Parent Goal: #80
Depends on: Scheduler configuration and queue drain proof
Blocks: Production go/no-go evidence
Objective
Capture scheduler runbook evidence, including cadence, monitoring, failure handling, and operator escalation.
Expected Surfaces
Scope
- Confirm runbook instructions match actual scheduler design.
- Record how operators verify scheduler health.
- Record failure/retry/escalation guidance.
Non-Goals
- Do not create a separate evidence packet issue.
- Do not expand into unrelated Edge Function hardening.
Guardrails
Acceptance Criteria
Validation Plan
- Review runbook against actual scheduler settings.
- Confirm evidence links and commands are present.
Stop Condition
Stop after scheduler runbook evidence is captured or doc update work is explicitly opened.
Parent Goal: #80
Depends on: Scheduler configuration and queue drain proof
Blocks: Production go/no-go evidence
Objective
Capture scheduler runbook evidence, including cadence, monitoring, failure handling, and operator escalation.
Expected Surfaces
docs/engineering/wallet-release-runbook.mdScope
Non-Goals
Guardrails
Acceptance Criteria
Validation Plan
Stop Condition
Stop after scheduler runbook evidence is captured or doc update work is explicitly opened.