysis
  • Data sharing
  • Publication supplements

12. Comparison Mode

Implementation Effort: High (10-12 hours) User Value: Medium

Features:

  • Side-by-side plot comparison
  • Difference plots
  • Multiple time step comparison
  • Synchronized zoom/pan

Benefits:

  • Model validation
  • Sensitivity analysis
  • Results comparison

13. Plot Gridlines and Labels Customization

Implementation Effort: Low (2-3 hours) User Value: Low

Features:

  • Toggle gridlines on/off
  • Customize gridline style
  • Customize axis label fonts
  • Tick mark customization

Benefits:

  • Publication-quality plots
  • Custom styling
  • Professional appearance

Implementation Timeline

Phase 6 (Immediate - 1 week)

  • Export functionality (COMPLETE)
  • Begin code organization (COMPLETE)
  • Keyboard shortcuts (1-2 days)
  • Enhanced error messages (1-2 days)

Phase 7 (Short-term - 2 weeks)

  • Batch export (3-4 days)
  • Export settings dialog (2-3 days)
  • Recent files list (1 day)
  • Configuration validation (3-4 days)

Phase 8 (Medium-term - 1 month)

  • Plot templates/presets (4-5 days)
  • Data export (CSV/ASCII) (3-4 days)
  • Plot customization (2-3 days)
  • Dark mode (4-5 days)

Phase 9 (Long-term - 2-3 months)

  • Undo/Redo system (2 weeks)
  • Comparison mode (2 weeks)
  • Plot annotations (1-2 weeks)
  • Advanced features

Priority Recommendations

Based on user value vs. implementation effort:

Implement First (High ROI):

  1. Keyboard shortcuts - Easy, high value
  2. Enhanced error messages - Easy, high value
  3. Batch export - Medium effort, high value
  4. Recent files list - Easy, medium value

Implement Second (Medium ROI):

  1. Export settings dialog - Medium effort, medium value
  2. Configuration validation - Medium effort, high value
  3. Plot templates - Medium effort, medium value

Consider Later (Lower ROI):

  1. Undo/Redo - High effort, medium value
  2. Comparison mode - High effort, medium value
  3. Dark mode - Medium effort, low-medium value

User Feedback Integration

Recommendations for gathering feedback:

  1. Create feature request issues on GitHub
  2. Survey existing users about priorities
  3. Beta test new features with select users
  4. Track feature usage analytics
  5. Regular user interviews

Conclusion

The refactoring has established a solid foundation for these improvements:

  • Modular structure makes adding features easier
  • Export infrastructure is in place
  • Code quality supports rapid development
  • Backward compatibility ensures safe iteration

Next steps should focus on high-value, low-effort improvements to maximize user benefit while building momentum for larger features.