You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
Commit e8637c2
Browse filesBrowse the repository at this point in the historyBrowse files
Let the Action resume a scan under a changed time budget
d700ac1 compared the saved command line with the one the Action builds,
including -max-duration, so continuing a scan stopped at one budget with
another (as the CI resume test does, 2s then 5m) started a new scan.
The time budget is now left out on both sides, in both its "-max-duration
X" and "-max-duration=X" forms; it never changes what is scanned, and
the inputs key already left it out.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
0 commit comments