Background
Phase 14 (phase/14-eval-optimization) closes once all Elo-positive changes have cleared SPRT and been accumulated on the branch. This issue is the merge gate.
Pre-Merge Checklist
SPRT verdicts — must be recorded and acted on:
Quality gates:
Documentation:
Work Required
- Run a full test
- Use
release.yml to create a new release
Acceptance Criteria
Background
Phase 14 (
phase/14-eval-optimization) closes once all Elo-positive changes have cleared SPRT and been accumulated on the branch. This issue is the merge gate.Pre-Merge Checklist
SPRT verdicts — must be recorded and acted on:
Quality gates:
engine-coretest suite: 0 failures, ≤2 skipsengine-tunertest suite: 0 failures, ≤1 skipv0.5.7baseline: at least one SPRT H1 was accepted (phase closes with a real improvement, not a wash)Documentation:
dev-entries/phase-14.mdcomplete: all issue verdicts, tuning runs, SPRT tables, and final recommended pipeline documentedCHANGELOG.mdPhase 14 entry completeWork Required
release.ymlto create a new releaseAcceptance Criteria
developbranch has clean CI (all tests green)0.5.8-SNAPSHOTin allpom.xmlfilesv0.5.7tag pusheddev-entries/phase-14.mdcommittedCHANGELOG.mdPhase 14 entry complete