You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
Commit 68b24c6
Browse filesBrowse the repository at this point in the historyBrowse files
Build the brace from named post stations and U-wrap the rail collars so the bay reads as a fence instead of a hypot-box with coplanar straps.
Signed-off-by: TMHSDigital <154358121+TMHSDigital@users.noreply.github.com>
Co-authored-by: Cursor <cursoragent@cursor.com>
<aclass="card-media" href="fence-kit/" aria-label="fence-kit example detail page">
978
-
<imgsrc="assets/fence-kit-hero.webp" alt="fence-kit — A procedural post-and-rail fence section through UVs, bake, LOD, collider, and Unity glTF, asserting recomputed budgets rather than an API contract." loading="lazy" decoding="async" />
978
+
<imgsrc="assets/fence-kit-hero.webp" alt="fence-kit — A procedural post-and-rail fence section whose brace is an oriented box between named post stations, through UVs, bake, LOD, collider, and Unity glTF…" loading="lazy" decoding="async" />
979
979
</a>
980
980
<divclass="card-body">
981
981
<h2><ahref="fence-kit/">fence-kit</a></h2>
982
-
<pclass="teaches">A procedural post-and-rail fence section through UVs, bake, LOD, collider, and Unity glTF, asserting recomputed budgets rather than an API contract.</p>
983
-
<pclass="witnesses"><spanclass="tag">witnesses</span> Recomputed: 1212 tris, two materials with 120 metal faces, UVs in 0..1 with zero AABB overlap, outer AABB 1.642×0.157×1.235 m, LOD ratios in band, convex collider 62 tris, non-empty glTF. --skip-decimate exits 9 on the LOD1 ratio budget.</p>
982
+
<pclass="teaches">A procedural post-and-rail fence section whose brace is an oriented box between named post stations, through UVs, bake, LOD, collider, and Unity glTF, asserting recomputed budgets rather than an API contract.</p>
983
+
<pclass="witnesses"><spanclass="tag">witnesses</span> Recomputed: 1092 tris, two materials with 156 metal and 390 wood faces, UVs in 0..1 with zero AABB overlap, outer AABB 1.624×0.134×1.232 m, grounded zmin, 2 iron shoes, brace-to-post gap 2.4 mm on both posts, rail-to-post gap 0.93 mm, rail span 1.390 m, LOD ratios in band (5.2 COLLAPSE leaner on LOD2), convex collider 32 tris, hygiene all zero, non-empty glTF. --skip-decimate exits 9; --stray-vert 15; --lift-z/--short-shoes 16; --short-brace 17; --gap-rails 18; --long-rails 19.</p>
984
984
<aclass="card-link" href="fence-kit/">View example <spanaria-hidden="true">→</span></a>
0 commit comments